{"id":19895,"date":"2013-12-25T11:36:28","date_gmt":"2013-12-25T08:36:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=19895"},"modified":"2013-12-25T11:36:28","modified_gmt":"2013-12-25T08:36:28","slug":"alstom-brezilyaya-eco-122-ruzgar-turbini-tedarik-edecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/alstom-brezilyaya-eco-122-ruzgar-turbini-tedarik-edecek\/","title":{"rendered":"(Turkish) Alstom, Brezilya\u2019ya ECO 122 R\u00fczgar T\u00fcrbini Tedarik Edecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/19895\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Alstom, Brezilya\u2019daki iki b\u00fcy\u00fck r\u00fczgar \u00e7iftli\u011fine ECO 122 r\u00fczgar t\u00fcrbini teslim etmek, kurulumunu yapmak ve i\u015fletmeye almak \u00fczere QueirozGalv\u00e3ogrubu ile yakla\u015f\u0131k 400 milyon Euro toplam tutar\u0131nda iki s\u00f6zle\u015fme imzalad\u0131.<\/strong><\/p>\n<p>Alstom, Brezilya\u2019n\u0131n Piau\u00edState eyaletinde bulunan iki b\u00fcy\u00fck r\u00fczgar \u00e7iftli\u011fi Caldeir\u00e3oGrande I ve II\u2019de ECO 122 r\u00fczgar t\u00fcrbinlerini teslim etmek, kurulumunu yapmak ve i\u015fletmeye almak \u00fczere, Brezilya\u2019n\u0131n ana altyap\u0131 gruplar\u0131ndan biri olan QueirozGalv\u00e3o ile yakla\u015f\u0131k 400 milyon Eu<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/alstom-brezilyaya-eco-122-ruzgar-turbini-tedarik-edecek.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-19896\" title=\"alstom-brezilyaya-eco-122-ruzgar-turbini-tedarik-edecek\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/alstom-brezilyaya-eco-122-ruzgar-turbini-tedarik-edecek-300x215.jpg\" alt=\"\" width=\"300\" height=\"215\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/alstom-brezilyaya-eco-122-ruzgar-turbini-tedarik-edecek-300x215.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/alstom-brezilyaya-eco-122-ruzgar-turbini-tedarik-edecek-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/alstom-brezilyaya-eco-122-ruzgar-turbini-tedarik-edecek.jpg 415w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ro toplam tutar\u0131nda iki s\u00f6zle\u015fme imzalad\u0131.<\/p>\n<p><strong>600.000 K\u0130\u015e\u0130YE ELEKTR\u0130K SA\u011eLANAB\u0130LECEK<\/strong><br \/>\n400 MW kurulu g\u00fcc\u00fcnde olacak Caldeir\u00e3oGrande I ve II r\u00fczgar santrallerinde yakla\u015f\u0131k 600.000 ki\u015fiye elektrik sa\u011flanabilecek. Alstom\u2019un Cama\u00e7ari\u2019deki fabrikas\u0131nda \u00fcretilecek ECO 122 r\u00fczgar t\u00fcrbinleri 2015 ve 2017 y\u0131llar\u0131 aras\u0131nda teslim edilecek.<\/p>\n<p><strong>ECO 122 30 YILIN \u00dcZER\u0130NDEK\u0130 DENEY\u0130M\u0130N B\u0130R SONUCU<\/strong><br \/>\n2-3MW t\u00fcrbin segmentinde en b\u00fcy\u00fck kanat uzunluklar\u0131ndan birine sahip olan Alstom\u2019un ECO 122 r\u00fczgar t\u00fcrbini, d\u00fc\u015f\u00fck ve orta r\u00fczgarl\u0131 b\u00f6lgelerde enerji verimini art\u0131rmak amac\u0131yla y\u00fcksek g\u00fc\u00e7 ve y\u00fcksek kapasitenin e\u015fsiz bir kombinasyonunu sunuyor. ECO 122, Alstom\u2019un kendini kan\u0131tlam\u0131\u015f ECO 100 platformunun en son geli\u015fiminin ve r\u00fczgar t\u00fcrbini tasar\u0131m\u0131nda 30 y\u0131l\u0131n \u00fczerindeki deneyimin bir sonucu.<\/p>\n<p>Brezilya\u2019da 1.700 MW\u2019nin \u00fczerinde r\u00fczgar g\u00fcc\u00fc sa\u011flayacak s\u00f6zle\u015fmeler imzalayan Alstom, \u00fclkenin r\u00fczgar enerjisinde Pazar liderlerinden biri durumunda bulunuyor.Alstom d\u00fcnya genelindeki 150\u2019den fazla r\u00fczgar santralinde faaliyette olan veya kurulumu devam eden 2.500\u2019den fazla r\u00fczgar t\u00fcrbini arac\u0131l\u0131\u011f\u0131 ile 3.800 MW\u2019nin \u00fczerinde g\u00fc\u00e7 sa\u011fl\u0131yor.<\/p>\n<p>Yay\u0131nc\u0131: <a href=\"https:\/\/www.enerjigazetesi.ist\" target=\"_blank\">Enerji Gazetesi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Alstom, Brezilya\u2019daki iki b\u00fcy\u00fck r\u00fczgar \u00e7iftli\u011fine ECO 122 r\u00fczgar t\u00fcrbini teslim etmek, kurulumunu yapmak ve i\u015fletmeye almak \u00fczere QueirozGalv\u00e3ogrubu ile yakla\u015f\u0131k 400 milyon [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":19896,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[9503,1927,11578,11575,6369,19,63,67,1009,165,11576,474,69,2511,16,231,11579,324,11577],"views":948,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19895"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=19895"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19895\/revisions"}],"predecessor-version":[{"id":19898,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19895\/revisions\/19898"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/19896"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=19895"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=19895"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=19895"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}