{"id":19844,"date":"2013-12-24T16:16:48","date_gmt":"2013-12-24T13:16:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=19844"},"modified":"2013-12-24T16:16:48","modified_gmt":"2013-12-24T13:16:48","slug":"10-milyar-kilovatsaatlik-elektrik-ozellestirilecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/10-milyar-kilovatsaatlik-elektrik-ozellestirilecek\/","title":{"rendered":"(Turkish) 10 Milyar Kilovatsaatlik Elektrik \u00d6zelle\u015ftirilecek!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/19844\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00d6zelle\u015ftirme program\u0131na al\u0131nan kamuya ait 4 termik santralin devrinin ger\u00e7ekle\u015fmesi halinde, y\u0131ll\u0131k yakla\u015f\u0131k 10 milyar kilovatsaatlik elektrik \u00fcretimi \u00f6zel sekt\u00f6re ge\u00e7ecek. Elektrik \u00fcretimindeki \u00f6zelle\u015ftirmelere gelecek y\u0131l da devam edilecek. Bu kapsamda \u00f6ncelikli olarak 4 termik santralin \u00f6zel sekt\u00f6re devrinin ger\u00e7ekle\u015ftirilmesi planlan\u0131yor.<\/strong><\/p>\n<p>\u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131 bir s\u00fcre \u00f6nce Kemerk\u00f6y Elektrik \u00dcretim ve Ticaret A\u015e\u2019ye ait Kemerk\u00f6y Termik Santrali, Yenik\u00f6y Yata\u011fan Elektrik \u00dcretim ve Ticaret A\u015e\u2019ye ait Yenik\u00f6y Termik Santrali, Elektrik \u00dcretim A\u015e\u2019ye ait \u00c7atala\u011fz\u0131 Termik Santrali, YEA\u015e\u2019a ait Yata\u011fan Termik Santrali i\u00e7in ilana \u00e7\u0131kt\u0131.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/10-milyar-kilovatsaatlik-elektrik-ozellestirilecek.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-19845\" title=\"10-milyar-kilovatsaatlik-elektrik-ozellestirilecek\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/10-milyar-kilovatsaatlik-elektrik-ozellestirilecek-300x224.jpg\" alt=\"\" width=\"300\" height=\"224\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/10-milyar-kilovatsaatlik-elektrik-ozellestirilecek-300x224.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/10-milyar-kilovatsaatlik-elektrik-ozellestirilecek-500x374.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/10-milyar-kilovatsaatlik-elektrik-ozellestirilecek-66x50.jpg 66w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/10-milyar-kilovatsaatlik-elektrik-ozellestirilecek.jpg 505w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Kemerk\u00f6y ve Yenik\u00f6y termik santralleri i\u00e7in \u00f6nyeterlilik ve son teklif verme s\u00fcresi 24 Ocak, \u00c7atala\u011fz\u0131 Termik Santrali i\u00e7in 5 \u015eubat, Yata\u011fan Termik Santrali i\u00e7in 10 \u015eubatta sona erecek.<\/p>\n<p>\u00d6zelle\u015ftirilmesi planlanan 4 \u00fcretim santralinin ge\u00e7en y\u0131lki toplam elektrik \u00fcretimi 10,2 milyar kilovatsaat olarak ger\u00e7ekle\u015fti. Bu ge\u00e7en y\u0131lki toplam elektrik \u00fcretiminin y\u00fczde 3,5\u2032ine kar\u015f\u0131l\u0131k geldi.<\/p>\n<p>Kamunun elektrik \u00fcretimindeki pay\u0131n\u0131n y\u00fczde 31 oldu\u011fu dikkate al\u0131nd\u0131\u011f\u0131nda, 4 termik santralin kamuya ait kurulu g\u00fc\u00e7teki pay\u0131 yakla\u015f\u0131k y\u00fczde 11\u2032i buluyor.<\/p>\n<p>Santrallerin toplam kurulu g\u00fcc\u00fc ise 1980 megavata kar\u015f\u0131l\u0131k geliyor. Santrallerin 3\u2032\u00fc Mu\u011fla\u2019da faaliyet g\u00f6steriyor. Mu\u011fla\u2019daki termik santraller linyite dayal\u0131 \u00fcretim yaparken, Zonguldak \u00c7atala\u011fz\u0131\u2019ndaki termik santralinde ise ta\u015fk\u00f6m\u00fcr\u00fc kullan\u0131l\u0131yor.<\/p>\n<p>Mu\u011fla\u2019daki Kemerk\u00f6y Termik Santrali\u2019nin kurulu g\u00fcc\u00fc 630 megavata kar\u015f\u0131l\u0131k geliyor. Santral, en y\u00fcksek elektrik \u00fcretimine 3 milyar 410 milyon kilovatsaat ile 2008 y\u0131l\u0131nda ula\u015ft\u0131. Santralin ge\u00e7en y\u0131lki elektrik \u00fcretimi ise 2 milyar 826 milyon kilovatsaat olarak ger\u00e7ekle\u015fti.<\/p>\n<p>Mu\u011fla\u2019daki Yenik\u00f6y Termik Santrali ise 420 megavatl\u0131k kurulu g\u00fcce sahip bulunuyor. Santral, en y\u00fcksek elektrik \u00fcretimini ge\u00e7en y\u0131l yakalad\u0131. Yenik\u00f6y Termik Santrali\u2019nin elektrik \u00fcretimine olan katk\u0131s\u0131 2012\u2032de 2 milyar 896 milyon kilovatsaat oldu.<\/p>\n<p>Zonguldak\u2019taki \u00c7atala\u011fz\u0131 Termik Santrali, 300 megavat kurulu g\u00fcce sahip durumda. Santral en y\u00fcksek elektrik \u00fcretimine 2007\u2032de 2 milyar 72 milyon kilovatsaatle ula\u015ft\u0131. Santralin ge\u00e7en y\u0131lki \u00fcretimi ise 1 milyar 479 milyon kilovatsaat olarak ger\u00e7ekle\u015fti.<\/p>\n<p>Mu\u011fla\u2019da \u00f6zelle\u015ftirilmesi \u00f6ng\u00f6r\u00fclen bir di\u011fer santral ise Yata\u011fan Termik Santrali. Santralin kurulu g\u00fcc\u00fc 630 megavat seviyesinde. Santral en y\u00fcksek elektrik \u00fcretimini 3 milyar 980 milyon kilovatsaat ile 2008 y\u0131l\u0131nda sa\u011flad\u0131. Ge\u00e7en y\u0131l santralin elektrik \u00fcretimi 2 milyar 981 milyon kilovatsaat oldu.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/12\/24\/10-milyar-kilovatsaatlik-elektrik-ozellestirilecek\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00d6zelle\u015ftirme program\u0131na al\u0131nan kamuya ait 4 termik santralin devrinin ger\u00e7ekle\u015fmesi halinde, y\u0131ll\u0131k yakla\u015f\u0131k 10 milyar kilovatsaatlik elektrik \u00fcretimi \u00f6zel sekt\u00f6re ge\u00e7ecek. Elektrik \u00fcretimindeki [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":19845,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[7689,19,63,67,1009,165,11544,3089,5172,11543,438,10619,11545,2841],"views":872,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19844"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=19844"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19844\/revisions"}],"predecessor-version":[{"id":19846,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19844\/revisions\/19846"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/19845"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=19844"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=19844"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=19844"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}