{"id":198428,"date":"2025-07-10T13:15:21","date_gmt":"2025-07-10T10:15:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=198428"},"modified":"2025-07-10T13:53:09","modified_gmt":"2025-07-10T10:53:09","slug":"gebze-tesislerinde-318-mwp-kurulu-ges-ile-yillik-1-950-ton-karbon-salimi-engellenecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gebze-tesislerinde-318-mwp-kurulu-ges-ile-yillik-1-950-ton-karbon-salimi-engellenecek\/","title":{"rendered":"(Turkish) Sar\u0131ta\u015f&#8217;tan 3,18 MWp&#8217;lik G\u00fcne\u015f Santrali Yat\u0131r\u0131m\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/198428\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Enerji verimlili\u011fini \u00f6n planda tutan y\u00fcksek performansl\u0131 \u00fcretim sistemleriyle dikkat \u00e7eken Sar\u0131ta\u015f Paslanmaz \u00c7elik, Gebze OSB\u2019deki tesislerinde hayata ge\u00e7irdi\u011fi G\u00fcne\u015f Enerjisi Santrali (GES) yat\u0131r\u0131m\u0131yla s\u00fcrd\u00fcr\u00fclebilirlik alan\u0131nda \u00f6nemli bir ad\u0131m at\u0131yor.<\/strong><\/h2>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-198429 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/saritas_logo_mavi.jpg\" alt=\"\" width=\"550\" height=\"128\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/saritas_logo_mavi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/saritas_logo_mavi-300x70.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/saritas_logo_mavi-500x116.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/saritas_logo_mavi-80x19.jpg 80w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>Paslanmaz \u00e7elik sekt\u00f6r\u00fcnde 65 y\u0131l\u0131 a\u015fk\u0131n uzmanl\u0131\u011fa sahip olan\u00a0<strong>Sar\u0131ta\u015f Paslanmaz \u00c7elik,<\/strong>\u00a0karbon ayak izini azaltmak ve ye\u015fil \u00fcretim hedeflerini g\u00fc\u00e7lendirmek ad\u0131na Gebze OSB\u2019de yer alan \u00fcretim tesisinde\u00a0<strong>G\u00fcne\u015f Enerjisi Santrali (GES) yat\u0131r\u0131m\u0131n\u0131n ikinci etab\u0131n\u0131\u00a0<\/strong>devreye almaya haz\u0131rlan\u0131yor.<\/p>\n<p>2024 y\u0131l\u0131nda ilk etab\u0131 devreye al\u0131nan proje kapsam\u0131nda, Sar\u0131ta\u015f halihaz\u0131rda g\u00fcncel enerji t\u00fcketiminin y\u00fczde 25\u2019ini g\u00fcne\u015f enerjisinden kar\u015f\u0131l\u0131yor. 2025 y\u0131l\u0131 i\u00e7erisinde tamamlanmas\u0131 planlanan ikinci etap yat\u0131r\u0131m ile bu oran\u0131n y\u00fczde 55 seviyesine ula\u015fmas\u0131 hedefleniyor. Toplamda\u00a0<strong>3,18 MWp kurulu g\u00fc\u00e7 kapasitesin<\/strong>e ula\u015facak olan GES ile y\u0131lda yakla\u015f\u0131k\u00a0<strong>3.786.000 kWh elektrik \u00fcretimi<\/strong>\u00a0ger\u00e7ekle\u015ftirilecek. Bu sayede tesisin enerji ihtiyac\u0131n\u0131n yar\u0131s\u0131ndan fazlas\u0131 yenilenebilir kaynaklardan sa\u011flanm\u0131\u015f olacak.<\/p>\n<p>Bu yat\u0131r\u0131mla birlikte Sar\u0131ta\u015f, y\u0131lda yakla\u015f\u0131k\u00a0<strong>1.950 ton CO<\/strong><strong>\u2082<\/strong>\u00a0sal\u0131m\u0131n\u0131 engelleyerek do\u011faya, yakla\u015f\u0131k\u00a0<strong>172.992 a\u011fac\u0131n y\u0131ll\u0131k \u00e7evresel katk\u0131s\u0131na e\u015fde\u011fer bir kazan\u0131m sa\u011flayacak.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-198430 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/Saritas_GM_Selcuk_Saritas_-2.jpg\" alt=\"Sar\u0131ta\u015f Paslanmaz \u00c7elik Genel M\u00fcd\u00fcr\u00fc Sel\u00e7uk Sar\u0131ta\u015f\" width=\"550\" height=\"367\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/Saritas_GM_Selcuk_Saritas_-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/Saritas_GM_Selcuk_Saritas_-2-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/Saritas_GM_Selcuk_Saritas_-2-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/Saritas_GM_Selcuk_Saritas_-2-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/07\/Saritas_GM_Selcuk_Saritas_-2-450x300.jpg 450w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p><strong>Sar\u0131ta\u015f Paslanmaz \u00c7elik Genel M\u00fcd\u00fcr\u00fc Sel\u00e7uk Sar\u0131ta\u015f<\/strong>\u00a0konuyla ilgili yapt\u0131\u011f\u0131 a\u00e7\u0131klamada; <em>\u201cGebze OSB\u2019deki tesislerimizde, enerji verimlili\u011fini \u00f6n planda tutan y\u00fcksek performansl\u0131 \u00fcretim ekipmanlar\u0131 ve ileri seviye proses otomasyon sistemlerini aktif olarak kullan\u0131yoruz. GES yat\u0131r\u0131m\u0131m\u0131z ise ye\u015fil \u00e7elik \u00fcretim kapasitemizi g\u00fc\u00e7lendiren sorumlu \u00fcretim anlay\u0131\u015f\u0131m\u0131z\u0131n somut bir g\u00f6stergesidir. Karbon sal\u0131m\u0131n\u0131 d\u00fc\u015f\u00fcren bu hamleyle sadece bug\u00fcn\u00fc de\u011fil, yar\u0131n\u0131 da planl\u0131yoruz\u201d<\/em> dedi.<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji verimlili\u011fini \u00f6n planda tutan y\u00fcksek performansl\u0131 \u00fcretim sistemleriyle dikkat \u00e7eken Sar\u0131ta\u015f Paslanmaz \u00c7elik, Gebze OSB\u2019deki tesislerinde hayata ge\u00e7irdi\u011fi G\u00fcne\u015f Enerjisi Santrali [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":198438,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[27497,45418],"views":23,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/198428"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=198428"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/198428\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/198438"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=198428"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=198428"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=198428"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}