{"id":199307,"date":"2025-08-07T17:56:29","date_gmt":"2025-08-07T14:56:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=199307"},"modified":"2025-08-07T17:56:29","modified_gmt":"2025-08-07T14:56:29","slug":"opet-elektrik-tuketimini-gunesten-karsilayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/opet-elektrik-tuketimini-gunesten-karsilayacak\/","title":{"rendered":"(Turkish) &#8217;OPET&#8217; Elektrik T\u00fcketimini \u201cG\u00fcne\u015f&#8221;ten Kar\u015f\u0131layacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/199307\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Enerji sekt\u00f6r\u00fcnde d\u00f6n\u00fc\u015f\u00fcm\u00fcn \u00f6nc\u00fcs\u00fc olma vizyonu ile faaliyetlerini s\u00fcrd\u00fcren OPET, elektrik t\u00fcketimini yenilenebilir enerjiden kar\u015f\u0131layacak ad\u0131mlar\u0131 ile sekt\u00f6rde bir ilke daha imza att\u0131. Ko\u00e7 Holding Selfie Projesi kapsam\u0131nda Manisa\u2019n\u0131n Demirci \u0130l\u00e7esinde kurulumu tamamlanan\u00a0<strong><em>Mahmutlar G\u00fcne\u015f Enerji Santrali\u2019<\/em><\/strong>ni(GES) ge\u00e7ti\u011fimiz g\u00fcnlerde devreye alan OPET, \u0130stanbul\u2019daki Genel M\u00fcd\u00fcrl\u00fck binas\u0131 ile K\u00f6rfez ve Giresun Terminalleri\u2019nin t\u00fcm elektrik t\u00fcketimlerini g\u00fcne\u015f enerjisinden sa\u011flayacak. Y\u0131ll\u0131k elektrik \u00fcretimi 5 bin MWh\u2019yi bulacak olan Mahmutlar GES ile 1.500 hanenin elektrik t\u00fcketimine e\u015fde\u011fer bir \u00fcretim ger\u00e7ekle\u015ftirilirken, \u00e7evresel a\u00e7\u0131dan da \u00f6nemli kazan\u0131mlar s\u00f6z konusu olacak. Mahmutlar GES projesiyle elektrik ihtiyac\u0131n\u0131 \u00e7evre dostu yenilenebilir enerji kaynaklar\u0131ndan sa\u011flayan OPET, y\u0131ll\u0131k 3.000 ton karbon emisyonunun \u00f6n\u00fcne ge\u00e7erek \u00e7evre dostu bir \u00e7\u00f6z\u00fcm sunarken, 145 bin a\u011fac\u0131 da do\u011faya kazand\u0131racak.<\/h2>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-199308 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/1754559503_OPET_GES_.jpg\" alt=\"\" width=\"550\" height=\"330\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/1754559503_OPET_GES_.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/1754559503_OPET_GES_-300x180.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/1754559503_OPET_GES_-500x300.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/1754559503_OPET_GES_-80x48.jpg 80w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<h3><strong>SEKT\u00d6R \u0130\u00c7\u0130N D\u00d6N\u00dc\u015eT\u00dcR\u00dcC\u00dc B\u0130R ADIM<\/strong><\/h3>\n<p>Bu yat\u0131r\u0131m\u0131n sadece elektrik \u00fcretimi a\u00e7\u0131s\u0131ndan de\u011fil \u00e7evresel sorumluluk anlam\u0131nda da sekt\u00f6r i\u00e7in d\u00f6n\u00fc\u015ft\u00fcr\u00fcc\u00fc bir ad\u0131m oldu\u011funu ifade eden\u00a0<strong>OPET Genel M\u00fcd\u00fcr\u00fc \u00d6zg\u00fcr Kahramanzade<\/strong>,\u00a0<em>\u201cMahmutlar GES, OPET\u2019in s\u00fcrd\u00fcr\u00fclebilirli\u011fe olan ba\u011fl\u0131l\u0131\u011f\u0131n\u0131n \u00e7ok somut bir yans\u0131mas\u0131. Yat\u0131r\u0131m kararlar\u0131m\u0131z\u0131 al\u0131rken yaln\u0131zca ekonomik de\u011fil, toplumsal ve \u00e7evresel etkileri de g\u00f6z \u00f6n\u00fcnde bulundurmaya b\u00fcy\u00fck \u00f6nem veriyoruz. Bug\u00fcn geldi\u011fimiz noktada, elektrik ihtiyac\u0131m\u0131z\u0131 do\u011frudan g\u00fcne\u015ften kar\u015f\u0131layan, fazlas\u0131n\u0131 da \u015febekeye aktaran bir yap\u0131 kurduk. Akaryak\u0131t sekt\u00f6r\u00fcnde bu \u00f6l\u00e7ekte bir GES yat\u0131r\u0131m\u0131yla elektrik t\u00fcketimini kendi \u00fcretimiyle kar\u015f\u0131layan ilk \u00f6rneklerden biri olman\u0131n gururunu ya\u015f\u0131yoruz. G\u00fcn\u00fcm\u00fczde enerji sekt\u00f6r\u00fc b\u00fcy\u00fck bir d\u00f6n\u00fc\u015f\u00fcm i\u00e7inde. OPET olarak biz bu d\u00f6n\u00fc\u015f\u00fcm\u00fcn sadece izleyicisi de\u011fil, aktif bir oyuncusu olarak yol al\u0131yor, projeler geli\u015ftiriyoruz. Yenilenebilir enerji yat\u0131r\u0131mlar\u0131m\u0131z bunun bir g\u00f6stergesi. \u00d6n\u00fcm\u00fczdeki d\u00f6nemde \u00e7evreye duyarl\u0131, verimli ve teknoloji odakl\u0131 yeni projelerle s\u00fcrd\u00fcr\u00fclebilir enerji alan\u0131ndaki varl\u0131\u011f\u0131m\u0131z\u0131 g\u00fc\u00e7lendirmeye devam edece\u011fiz\u201d<\/em> de\u011ferlendirmesinde bulundu.<\/p>\n<h3><strong>ULUSAL \u015eEBEKEYE YE\u015e\u0130L ENERJ\u0130 \u0130LE KATKI SUNACAK<\/strong><\/h3>\n<p>Toplam 2,76 MW\u2019e kurulu g\u00fcce sahip olan, OPET\u2019in K\u00f6rfez ve Giresun terminalleri ile Genel M\u00fcd\u00fcrl\u00fck binas\u0131n\u0131n t\u00fcm elektrik t\u00fcketimini kar\u015f\u0131layacak \u015fekilde tasarlanan Mahmutlar GES, ihtiya\u00e7tan fazla olan \u00fcretimini ulusal \u015febekeye vererek, T\u00fcrkiye\u2019nin ye\u015fil enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcne de katk\u0131 sunacak. Projeyi payda\u015flar\u0131 Entek Elektrik, Solareg, Solares Enerji A.\u015e., saha uygulama s\u00fcre\u00e7lerini ise ASC Enerji ile y\u00fcr\u00fcten OPET; projenin geli\u015ftirme s\u00fcrecinde tesislerinin t\u00fcketim profillerinin dikkate al\u0131narak uygun arazi se\u00e7imine b\u00fcy\u00fck \u00f6zen g\u00f6sterdi.<\/p>\n<h3><strong>MARMARA VE MERS\u0130N TERM\u0130NALLER\u0130N\u0130N ELEKTR\u0130\u011e\u0130 OZANCA GES\u2019TEN GELECEK<\/strong><\/h3>\n<p>Mahmutlar GES\u2019in ard\u0131ndan yine Manisa\u2019da G\u00f6lmarmara \u0130l\u00e7esi\u2019nde\u00a0Ko\u00e7 Holding Selfie Projesi kapsam\u0131nda Ozanlar GES yat\u0131r\u0131m\u0131 da s\u00fcr\u00fcyor. Kurulu g\u00fcc\u00fc 5,7 MW\u2019e olacak olan Ozanca GES, OPET\u2019in Marmara ve Mersin terminallerinin elektrik ihtiyac\u0131 dikkate al\u0131narak geli\u015ftirildi. Panel montaj \u00e7al\u0131\u015fmalar\u0131 devam eden projenin 2025 y\u0131l\u0131n\u0131n son \u00e7eyre\u011fine kadar yeti\u015ftirilerek devreye al\u0131nmas\u0131 planl\u0131yor.<\/p>\n<p>S\u00fcrd\u00fcr\u00fclebilirlik vizyonu do\u011frultusunda karbon emisyonlar\u0131n\u0131 azaltmaya y\u00f6nelik kapsaml\u0131 stratejiler geli\u015ftiren OPET, T\u00fcrkiye\u2019nin \u201c2053 Net S\u0131f\u0131r Emisyon\u201d hedefinin yan\u0131 s\u0131ra, Ko\u00e7 Holding\u2019in \u20182050 Karbon N\u00f6tr\u2019 hedefiyle de uyumlu \u015fekilde \u00e7al\u0131\u015fmalar y\u00fcr\u00fct\u00fcyor. \u0130ki b\u00fcy\u00fck GES yat\u0131r\u0131m\u0131n\u0131n yan\u0131 s\u0131ra \u2018Ak\u0131ll\u0131 \u0130stasyonlar\u0131\u2019nda \u00e7evre dostu uygulamalar\u0131 te\u015fvik eden, enerji tasarrufu sa\u011flayan \u00e7\u00f6z\u00fcmler sunan \u015firket, istasyonlar\u0131n\u0131n elektrik enerjisi ihtiyac\u0131n\u0131n tamam\u0131n\u0131 kanopi \u00fczerine kurulu GES ile kar\u015f\u0131layan projeleri ile de \u00f6ne \u00e7\u0131k\u0131yor.<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji sekt\u00f6r\u00fcnde d\u00f6n\u00fc\u015f\u00fcm\u00fcn \u00f6nc\u00fcs\u00fc olma vizyonu ile faaliyetlerini s\u00fcrd\u00fcren OPET, elektrik t\u00fcketimini yenilenebilir enerjiden kar\u015f\u0131layacak ad\u0131mlar\u0131 ile sekt\u00f6rde bir ilke daha imza [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":199308,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,44],"tags":[1609,4479],"views":22,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/199307"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=199307"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/199307\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/199308"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=199307"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=199307"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=199307"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}