{"id":199442,"date":"2025-08-11T15:49:14","date_gmt":"2025-08-11T12:49:14","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=199442"},"modified":"2025-08-11T15:49:44","modified_gmt":"2025-08-11T12:49:44","slug":"kazakistandaki-nukleer-santral-insaati-calismalarina-baslandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kazakistandaki-nukleer-santral-insaati-calismalarina-baslandi\/","title":{"rendered":"(Turkish) Kazakistan\u2019daki N\u00fckleer Santral \u0130n\u015faat\u0131 \u00c7al\u0131\u015fmalar\u0131na Ba\u015fland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/199442\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2 class=\"fr-tag\">Kazakistan&#8217;\u0131n Almat\u0131 b\u00f6lgesinde bulunan Jamb\u0131l il\u00e7esinin \u00dclken k\u00f6y\u00fcnde yap\u0131lmas\u0131 planlanan n\u00fckleer g\u00fc\u00e7 santrali (NGS) in\u015faat projesinin ilk \u00e7al\u0131\u015fmalar\u0131 ba\u015flad\u0131. Bu \u00e7al\u0131\u015fmalar, gelecekteki y\u00fcksek kapasiteli NGS i\u00e7in en uygun sahay\u0131 belirlemeyi ve tasar\u0131m belgelerini haz\u0131rlamay\u0131 ama\u00e7layan m\u00fchendislik ara\u015ft\u0131rmalar\u0131n\u0131 kaps\u0131yor. \u00c7al\u0131\u015fmalar, Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu Rosatom Genel M\u00fcd\u00fcr\u00fc Aleksey Likhachev, Kazakistan Cumhuriyeti Atom Enerjisi Ajans\u0131 Ba\u015fkan\u0131 Almasadam Satkaliyev ve Almat\u0131 B\u00f6lgesi Valisi Marat Sultangaziyev\u2019in kat\u0131l\u0131m\u0131yla ba\u015flad\u0131.<\/h2>\n<p><img loading=\"lazy\" class=\"size-full wp-image-199443 aligncenter\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/atm-73566.jpg\" alt=\"\" width=\"550\" height=\"367\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/atm-73566.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/atm-73566-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/atm-73566-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/atm-73566-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/atm-73566-450x300.jpg 450w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p class=\"fr-tag\">Rosatom M\u00fchendislik B\u00f6l\u00fcm\u00fc uzmanlar\u0131 \u00e7al\u0131\u015fmalar kapsam\u0131nda ilk ke\u015fif sondaj\u0131n\u0131 yaparak topraktan numune ald\u0131. Bu \u00e7al\u0131\u015fmalarla, NGS\u2019nin g\u00fcvenli\u011fi i\u00e7in hayati \u00f6nem ta\u015f\u0131yan sismik kararl\u0131l\u0131k, hidrojeolojik \u00f6zellikler ve b\u00f6lgenin di\u011fer parametreleri de\u011ferlendirilecek. Bu a\u015famada, her biri 30 ila 120 metre derinli\u011finde olmak \u00fczere toplamda en az 50 sondaj kuyusu a\u00e7\u0131lacak. Santralin kesin konumuna ili\u015fkin nihai karar, ara\u015ft\u0131rma sonu\u00e7lar\u0131na g\u00f6re verilecek.<\/p>\n<p class=\"fr-tag\">M\u00fchendislik et\u00fctlerinin ba\u015flang\u0131c\u0131, NGS projesinin emniyetini, g\u00fcvenilirli\u011fini ve ekonomik verimlili\u011fini belirleyen temel bir a\u015fama. Bu a\u015famada, sahan\u0131n jeolojik, sismik, hidrolojik ve \u00e7evresel \u00f6zellikleri konusunda kapsaml\u0131 bir \u00e7al\u0131\u015fma yap\u0131lacak. Et\u00fctler, projenin hem uluslararas\u0131 hem de ulusal standartlara uygun olmas\u0131n\u0131, \u00e7evresel ve teknolojik risklerin en aza indirilmesini ve gelecekte n\u00fckleer g\u00fc\u00e7 santralinin verimli tasar\u0131m\u0131 i\u00e7in bir temel olu\u015fturmas\u0131n\u0131 sa\u011flayacak.<\/p>\n<p class=\"fr-tag\"><strong>Rosatom Genel M\u00fcd\u00fcr\u00fc Aleksey Likhachev<\/strong> konuyla ilgili a\u00e7\u0131klamas\u0131nda, <em>\u201c\u00dclken&#8217;de m\u00fchendislik ara\u015ft\u0131rmalar\u0131n\u0131n ba\u015flat\u0131lmas\u0131, Kazakistan&#8217;\u0131n modern tarihindeki ilk y\u00fcksek kapasiteli n\u00fckleer g\u00fc\u00e7 santraline giden yolculu\u011fun ba\u015flang\u0131c\u0131n\u0131 i\u015faret ediyor. Bu a\u015famada, gelecekteki bir n\u00fckleer g\u00fc\u00e7 santraline uygunlu\u011fundan tam olarak emin olmak i\u00e7in sahan\u0131n kapsaml\u0131 olarak incelemesine odaklan\u0131yoruz. Rosatom, Kazakistan&#8217;\u0131n geli\u015fimi i\u00e7in stratejik \u00f6neme sahip bu projeyi hayata ge\u00e7irmek i\u00e7in edindi\u011fi t\u00fcm deneyimini kullanmaya haz\u0131r\u201d<\/em> dedi.<\/p>\n<p class=\"fr-tag\"><strong>Kazakistan Cumhuriyeti Atom Enerjisi Ajans\u0131 Ba\u015fkan\u0131 Almasadam Satkaliyev<\/strong> de,<em> \u201cBug\u00fcn at\u0131lan ad\u0131m sadece bir ilk, ancak Kazakistan&#8217;\u0131n ulusal ekonomisinde yeni bir y\u00fcksek teknoloji sekt\u00f6r\u00fc kurma yolundaki kararl\u0131l\u0131\u011f\u0131n\u0131 g\u00f6steriyor. Bu n\u00fckleer g\u00fc\u00e7 santralinin, modern altyap\u0131n\u0131n olu\u015fturulmas\u0131ndan yeni okullara, anaokullar\u0131na ve sosyal tesislere kadar b\u00f6lgenin kalk\u0131nmas\u0131na g\u00fc\u00e7l\u00fc bir destek verece\u011finden eminiz. Bu proje, Kazakistan&#8217;\u0131n stratejik tercihi ve uzun vadeli b\u00f6lgesel ve ulusal ekonomik b\u00fcy\u00fcmenin itici g\u00fcc\u00fcd\u00fcr\u201d<\/em> diye konu\u015ftu.<\/p>\n<p class=\"fr-tag\">T\u00f6rende ayr\u0131ca, VVER-1200 \u00fcnitelerinin halihaz\u0131rda faaliyette oldu\u011fu veya in\u015fa edildi\u011fi Leningrad NGS, Akkuyu NGS, Belarus NGS, Macaristan\u2019daki Paks-2 NGS ve Banglade\u015f\u2019teki Ruppur NGS \u00e7al\u0131\u015fanlar\u0131, \u00dclken k\u00f6y\u00fc sakinlerine hitap ederek, projenin ba\u015far\u0131l\u0131 olmas\u0131n\u0131 diledi ve n\u00fckleer enerjinin b\u00f6lgenin sosyo-ekonomik kalk\u0131nmas\u0131 i\u00e7in \u00f6nemini vurgulad\u0131lar.<\/p>\n<p class=\"fr-tag\">Kazakistan\u2019da yap\u0131lacak NGS, 1200 MW elektrik kapasiteli bas\u0131n\u00e7l\u0131 su reakt\u00f6rleri olan 3 + nesil modern VVER-1200 reakt\u00f6rlerine sahip olacak. Bu teknoloji, en s\u0131k\u0131 uluslararas\u0131 g\u00fcvenlik standartlar\u0131n\u0131 kar\u015f\u0131lamakta olup, halihaz\u0131rda Rusya, Belarus, T\u00fcrkiye, Banglade\u015f, M\u0131s\u0131r ve \u00c7in&#8217;de faaliyetteki ve in\u015fa halindeki tesislerde ba\u015far\u0131yla kullan\u0131l\u0131yor. Hizmet \u00f6mr\u00fc 60 y\u0131l olan reakt\u00f6r\u00fcn hizmet \u00f6mr\u00fc potansiyel olarak 20 y\u0131l daha uzat\u0131labilir.<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Kazakistan&#8217;\u0131n Almat\u0131 b\u00f6lgesinde bulunan Jamb\u0131l il\u00e7esinin \u00dclken k\u00f6y\u00fcnde yap\u0131lmas\u0131 planlanan n\u00fckleer g\u00fc\u00e7 santrali (NGS) in\u015faat projesinin ilk \u00e7al\u0131\u015fmalar\u0131 ba\u015flad\u0131. Bu \u00e7al\u0131\u015fmalar, gelecekteki [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":199443,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[2777,116984],"views":12,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/199442"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=199442"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/199442\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/199443"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=199442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=199442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=199442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}