{"id":197517,"date":"2025-05-19T15:47:33","date_gmt":"2025-05-19T12:47:33","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=197517"},"modified":"2025-05-19T15:47:33","modified_gmt":"2025-05-19T12:47:33","slug":"elektrik-uretim-ve-depolama-tesisleri-kabul-yonetmeligi-revize-edildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/elektrik-uretim-ve-depolama-tesisleri-kabul-yonetmeligi-revize-edildi\/","title":{"rendered":"(Turkish) Elektrik \u00dcretim ve Depolama Tesisleri Kabul Y\u00f6netmeli\u011fi Revize Edildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/197517\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131nca, elektrik \u00fcretim ve depolama tesislerine ili\u015fkin kabul y\u00f6netmeli\u011finde de\u011fi\u015fikli\u011fe gidildi.<\/strong><\/h2>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-197519\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/elektrik-uretim-ve-depolama-tesisleri-kabul-yonetmeligi-revize-edildi.jpg\" alt=\"\" width=\"500\" height=\"355\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/elektrik-uretim-ve-depolama-tesisleri-kabul-yonetmeligi-revize-edildi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/elektrik-uretim-ve-depolama-tesisleri-kabul-yonetmeligi-revize-edildi-300x213.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/elektrik-uretim-ve-depolama-tesisleri-kabul-yonetmeligi-revize-edildi-500x355.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/elektrik-uretim-ve-depolama-tesisleri-kabul-yonetmeligi-revize-edildi-70x50.jpg 70w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p class=\"selectionShareable\">Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131n\u0131n \u2018Elektrik \u00dcretim ve Elektrik Depolama Tesisleri Kabul Y\u00f6netmeli\u011finde De\u011fi\u015fiklik Yap\u0131lmas\u0131na Dair Y\u00f6netmeli\u011fi\u2019, Resmi Gazete\u2019de yay\u0131mlanarak y\u00fcr\u00fcrl\u00fc\u011fe girdi.<\/p>\n<p class=\"selectionShareable\">Buna g\u00f6re, y\u00f6netmeli\u011fin 1\u2019inci, 2\u2019nci, 5\u2019inci, 6\u2019nc\u0131, 7\u2019nci, 12\u2019nci, 16\u2019nc\u0131, maddelerinde yer alan \u2018tesisler\u2019 ibaresi \u2018tesisler\/\u00fcniteler\u2019 \u015feklinde de\u011fi\u015ftirildi.<\/p>\n<p class=\"selectionShareable\">Ayn\u0131 y\u00f6netmeli\u011fe elektrik depolama tesisi (EDT), batarya y\u00f6netim sistemi (BYS), elektrik depolama \u00fcnitesi (ED\u00dc), enerji y\u00f6netim sistemi (EYS), sistem kontrol yaz\u0131l\u0131m\u0131 (SKY) k\u0131saltmalar\u0131n\u0131n anlam ve kapsamlar\u0131 eklendi.<\/p>\n<p class=\"selectionShareable\">Y\u00f6netmelikte kabul ba\u015fvuru kapsam\u0131, de\u011ferlendirme s\u00fcreci gibi konularda da de\u011fi\u015fikliklere gidilerek, \u00e7e\u015fitli madde ve f\u0131kralar revize edildi.\u200b\u200b\u200b\u200b\u200b\u200b\u200b<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131nca, elektrik \u00fcretim ve depolama tesislerine ili\u015fkin kabul y\u00f6netmeli\u011finde de\u011fi\u015fikli\u011fe gidildi. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131n\u0131n \u2018Elektrik \u00dcretim [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":197519,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[2047,5300,27644,116809,1388],"views":21,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/197517"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=197517"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/197517\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/197519"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=197517"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=197517"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=197517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}