{"id":198740,"date":"2025-07-23T15:21:58","date_gmt":"2025-07-23T12:21:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=198740"},"modified":"2025-07-23T15:22:21","modified_gmt":"2025-07-23T12:22:21","slug":"agrotechten-italyada-tarim-ve-gunesi-birlestiren-yatirim","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/agrotechten-italyada-tarim-ve-gunesi-birlestiren-yatirim\/","title":{"rendered":"(Turkish) Agrotech&#8217;ten \u0130talya\u2019da Tar\u0131m ve G\u00fcne\u015fi Birle\u015ftiren Yat\u0131r\u0131m"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/198740\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Agrotech Y\u00fcksek Teknoloji, Ferrara b\u00f6lgesinde 12 MWp kapasiteli Agro-PV modelinde g\u00fcne\u015f enerjisi santrali kuracak. Projenin yat\u0131r\u0131m bedeli yakla\u015f\u0131k 11,5 milyon euro.<\/strong><\/h2>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-198741 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/gu\u0308nes\u0327-enerjisi-tarim-elektrik-1200x1200-1.jpg\" alt=\"\" width=\"550\" height=\"420\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/gu\u0308nes\u0327-enerjisi-tarim-elektrik-1200x1200-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/gu\u0308nes\u0327-enerjisi-tarim-elektrik-1200x1200-1-300x229.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/gu\u0308nes\u0327-enerjisi-tarim-elektrik-1200x1200-1-500x382.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/gu\u0308nes\u0327-enerjisi-tarim-elektrik-1200x1200-1-65x50.jpg 65w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/gu\u0308nes\u0327-enerjisi-tarim-elektrik-1200x1200-1-260x200.jpg 260w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>Agrotech Y\u00fcksek Teknoloji ve Yat\u0131r\u0131m A.\u015e. (AGROT), yenilenebilir enerji alan\u0131ndaki uluslararas\u0131 b\u00fcy\u00fcme stratejileri do\u011frultusunda \u0130talya\u2019n\u0131n Ferrara b\u00f6lgesinde Agro-PV (Tar\u0131m + Fotovoltaik) modeliyle \u00e7al\u0131\u015facak 12 MWp g\u00fcc\u00fcnde bir g\u00fcne\u015f enerjisi santrali kurma karar\u0131 ald\u0131\u011f\u0131n\u0131 duyurdu. Yakla\u015f\u0131k 192 d\u00f6n\u00fcm arazi \u00fczerinde kurulacak tesis, hem tar\u0131msal \u00fcretimi hem de enerji \u00fcretimini birlikte s\u00fcrd\u00fcrebilecek \u015fekilde tasarland\u0131.<br \/>\nY\u0131ll\u0131k yakla\u015f\u0131k 21.336 MWh elektrik \u00fcretimi hedeflenen projede g\u00fcne\u015f takip sistemi kullan\u0131lacak. Toplam yat\u0131r\u0131m tutar\u0131 yakla\u015f\u0131k 11,5 milyon euro olarak belirlenen santralin 18 ay i\u00e7inde tamamlanmas\u0131 planlan\u0131yor.<\/p>\n<h3><strong>\u015eirketin KAP\u2019a g\u00f6nderdi\u011fi a\u00e7\u0131klama \u015fu \u015fekildedir:<\/strong><\/h3>\n<p>Konu: \u0130talya\u2019da Agro-PV (G\u00fcne\u015f Enerjisi+Tar\u0131msal \u00dcretim) Yat\u0131r\u0131m\u0131<\/p>\n<p>\u015eirketimizin 22 Temmuz 2025 tarihli y\u00f6netim kurulu toplant\u0131s\u0131nda, yenilenebilir enerji yat\u0131r\u0131mlar\u0131 kapsam\u0131nda, \u0130talya\u2019n\u0131n Ferrara b\u00f6lgesinde sat\u0131n al\u0131m\u0131 yap\u0131lacak olan 192 d\u00f6n\u00fcml\u00fck bir arazi \u00fczerinde 12 MWp kurulu g\u00fcce sahip olacak G\u00fcne\u015f Enerjisi Santrali (GES) kurulmas\u0131na y\u00f6nelik yat\u0131r\u0131m karar\u0131 al\u0131nm\u0131\u015ft\u0131r.<\/p>\n<p>Yap\u0131lacak yat\u0131r\u0131m t\u00fcr\u00fc Agro-PV (Tar\u0131m + Fotovoltaik) model olacak, bu yat\u0131r\u0131m modeli sayesinde, enerji \u00fcretimi ile tar\u0131msal faaliyetler bir arada s\u00fcrd\u00fcr\u00fclerek, \u00e7evresel s\u00fcrd\u00fcr\u00fclebilirlik, arazi verimlili\u011fi ve enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcne katk\u0131 e\u015f zamanl\u0131 olarak sa\u011flanacakt\u0131r. Planlanan sistemde, g\u00fcne\u015f panelleri yerden minimum 2.1 metre y\u00fckseklikte konumland\u0131r\u0131lacak olup, bu sayede hem tar\u0131msal \u00fcretim hem de bak\u0131m faaliyetleri sorunsuz \u015fekilde y\u00fcr\u00fct\u00fclebilecektir. Ayr\u0131ca, sistem g\u00fcne\u015f takip mekanizmas\u0131 (sun-tracking) ile donat\u0131lacak, b\u00f6ylece enerji verimlili\u011fi maksimize edilecektir.<\/p>\n<p>Yat\u0131r\u0131ma ili\u015fkin \u00f6ne \u00e7\u0131kan bilgiler a\u015fa\u011f\u0131da yer almaktad\u0131r:<\/p>\n<p>&#8211; Proje Lokasyonu: Ferrara, Emilia-Romagna \/ \u0130talya<\/p>\n<p>&#8211; Proje Tipi: Tar\u0131msal faaliyetle entegre (Agro-PV), g\u00fcne\u015f takip sistemli ( Sun-Tracking)<\/p>\n<p>&#8211; Kurulu G\u00fc\u00e7: 12 MWp<\/p>\n<p>&#8211; Y\u0131ll\u0131k Elektrik \u00dcretimi: Yakla\u015f\u0131k 21.336 MWh<\/p>\n<p>&#8211; Toplam Yat\u0131r\u0131m Tutar\u0131: Yakla\u015f\u0131k 11.500.000 EUR<\/p>\n<p>&#8211; Projenin Tamamlanma S\u00fcresi : 18 Ay<\/p>\n<p>Bu yat\u0131r\u0131m, \u015firketimizin uluslararas\u0131 b\u00fcy\u00fcme stratejileri kapsam\u0131nda Avrupa\u2019daki ilk Agro-PV uygulamalar\u0131ndan biri olup, hem s\u00fcrd\u00fcr\u00fclebilir enerji \u00fcretimine hem de tar\u0131m arazilerinin etkin kullan\u0131m\u0131na katk\u0131 sa\u011flayacakt\u0131r.<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Agrotech Y\u00fcksek Teknoloji, Ferrara b\u00f6lgesinde 12 MWp kapasiteli Agro-PV modelinde g\u00fcne\u015f enerjisi santrali kuracak. Projenin yat\u0131r\u0131m bedeli yakla\u015f\u0131k 11,5 milyon euro. Agrotech [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":198741,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[116938,7853],"views":24,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/198740"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=198740"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/198740\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/198741"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=198740"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=198740"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=198740"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}