{"id":197885,"date":"2025-06-25T14:05:51","date_gmt":"2025-06-25T11:05:51","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=197885"},"modified":"2025-06-25T14:11:52","modified_gmt":"2025-06-25T11:11:52","slug":"ember-turkiye-hibrit-gunes-santralleriyle-sebeke-kisitlarini-asabilir","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ember-turkiye-hibrit-gunes-santralleriyle-sebeke-kisitlarini-asabilir\/","title":{"rendered":"(Turkish) Ember, T\u00fcrkiye Hibrit G\u00fcne\u015f Santralleriyle \u015eebeke K\u0131s\u0131tlar\u0131n\u0131 A\u015fabilir"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/197885\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2 class=\"subheader xt-post-excerpt\">\u015eebeke kapasitesinin s\u0131n\u0131rl\u0131 olmas\u0131, yenilenebilir enerji projelerinin reddedilmesine neden olurken enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcn\u00fc de yava\u015flat\u0131yor. Gerekli d\u00fczenlemelerle, T\u00fcrkiye\u2019deki r\u00fczgar ve hidroelektrik santrallerine 8 GW\u2019l\u0131k hibrit g\u00fcne\u015f santrali eklemek m\u00fcmk\u00fcn.<\/h2>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-197886\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/06\/WhatsApp-Gorsel-2025-06-25-saat-13.50.32_9ca4ff8d.jpg\" alt=\"\" width=\"550\" height=\"366\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/06\/WhatsApp-Gorsel-2025-06-25-saat-13.50.32_9ca4ff8d.jpg 275w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/06\/WhatsApp-Gorsel-2025-06-25-saat-13.50.32_9ca4ff8d-75x50.jpg 75w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<h3><strong>Y\u00f6netici \u00d6zeti<\/strong><\/h3>\n<p>\u0130\u015fletmede olan santrallerle ayn\u0131 iletim hatt\u0131n\u0131 kulland\u0131\u011f\u0131 i\u00e7in yeni \u015febeke yat\u0131r\u0131m\u0131na ihtiya\u00e7 duymayan hibrit santraller, \u015febekeye ba\u011flant\u0131 kapasitesi k\u0131s\u0131t\u0131 nedeniyle yava\u015flayan enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcn\u00fc yeniden h\u0131zland\u0131rma potansiyeline sahip. G\u00fcne\u015f potansiyelinin y\u00fcksek oldu\u011fu T\u00fcrkiye\u2019de, hibrit g\u00fcne\u015f santrallerinin \u00f6n\u00fcndeki engeller kald\u0131r\u0131l\u0131rsa mevcut g\u00fcne\u015f kurulu g\u00fcc\u00fc en az %35 art\u0131r\u0131labilir. Bu sayede santrallerin \u00fcretim kapasiteleri artarken, mevcut iletim hatlar\u0131 da daha verimli kullan\u0131labilir. T\u00fcrkiye\u2019de g\u00fcne\u015f enerjisi kurulu g\u00fcc\u00fc, k\u0131sa s\u00fcre i\u00e7inde 30 GW s\u0131n\u0131r\u0131n\u0131 a\u015farak, kaynaklara g\u00f6re kurulu g\u00fc\u00e7 s\u0131ralamas\u0131nda a\u00e7\u0131k ara lider konumuna gelebilir.<\/p>\n<h3><strong>Yeni yat\u0131r\u0131mlar \u015febeke k\u0131s\u0131t\u0131na tak\u0131l\u0131yor, hibrit g\u00fcne\u015f kurulumlar\u0131 yava\u015f ilerliyor<\/strong><\/h3>\n<p>Eyl\u00fcl 2024\u2019ten beri iletim seviyesinden ba\u011flant\u0131 i\u00e7in yeni kapasite a\u00e7\u0131klanmazken; \u015eubat 2024 ile Nisan 2025 aras\u0131ndaki 15 ayl\u0131k d\u00f6nemde, T\u00fcrkiye\u2019de lisanss\u0131z g\u00fcne\u015f santralleri i\u00e7in yap\u0131lan iletim seviyesinden \u015febeke ba\u011flant\u0131 ba\u015fvurular\u0131n\u0131n %65\u2019i \u201cba\u011flant\u0131 k\u0131s\u0131tlar\u0131\u201d nedeniyle reddedildi. May\u0131s 2025 itibar\u0131yla T\u00fcrkiye\u2019de da\u011f\u0131t\u0131m seviyesinden ba\u011flant\u0131 i\u00e7in kalan kapasite ise sadece 0,52 GW. Oysa hidroelektrik veya r\u00fczgar santralleri ile ayn\u0131 \u015febeke ba\u011flant\u0131s\u0131n\u0131 kullanabilen hibrit g\u00fcne\u015f santralleri sayesinde, ilave \u015febeke yat\u0131r\u0131m\u0131na ihtiya\u00e7 olmadan T\u00fcrkiye\u2019nin g\u00fcne\u015f enerjisi kapasitesi art\u0131r\u0131labilir. Di\u011fer taraftan T\u00fcrkiye, hibrit g\u00fcne\u015f kurulumlar\u0131nda ise a\u011f\u0131r ilerliyor. Son d\u00f6rt y\u0131lda 3,5 GW\u2019l\u0131k hibrit g\u00fcne\u015f projesine kurulum izni verilirken, bu kapasitenin yaln\u0131zca %41\u2019\u0130 i\u015fletmeye al\u0131nabildi.<\/p>\n<h3><strong>T\u00fcrkiye\u2019deki hibrit g\u00fcne\u015f potansiyeli 8 GW\u2019tan fazla<\/strong><\/h3>\n<p>Mevcut piyasa ko\u015fullar\u0131 ve ekonomik g\u00f6stergelere dayanan potansiyel analizine g\u00f6re, T\u00fcrkiye\u2019de \u00f6zel sekt\u00f6re ait r\u00fczgar ve hidroelektrik santrallerindeki hibrit g\u00fcne\u015f potansiyeli 8 GW seviyesinde. Elektrik fiyatlar\u0131 ile kredi faiz oranlar\u0131n\u0131n daha elveri\u015fli oldu\u011fu senaryolarda ise bu potansiyel 25,6 GW\u2019a kadar \u00e7\u0131kmaktad\u0131r. S\u00f6z konusu hibrit g\u00fcne\u015f potansiyelinin %46\u2019s\u0131, barajl\u0131 hidroelektrik santrallerde bulunuyor. 8 GW\u2019l\u0131k hibrit g\u00fcne\u015f kapasitesinin devreye al\u0131nmas\u0131, toplam g\u00fcne\u015f kurulu g\u00fcc\u00fcn\u00fc 30 GW\u2019a \u00e7\u0131kararak g\u00fcne\u015fi, T\u00fcrkiye\u2019nin a\u00e7\u0131k ara en b\u00fcy\u00fck enerji kayna\u011f\u0131 haline getirebilir.<\/p>\n<h3><strong>\u00a02024 y\u0131l\u0131nda r\u00fczgar ve hidroelektrik \u00fcretimine, hibrit g\u00fcne\u015f %14 katk\u0131 sa\u011flad\u0131<\/strong><\/h3>\n<p>Mevcut hibrit g\u00fcne\u015f enerjisi santralleri, 2024 y\u0131l\u0131nda ba\u011fl\u0131 olduklar\u0131 25 r\u00fczgar ve hidroelektrik santralinin \u00fcretimine %14 oran\u0131nda ek katk\u0131 sa\u011flad\u0131. Hibrit g\u00fcne\u015f santrallerinin \u00fcretime sa\u011flad\u0131klar\u0131 katk\u0131 sayesinde, ba\u011fl\u0131 olduklar\u0131 birincil kaynaklar\u0131n mevcut ba\u011flant\u0131 kapasite fakt\u00f6r\u00fc ortalama 5 puan artarak %32\u2019ye y\u00fckseldi. Hibrit g\u00fcne\u015f santrallerinin etkisi yaz aylar\u0131nda en y\u00fcksek seviyesine \u00e7\u0131k\u0131yor. 2024 Haziran ve A\u011fustos aylar\u0131 aras\u0131nda hibrit g\u00fcne\u015f santralleri r\u00fczgar, akarsu ve barajl\u0131 hidroelektrik santrallerinin ba\u011flant\u0131 kapasite fakt\u00f6rlerini ortalama 7,3 puan art\u0131rd\u0131. \u00d6zellikle, Do\u011fu Anadolu B\u00f6lgesi\u2019nde bulunan bir r\u00fczgar santralinin ba\u011flant\u0131 kapasite fakt\u00f6r\u00fc, 2024 y\u0131l\u0131nda hibrit g\u00fcne\u015f santrali sayesinde neredeyse 20 puanl\u0131k art\u0131\u015f kaydetti.<\/p>\n<p>Kaynak: <a href=\"https:\/\/ember-energy.org\/tr\/analizler\/turkiye-hibrit-gunes-santralleriyle-sebeke-kisitlarini-asabilir\/\">EMBER<\/a><\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u015eebeke kapasitesinin s\u0131n\u0131rl\u0131 olmas\u0131, yenilenebilir enerji projelerinin reddedilmesine neden olurken enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcn\u00fc de yava\u015flat\u0131yor. Gerekli d\u00fczenlemelerle, T\u00fcrkiye\u2019deki r\u00fczgar ve hidroelektrik santrallerine 8 [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":197886,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[69720,67,2326,16],"views":16,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/197885"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=197885"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/197885\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/197886"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=197885"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=197885"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=197885"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}