{"id":198551,"date":"2025-07-18T13:05:01","date_gmt":"2025-07-18T10:05:01","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=198551"},"modified":"2025-07-18T13:05:01","modified_gmt":"2025-07-18T10:05:01","slug":"sedastan-kartepeye-240-milyon-tllik-yatirim-2","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sedastan-kartepeye-240-milyon-tllik-yatirim-2\/","title":{"rendered":"(Turkish) SEDA\u015e&#8217;tan Kartepe&#8217;ye 240 Milyon TL&#8217;lik Yat\u0131r\u0131m"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/198551\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Sakarya Elektrik Da\u011f\u0131t\u0131m A.\u015e. (SEDA\u015e), Kocaeli ili Kartepe il\u00e7esinde toplam 250 milyon TL\u2019lik yat\u0131r\u0131mla b\u00f6lgenin elektrik altyap\u0131s\u0131n\u0131 modernize ediyor. 2025 y\u0131l\u0131na ait bu kapsaml\u0131 yat\u0131r\u0131m program\u0131, da\u011f\u0131t\u0131m \u015febekesinin g\u00fcvenli\u011fini art\u0131rmay\u0131 ve b\u00f6lge halk\u0131na kesintisiz, kaliteli enerji sunmay\u0131 hedefliyor.<\/strong><\/h2>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-198552 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/7.jpg\" alt=\"\" width=\"550\" height=\"367\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/7.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/7-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/7-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/7-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/7-450x300.jpg 450w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>SEDA\u015e\u2019\u0131n Kocaeli\u2019de y\u00fcr\u00fctt\u00fc\u011f\u00fc yat\u0131r\u0131mlar, enerji arz g\u00fcvenli\u011fini g\u00fc\u00e7lendirmenin yan\u0131 s\u0131ra b\u00f6lgenin b\u00fcy\u00fcme potansiyeline ve artan enerji taleplerine uzun vadeli \u00e7\u00f6z\u00fcmler sunuyor. SEDA\u015e, 20 bin kilometrekarelik geni\u015f hizmet alan\u0131nda 2 milyonu a\u015fk\u0131n m\u00fc\u015fteriye ve toplamda 3,9 milyonluk bir n\u00fcfusa enerji sa\u011flarken, Kocaeli\u2019nin s\u00fcrd\u00fcr\u00fclebilir kalk\u0131nmas\u0131na kritik katk\u0131larda bulunuyor.<\/p>\n<p>2025 y\u0131l\u0131nda da yat\u0131r\u0131mlar\u0131n\u0131 art\u0131rarak s\u00fcrd\u00fcrmeyi hedefleyen SEDA\u015e, enerji altyap\u0131s\u0131nda modern ve yenilik\u00e7i \u00e7\u00f6z\u00fcmleri hayata ge\u00e7irerek b\u00f6lge halk\u0131na daha kaliteli hizmet sunmay\u0131 ama\u00e7l\u0131yor. Yat\u0131r\u0131mlar, il\u00e7elerin b\u00fcy\u00fcme potansiyeli, yeni ba\u011flant\u0131 taleplerindeki art\u0131\u015f, enerji kesintilerinin azalt\u0131lmas\u0131 hedefi ve mevcut altyap\u0131n\u0131n yenilenme ihtiyac\u0131na g\u00f6re planlan\u0131yor. Co\u011frafi ve iklimsel ko\u015fullar, arazi yap\u0131s\u0131 ve uzun vadeli i\u015fletilebilirlik gibi teknik kriterler dikkate al\u0131narak farkl\u0131 m\u00fchendislik \u00e7\u00f6z\u00fcmleri uygulan\u0131yor. Beton veya demir direkli havai hatlar, yeralt\u0131 kablo sistemleri ve modern da\u011f\u0131t\u0131m teknolojileri bu yakla\u015f\u0131m\u0131n temel unsurlar\u0131n\u0131 olu\u015fturuyor.<\/p>\n<p>Kartepe \u00f6zelinde ger\u00e7ekle\u015ftirilen yakla\u015f\u0131k 250 milyon TL\u2019lik yat\u0131r\u0131m program\u0131 kapsam\u0131nda 7 ayr\u0131 proje hayata ge\u00e7irildi. 2 ana da\u011f\u0131t\u0131m merkezi ve 15 da\u011f\u0131t\u0131m merkezi ile b\u00f6lgedeki enerji da\u011f\u0131t\u0131m kapasitesi \u00f6nemli \u00f6l\u00e7\u00fcde art\u0131r\u0131ld\u0131. Ayr\u0131ca, 18 yeni trafo ile d\u00f6n\u00fc\u015f\u00fcm altyap\u0131s\u0131 g\u00fc\u00e7lendirilirken, 25 km y\u00fcksek gerilim ve 51 km al\u00e7ak gerilim yeralt\u0131 hatt\u0131 in\u015fa edilerek modern ve g\u00fcvenli bir \u015febeke yap\u0131s\u0131 olu\u015fturuldu.<\/p>\n<p>Bu \u00e7al\u0131\u015fmalara ilave olarak 1,2 km y\u00fcksek gerilim ve 17 km al\u00e7ak gerilim havai hatt\u0131 devreye al\u0131narak b\u00f6lgedeki enerji eri\u015fimi daha geni\u015f bir alana yay\u0131ld\u0131. Ger\u00e7ekle\u015ftirilen bu yat\u0131r\u0131mlar, Kartepe halk\u0131na daha g\u00fcvenilir, s\u00fcrd\u00fcr\u00fclebilir ve kesintisiz enerji sa\u011flarken b\u00f6lgenin 2025 ve sonras\u0131nda artacak enerji ihtiya\u00e7lar\u0131 i\u00e7in de sa\u011flam bir altyap\u0131 olu\u015fturuyor.<\/p>\n<p>SEDA\u015e, kamu yarar\u0131 ilkesini ve yasal d\u00fczenlemelere tam uyumu esas alarak, b\u00f6lge halk\u0131na kesintisiz ve kaliteli enerji ula\u015ft\u0131rmak i\u00e7in yat\u0131r\u0131mlar\u0131n\u0131 2025 y\u0131l\u0131nda da art\u0131rarak s\u00fcrd\u00fcr\u00fcyor. Yenilik\u00e7i teknolojiler ve \u00e7evre dostu m\u00fchendislik \u00e7\u00f6z\u00fcmleriyle, Kocaeli\u2019nin enerji gelece\u011fine y\u00f6n vermeye ve b\u00f6lgenin kalk\u0131nmas\u0131na katk\u0131 sunmaya devam ediyor.<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Sakarya Elektrik Da\u011f\u0131t\u0131m A.\u015e. (SEDA\u015e), Kocaeli ili Kartepe il\u00e7esinde toplam 250 milyon TL\u2019lik yat\u0131r\u0131mla b\u00f6lgenin elektrik altyap\u0131s\u0131n\u0131 modernize ediyor. 2025 y\u0131l\u0131na ait [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":198552,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[116928,56856],"views":19,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/198551"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=198551"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/198551\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/198552"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=198551"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=198551"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=198551"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}