{"id":199156,"date":"2025-08-02T15:32:51","date_gmt":"2025-08-02T12:32:51","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=199156"},"modified":"2025-08-02T16:54:58","modified_gmt":"2025-08-02T13:54:58","slug":"aksa-enerjiden-gabona-145-mwlik-yeni-enerji-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerjiden-gabona-145-mwlik-yeni-enerji-yatirimi\/","title":{"rendered":"(Turkish) Aksa Enerji\u2019den Gabon\u2019a 145 MW\u2019l\u0131k Yeni Enerji Yat\u0131r\u0131m\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/199156\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>T\u00fcrkiye\u2019nin en b\u00fcy\u00fck halka a\u00e7\u0131k serbest elektrik \u00fcreticisi Aksa Enerji<\/strong><strong>, Gabon\u2019da toplam 145 MW kurulu g\u00fc\u00e7te Do\u011falgazl\u0131 Elektrik Santrali yat\u0131r\u0131m\u0131na imza at\u0131yor. Ba\u015fkent Libreville ve Port Gentil \u015fehrinde devreye al\u0131nacak santraller, \u00fclkenin enerji arz g\u00fcvenli\u011fine ve ekonomik kalk\u0131nmas\u0131na uzun vadeli katk\u0131 sunmay\u0131 hedefliyor.\u00a0<\/strong><\/h2>\n<p><img loading=\"lazy\" class=\"size-full wp-image-199185 aligncenter\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/640x360.jpg\" alt=\"\" width=\"550\" height=\"309\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/640x360.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/640x360-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/640x360-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/640x360-80x45.jpg 80w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>7 \u00fclkedeki 11 santraliyle 3.000 MW\u2019tan fazla kurulu g\u00fcce sahip T\u00fcrkiye\u2019nin en b\u00fcy\u00fck halka a\u00e7\u0131k serbest elektrik \u00fcreticisi Aksa Enerji, Afrika\u2019daki yat\u0131r\u0131mlar\u0131na h\u0131z kesmeden devam ediyor. Aksa Enerji, Gabon\u2019un ba\u015fkenti\u00a0Libreville ve \u00fclkenin ekonomi merkezi Port Gentil\u2019de b\u00f6lgenin acil elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamak amac\u0131yla kurulacak do\u011falgazl\u0131 elektrik santrallerinin uzun vadeli kiralanmas\u0131 ve i\u015fletilmesi i\u00e7in imza s\u00fcrecini tamamlad\u0131.<\/p>\n<p>Aksa Enerji,\u00a0Gabon Cumhuriyeti Elektrik Kurumu\u00a0(Soci\u00e9t\u00e9 d&#8217;Energie et d&#8217;Eau du Gabon \u201cSEEG\u201d)\u00a0ile imzalad\u0131\u011f\u0131 anla\u015fma kapsam\u0131nda yerli do\u011fal gaz kaynaklar\u0131n\u0131 kullanarak \u00fcretim yapacak ve 10 y\u0131l s\u00fcreyle elektrik tedariki sa\u011flayacak.<\/p>\n<p>Gabon\u2019un enerji arz g\u00fcvenli\u011fine uzun vadede katk\u0131 sunacak olan santraller 2026 y\u0131l\u0131n\u0131n ilk \u00e7eyre\u011finde devreye al\u0131nacak, yerel do\u011fal gaz kaynaklar\u0131n\u0131 kullanarak \u00fcretim ger\u00e7ekle\u015ftirecek.<\/p>\n<div id=\"attachment_199157\" style=\"width: 560px\" class=\"wp-caption aligncenter\"><img aria-describedby=\"caption-attachment-199157\" loading=\"lazy\" class=\"wp-image-199157 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/1754031875_Cemil_Kazanc__123333333333335.jpg\" alt=\"\" width=\"550\" height=\"433\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/1754031875_Cemil_Kazanc__123333333333335.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/1754031875_Cemil_Kazanc__123333333333335-300x236.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/1754031875_Cemil_Kazanc__123333333333335-500x394.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/08\/1754031875_Cemil_Kazanc__123333333333335-64x50.jpg 64w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><p id=\"caption-attachment-199157\" class=\"wp-caption-text\">Aksa Enerji Y\u00f6netim Kurulu Ba\u015fkan\u0131 ve CEO\u2019su Cemil Kazanc\u0131<\/p><\/div>\n<p><strong>Aksa Enerji Y\u00f6netim Kurulu Ba\u015fkan\u0131 ve CEO\u2019su Cemil Kazanc\u0131,<\/strong>\u00a0yat\u0131r\u0131ma ili\u015fkin \u015funlar\u0131 s\u00f6yledi: <em>\u201cAksa Enerji olarak bir yandan \u00fc\u00e7 ayr\u0131 \u00fclkede devam eden yat\u0131r\u0131mlar\u0131m\u0131z\u0131 tamamlamak i\u00e7in yo\u011fun bir \u00e7aba g\u00f6sterirken; di\u011fer yandan yeni yat\u0131r\u0131m hamlelerine de cesaretle imza at\u0131yoruz. Bu kapsamda, bug\u00fcne kadar h\u0131zl\u0131 ve verimli bir \u015fekilde tamamlad\u0131\u011f\u0131m\u0131z elektrik santralleri yat\u0131r\u0131mlar\u0131m\u0131zla ve g\u00fcvenilir i\u015f orta\u011f\u0131 olarak yat\u0131r\u0131m yapt\u0131\u011f\u0131m\u0131z \u00fclkelerde ortaya koydu\u011fumuz i\u015fletmecilikle Aksa Enerji, Afrika k\u0131tas\u0131nda enerji arz g\u00fcvenli\u011fini kal\u0131c\u0131 olarak sa\u011flamak isteyen \u00fclkeler i\u00e7in aranan bir global \u015firkete d\u00f6n\u00fc\u015fm\u00fc\u015f durumdad\u0131r. Bu \u00e7er\u00e7evede, Gabon Devleti\u2019nin enerji arz\u0131 ihtiyac\u0131na \u00f6nemli bir katk\u0131 sa\u011flayacak projede, Aksa Enerji g\u00fcvenli bir i\u015f orta\u011f\u0131 olarak se\u00e7ilmi\u015f oldu. Gabon\u2019da hayata ge\u00e7irece\u011fimiz santral projemizle yaln\u0131zca elektrik \u00fcretmeyecek; ayn\u0131 zamanda b\u00f6lgenin acil enerji ihtiya\u00e7lar\u0131na da s\u00fcrd\u00fcrebilir \u00e7\u00f6z\u00fcmler sunaca\u011f\u0131z. Bu yat\u0131r\u0131m, Afrika\u2019daki s\u00fcrd\u00fcrebilir y\u00fcksek b\u00fcy\u00fcme hedefi do\u011frultusunda devam eden kararl\u0131l\u0131\u011f\u0131m\u0131z\u0131n bir g\u00f6stergesidir. Afrika\u2019n\u0131n enerji gelece\u011fini daha s\u00fcrd\u00fcr\u00fclebilir, eri\u015filebilir ve g\u00fcvenli hale getirmek i\u00e7in kararl\u0131l\u0131kla \u00e7al\u0131\u015fmaya devam edece\u011fiz\u201d<\/em> dedi.<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin en b\u00fcy\u00fck halka a\u00e7\u0131k serbest elektrik \u00fcreticisi Aksa Enerji, Gabon\u2019da toplam 145 MW kurulu g\u00fc\u00e7te Do\u011falgazl\u0131 Elektrik Santrali yat\u0131r\u0131m\u0131na imza at\u0131yor. [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":199185,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53],"tags":[1571,846],"views":10,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/199156"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=199156"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/199156\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/199185"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=199156"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=199156"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=199156"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}