{"id":197551,"date":"2025-05-26T17:04:10","date_gmt":"2025-05-26T14:04:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=197551"},"modified":"2025-05-26T18:12:16","modified_gmt":"2025-05-26T15:12:16","slug":"azerbaycana-90-milyon-dolarlik-batarya-projesi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/azerbaycana-90-milyon-dolarlik-batarya-projesi\/","title":{"rendered":"(Turkish) Azerbeycan&#8217;a 90 Milyon Dolarl\u0131k Enerji Depolama Tesisi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/197551\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h3><strong>YEO Teknoloji, Azerbaycan\u2019\u0131n enerji \u015febeke i\u015fleticisi Azernerji CJSC ile 500 MWh kapasiteli anahtar teslim enerji depolama sistemi kurulumu i\u00e7in 90,5 milyon dolarl\u0131k s\u00f6zle\u015fme imzalad\u0131. YEO Teknoloji\u2019nin enerji depolama sistemleri i\u015ftiraki ReapG ile ger\u00e7ekle\u015ftirece\u011fi proje ile Azerbaycan\u2019\u0131n ye\u015fil enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcne \u00f6nemli katk\u0131da bulunulacak\u00a0 <\/strong><\/h3>\n<p>Yenilenebilir enerji alan\u0131nda k\u00fcresel bir oyuncu haline gelen YEO Teknoloji, global projeleriyle b\u00fcy\u00fcmeye devam ediyor. YEO Teknoloji, Azerbaycan\u2019\u0131n enerji \u015febeke i\u015fleticisi Azernerji CJSC ile ile toplam 500 MWh kapasiteli enerji depolama sisteminin anahtar teslim kurulumu i\u00e7in 90.497.070 USD b\u00fcy\u00fckl\u00fc\u011f\u00fcnde s\u00f6zle\u015fme imzalad\u0131. S\u00f6zle\u015fme kapsam\u0131nda; batarya, inverter (G\u00fc\u00e7 D\u00f6n\u00fc\u015ft\u00fcr\u00fcc\u00fc Sistemi &#8211; PCS), batarya y\u00f6netim sistemi (BMS), enerji y\u00f6netim sistemleri (EMS) temini, m\u00fchendisli\u011fi ve devreye alma i\u015fleri ger\u00e7ekle\u015ftirilecek. Ayr\u0131ca enerji depolama sistemlerinin y\u00fcksek gerilim trafo merkezi ve \u015febekeyle entegrasyonu dahil u\u00e7tan uca kurulumu yap\u0131lacak. 1 y\u0131l i\u00e7inde tamamlanmas\u0131 planlanan projeyi, YEO Teknoloji\u2019nin i\u015ftiraki olan ReapG ger\u00e7ekle\u015ftirecek.<\/p>\n<p><img loading=\"lazy\" class=\"wp-image-197552 aligncenter\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/Image00002.jpg\" alt=\"\" width=\"500\" height=\"281\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/Image00002.jpg 1920w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/Image00002-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/Image00002-1024x576.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/Image00002-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/Image00002-1536x864.jpg 1536w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/Image00002-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/Image00002-80x45.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<h3><strong>Lityum-iyon batarya ile \u015febekeye destek<\/strong><\/h3>\n<p>S\u00f6z konusu proje ile Azerbaycan\u2019\u0131n ye\u015fil enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcne ve yenilenebilir enerji entegrasyonuna katk\u0131 sa\u011flanmas\u0131 hedefleniyor. Lityum-iyon batarya teknolojileri ve geli\u015fmi\u015f enerji y\u00f6netim sistemleriyle elektrik \u015febekesinin g\u00fcvenilirli\u011fi ve esnekli\u011fi art\u0131r\u0131lacak. Proje kapsam\u0131nda kurulacak olan 500 MWh kapasiteli tesisler, Azerbaycan\u2019daki 2 ayr\u0131 b\u00f6lgedeki trafo merkezlerine entegre edilecek. Enerji sekt\u00f6r\u00fcn\u00fcn her alan\u0131nda u\u00e7tan uca \u00e7\u00f6z\u00fcm sunabilen YEO Teknoloji, global \u00f6l\u00e7ekte proje geli\u015ftirme, y\u00fcr\u00fctme ve operasyon kabiliyetiyle b\u00f6lgedeki en b\u00fcy\u00fck enerji depolama sistemini hayata ge\u00e7irecek.<\/p>\n<p><img loading=\"lazy\" class=\"wp-image-197554 aligncenter\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/1748004821_YEO1.jpg\" alt=\"\" width=\"500\" height=\"371\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/1748004821_YEO1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/1748004821_YEO1-300x223.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/1748004821_YEO1-500x371.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/1748004821_YEO1-67x50.jpg 67w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<h3><strong>D\u00fcnya devi ile ortakl\u0131k kurmu\u015ftu<\/strong><\/h3>\n<p>YEO Teknoloji, bu y\u0131l \u015fubat ay\u0131nda enerji depolama sistemleri alan\u0131ndaki ata\u011f\u0131n\u0131 g\u00fc\u00e7lendirmek \u00fczere \u00f6nemli bir ad\u0131m atm\u0131\u015ft\u0131. YEO Teknoloji\u2019nin y\u00fczde 100 i\u015ftiraki olan Reap Battery ve d\u00fcnyan\u0131n \u00f6nde batarya \u00fcreticilerinden Tier 1 listesindeki Great Power ile ortakl\u0131k kurmu\u015ftu. %51\u2019i Reap Battery ve %49\u2019u Great Power ortakl\u0131\u011f\u0131 ile kurulan ReapG, y\u0131l\u0131n en \u00f6nemli projelerinden birine Azerbaycan\u2019da imza atacak. \u0130\u015f birli\u011fine g\u00f6re \u0130stanbul Tuzla\u2019daki enerji depolama sistemleri fabrikas\u0131nda \u00fcretim yap\u0131larak ba\u015fta T\u00fcrkiye ve Avrupa pazar\u0131 olmak \u00fczere T\u00fcrki Cumhuriyetler ve Afrika \u00fclkelerine ihracat ger\u00e7ekle\u015ftirilecek. ReapG\u2019nin tamamlanmak \u00fczere olan \u0130stanbul Tuzla\u2019daki fabrikas\u0131nda 5 GWh kapasiteyle \u00fcretim hedefleniyor. YEO Teknoloji, 3 k\u0131tada ve 30\u2019dan fazla \u00fclkede 400\u2019den fazla proje tamamlad\u0131. Geli\u015fmi\u015f enerji depolama \u00e7\u00f6z\u00fcmlerinden, elektrik \u015febekelerine, y\u00fcksek voltaj trafo merkezleri, yenilenebilir enerji santralleri, end\u00fcstriyel, ticari tesisler ve hanelerin enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcnden hidrojene kadar farkl\u0131 alanlarda projeler y\u00fcr\u00fcten YEO Teknoloji, global bir oyuncu olma yolunda ad\u0131mlar\u0131n\u0131 h\u0131zland\u0131r\u0131yor. YEO Teknoloji, dekarbonizasyon, desantralizasyon ve dijitalizasyon odakl\u0131 \u00e7al\u0131\u015fmalar\u0131yla daha ya\u015fanabilir bir d\u00fcnya i\u00e7in \u2018Bizce m\u00fcmk\u00fcn\u2019 slogan\u0131yla d\u00fcnyan\u0131n daha ya\u015fanabilir bir yer olmas\u0131 i\u00e7in \u00e7al\u0131\u015fmaya devam ediyor.<\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e-<a href=\"http:\/\/alperen.ertas@enerjigazetesi.ist\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. YEO Teknoloji, Azerbaycan\u2019\u0131n enerji \u015febeke i\u015fleticisi Azernerji CJSC ile 500 MWh kapasiteli anahtar teslim enerji depolama sistemi kurulumu i\u00e7in 90,5 milyon dolarl\u0131k [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":197554,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[4319,61,67,105],"views":20,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/197551"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=197551"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/197551\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/197554"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=197551"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=197551"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=197551"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}