{"id":19861,"date":"2013-12-24T17:00:46","date_gmt":"2013-12-24T14:00:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=19861"},"modified":"2013-12-24T17:00:53","modified_gmt":"2013-12-24T14:00:53","slug":"tay-enerjiden-artvine-hes-projesi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tay-enerjiden-artvine-hes-projesi\/","title":{"rendered":"(Turkish) Tay Enerji\u2019den Artvin\u2019e HES Projesi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/19861\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Tay Enerji \u0130n\u015f. San. ve Tic. A.\u015e. taraf\u0131ndan Artvin \u0130li, Yusufeli \u0130l\u00e7esi, \u00d6zg\u00fcven K\u00f6y\u00fc, \u00d6zg\u00fcven Deresi \u00fczerinde &#8220; \u00d6zg\u00fcven Reg\u00fclat\u00f6r\u00fc ve HES\u2019in (14,270 MWm\/13,845 MWe)&#8220; kurulmas\u0131 ve i\u015fletilmesi planlan\u0131yor.<\/strong><\/p>\n<p>Proje i\u00e7in \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) ba\u015fvurusunu yapan firman\u0131n projesi i\u00e7in 24 Ocak 2014\u2019de halk\u0131n kat\u0131l\u0131m\u0131 toplant\u0131s\u0131 yap\u0131lacak. Gerekli izinlerin al\u0131nmas\u0131 ard\u0131ndan, EPDK\u2019dan da lisans\u0131n\u0131n al\u0131nmas\u0131 bekleniyor.<\/p>\n<p><strong>PROJE\u2019N\u0130N MAL\u0130YET\u0130 32 M\u0130LYON<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/tay-enerjiden-artvine-hes-projesi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-19862\" title=\"tay-enerjiden-artvine-hes-projesi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/tay-enerjiden-artvine-hes-projesi-300x215.jpg\" alt=\"\" width=\"300\" height=\"215\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/tay-enerjiden-artvine-hes-projesi-300x215.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/tay-enerjiden-artvine-hes-projesi-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/tay-enerjiden-artvine-hes-projesi.jpg 431w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> TL<\/strong><\/p>\n<p>Proje\u2019nin yat\u0131r\u0131m maliyeti 32 milyon TL olacak.<\/p>\n<p>Proje ile \u00d6zg\u00fcven Deresi \u00fczerinde \u00d6zg\u00fcven 1 HES ve \u00d6zg\u00fcven 2 HES olmak \u00fczere, 2.100 m ile 1.306 m kuyruksuyu kotlar\u0131 aras\u0131 de\u011ferlendirilerek enerji \u00fcretimi sa\u011flanm\u0131\u015f olacak. Proje debisi; \u00d6zg\u00fcven\u20101 HES i\u00e7in 1,90 m3\/s, net d\u00fc\u015f\u00fc 466,415 m,\u00d6zg\u00fcven\u20102 HES i\u00e7in 2,50 m3\/s, net d\u00fc\u015f\u00fc ise 277,836 m olacak.<\/p>\n<p>\u00d6zg\u00fcven Deresi \u00fczerinde yakla\u015f\u0131k 2.080 m talveg kotunda yer alan \u00d6zg\u00fcven-1 Reg\u00fclat\u00f6r\u00fcn\u00fcn kret kotu 2.100 m. \u00d6zg\u00fcven-1 Reg\u00fclat\u00f6r\u00fcn\u00fcn arkas\u0131nda g\u00f6l alan\u0131 olu\u015facak. Su alma a\u011fz\u0131ndan al\u0131nan su, \u00f6nce \u00c7\u00f6keltim Havuzu-1\u2019e, daha sonra sol sahilde in\u015fa edilecek olan \u0130letim Kanal\u0131-1 ile Y\u00fckleme Havuzu-1\u2019e iletilecektir. \u0130letim Kanal\u0131-1\u2019in uzunlu\u011fu 3.407,47 m\u2019 dir. Y\u00fckleme Havuzu-1\u2019den 1,2 m \u00e7ap\u0131nda ve 880 m uzunlukta cebri boru ile al\u0131nacak olan sular, 1.600 m kuyruksuyu kotundaki HES-1\u2019de t\u00fcrbinlenerek elektrik enerjisi \u00fcretilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/tay-enerjiden-artvine-hes-projesi_6253.html\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Tay Enerji \u0130n\u015f. San. ve Tic. A.\u015e. taraf\u0131ndan Artvin \u0130li, Yusufeli \u0130l\u00e7esi, \u00d6zg\u00fcven K\u00f6y\u00fc, \u00d6zg\u00fcven Deresi \u00fczerinde &#8220; \u00d6zg\u00fcven Reg\u00fclat\u00f6r\u00fc ve HES\u2019in (14,270 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":19862,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[2878,4275,63,67,1009,165,18,35370,11554,11555],"views":1680,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19861"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=19861"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19861\/revisions"}],"predecessor-version":[{"id":19865,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19861\/revisions\/19865"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/19862"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=19861"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=19861"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=19861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}