{"id":19949,"date":"2013-12-26T10:18:52","date_gmt":"2013-12-26T07:18:52","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=19949"},"modified":"2013-12-26T10:18:52","modified_gmt":"2013-12-26T07:18:52","slug":"tekirdaga-494-mwlik-badem-res-projesi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tekirdaga-494-mwlik-badem-res-projesi\/","title":{"rendered":"(Turkish) Tekirda\u011f\u2019a 49,4 MW\u2019l\u0131k Badem RES Projesi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/19949\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Badem Yenilenebilir Enerji ve Elektrik \u00dcretim A.\u015e. taraf\u0131ndan Tekirda\u011f\u2019da 49,4 MW\u2019l\u0131k Badem RES\u2019in kurulmas\u0131na ili\u015fkin \u00e7al\u0131\u015fmalar ba\u015flad\u0131. Firma, \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) ba\u015fvurusunu yaparken, proje i\u00e7in \u00c7ED ba\u015fvurusunu uygun g\u00f6ren \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131 \u00c7ED toplant\u0131lar\u0131n\u0131 \u00f6n\u00fcm\u00fczdeki g\u00fcnlerde ba\u015flatacak.<\/strong><\/p>\n<p><strong>PROJE \u0130\u00c7\u0130N 98,8 M\u0130LYON TL YATIRIM YAPILACAK<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/tekirdag-a-494-mwlik-badem-res-projesi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-19950\" title=\"tekirdag-a-494-mwlik-badem-res-projesi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/tekirdag-a-494-mwlik-badem-res-projesi-300x212.jpg\" alt=\"\" width=\"300\" height=\"212\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/tekirdag-a-494-mwlik-badem-res-projesi-300x212.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/tekirdag-a-494-mwlik-badem-res-projesi-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/tekirdag-a-494-mwlik-badem-res-projesi.jpg 414w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><br \/>\nProje\u2019nin yakla\u015f\u0131k yat\u0131r\u0131m maliyeti \u00c7ED ba\u015fvurusunda 98,8 milyon TL olarak belirlendi.<\/p>\n<p>Proje kapsam\u0131nda, Tekirda\u011f \u0130li, \u015eark\u00f6y \u0130l\u00e7esi, \u00c7engelli, \u0130\u011fdeba\u011flar\u0131, Tepek\u00f6y, Kirazl\u0131, Yukar\u0131kalam\u0131\u015f, \u00c7\u0131nar, M\u00fcrefte ve Ho\u015fk\u00f6y K\u00f6yleri Mevkii\u2019nde her biri 2,6 MW Kurulu g\u00fcc\u00fcnde 19 t\u00fcrbinden olu\u015fan toplam 49,4 MW kurulu g\u00fcce sahip \u201cBadem R\u00fczgar Enerji Santrali Projesi\u201d kurulmas\u0131 ve i\u015fletilmesi planlan\u0131yor.<\/p>\n<p>Proje i\u00e7in; haz\u0131rl\u0131k a\u015famas\u0131 22, in\u015faat d\u00f6nemi 30 ay olmak \u00fczere toplam yat\u0131r\u0131m s\u00fcresi 52 ay olarak planlanmakta olup, projenin in\u015faat a\u015famas\u0131nda 20 ki\u015fi ve i\u015fletme a\u015famas\u0131nda 7 ki\u015fi \u00e7al\u0131\u015facak.<\/p>\n<p><strong>R\u00dcZGAR \u00d6L\u00c7\u00dcM \u0130STASYONU KURULUM RAPORU VER\u0130LD\u0130<\/strong><br \/>\nBadem RES Projesi i\u00e7in Meteoroloji Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019ne r\u00fczgar \u00f6l\u00e7\u00fcm istasyon kurulum kabul\u00fc i\u00e7in ba\u015fvurulmu\u015f olup, Meteoroloji Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan R\u00fczgar \u00d6l\u00e7\u00fcm \u0130stasyonu Kurulum Raporu verildi\u011fi belirlendi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/tekirdaga-494-mwlik-badem-res-projesi_6299.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Badem Yenilenebilir Enerji ve Elektrik \u00dcretim A.\u015e. taraf\u0131ndan Tekirda\u011f\u2019da 49,4 MW\u2019l\u0131k Badem RES\u2019in kurulmas\u0131na ili\u015fkin \u00e7al\u0131\u015fmalar ba\u015flad\u0131. Firma, \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) ba\u015fvurusunu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":19950,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[11616,11615,2878,4275,63,67,1009,165,474,69,16,231],"views":1049,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19949"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=19949"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19949\/revisions"}],"predecessor-version":[{"id":19952,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19949\/revisions\/19952"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/19950"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=19949"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=19949"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=19949"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}