{"id":199621,"date":"2025-08-15T20:18:01","date_gmt":"2025-08-15T17:18:01","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=199621"},"modified":"2025-08-15T22:14:04","modified_gmt":"2025-08-15T19:14:04","slug":"smart-gunesten-nigde-bor-geste-kismi-uretim-baslangici","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/smart-gunesten-nigde-bor-geste-kismi-uretim-baslangici\/","title":{"rendered":"(Turkish) Smart G\u00fcne\u015f\u2019ten Ni\u011fde Bor GES\u2019te K\u0131smi \u00dcretim Ba\u015flang\u0131c\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/199621\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Smart G\u00fcne\u015f Enerjisi Teknolojileri Ara\u015ft\u0131rma Geli\u015ftirme \u00dcretim Sanayi ve Ticaret A.\u015e., y\u00fczde 100 ba\u011fl\u0131 ortakl\u0131\u011f\u0131 Smart GES \u00dcretim A.\u015e. arac\u0131l\u0131\u011f\u0131yla ger\u00e7ekle\u015ftirdi\u011fi Ni\u011fde Bor G\u00fcne\u015f Enerjisi Santrali projesinde \u00f6nemli bir a\u015famaya ge\u00e7ti. \u015eirket, 100 MWe (130 MWm) kurulu kapasiteye sahip santralin 25,04 MWe\u2019lik k\u0131sm\u0131nda k\u0131smi kabul\u00fcn Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan tamamland\u0131\u011f\u0131n\u0131 bildirdi. B\u00f6ylece tesisin bu b\u00f6l\u00fcm\u00fcnde ticari elektrik \u00fcretimine ba\u015flan\u0131rken, kalan kapasite de kabul s\u00fcre\u00e7lerinin sonu\u00e7lanmas\u0131n\u0131n ard\u0131ndan devreye al\u0131nacak.<\/strong><\/h2>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-199622 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/nigde-smart-1200x1200-1.jpg\" alt=\"\" width=\"550\" height=\"413\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/nigde-smart-1200x1200-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/nigde-smart-1200x1200-1-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/nigde-smart-1200x1200-1-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/nigde-smart-1200x1200-1-67x50.jpg 67w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<h3><strong style=\"font-size: 16px\">\u015eirketin KAP\u2019a g\u00f6nderdi\u011fi a\u00e7\u0131klama \u015fu \u015fekilde:<\/strong><\/h3>\n<p>Bilindi\u011fi \u00fczere 8 Nisan 2022 tarihinde, T.C. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 Enerji \u0130\u015fleri Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan 14.07.2021 tarih ve 31541 say\u0131l\u0131 Resm\u00ee Gazete de yay\u0131nlanan, g\u00fcne\u015f enerjisine dayal\u0131 yenilenebilir enerji kaynak alanlar\u0131 ve ba\u011flant\u0131 kapasitelerinin tahsisine ili\u015fkin YEKA-4 BOR-1 ihalesinde \u015eirketimizin %100 ba\u011fl\u0131 ortakl\u0131\u011f\u0131 Smart GES \u00dcretim A.\u015e. en iyi teklifi vererek yar\u0131\u015fmay\u0131 kazanm\u0131\u015ft\u0131. Bu kapsamda \u00f6zkaynak kullan\u0131m\u0131 ve yat\u0131r\u0131m te\u015fvikleri de al\u0131narak 100 MWe (130 MWm) \u00fcretim kapasiteli, yerli h\u00fccre kullan\u0131m\u0131n\u0131n gerekli oldu\u011fu G\u00fcne\u015f Enerjisi Santrali yap\u0131m\u0131na ba\u015flanm\u0131\u015ft\u0131.<\/p>\n<p>\u015eirketimizin yerli g\u00fcne\u015f h\u00fccre \u00fcretimini hayata ge\u00e7irmesiyle birlikte, Alia\u011fa Entegre Tesisimizde yerli g\u00fcne\u015f h\u00fccresi ile \u00fcretilen yerli g\u00fcne\u015f panelleri kullan\u0131larak 100 MWe (130 MWe) g\u00fc\u00e7 \u00fcretme kapasiteli Ni\u011fde Bor G\u00fcne\u015f Enerjisi Santralinin yap\u0131m s\u00fcrecinde Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019na k\u0131smi ge\u00e7ici kabul ba\u015fvurular\u0131 ba\u015flam\u0131\u015f olup, kabul s\u00fcre\u00e7leri devam etmektedir.<\/p>\n<p>Tesisin 25,04 MWe (32,59 MWm) k\u0131smi \u00fcretim kapasitesi i\u00e7in Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 k\u0131smi kabul\u00fc bug\u00fcn tamamlanm\u0131\u015f olup, tesiste bu k\u0131s\u0131m i\u00e7in ticari elektrik \u00fcretilmeye ve \u015febekeye verilmeye ba\u015flanm\u0131\u015ft\u0131r. Kalan kapasite i\u00e7in de yap\u0131lan kabul ba\u015fvurular\u0131 resmi olarak sonu\u00e7land\u0131k\u00e7a devreye al\u0131nacak ve gerekli a\u00e7\u0131klamalar yap\u0131lacakt\u0131r.<\/p>\n<p>Tesisimizin \u00fclkemize, milletimize, \u015firketimiz ve sekt\u00f6r\u00fcm\u00fcze hay\u0131rl\u0131 olmas\u0131n\u0131 dileriz.<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Smart G\u00fcne\u015f Enerjisi Teknolojileri Ara\u015ft\u0131rma Geli\u015ftirme \u00dcretim Sanayi ve Ticaret A.\u015e., y\u00fczde 100 ba\u011fl\u0131 ortakl\u0131\u011f\u0131 Smart GES \u00dcretim A.\u015e. arac\u0131l\u0131\u011f\u0131yla ger\u00e7ekle\u015ftirdi\u011fi Ni\u011fde [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":199622,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[117008,101750],"views":13,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/199621"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=199621"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/199621\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/199622"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=199621"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=199621"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=199621"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}