{"id":197309,"date":"2025-05-08T15:09:57","date_gmt":"2025-05-08T12:09:57","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=197309"},"modified":"2025-05-08T15:09:57","modified_gmt":"2025-05-08T12:09:57","slug":"galata-wind-toplam-kurulu-gucunu-348-mwa-yukseltti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/galata-wind-toplam-kurulu-gucunu-348-mwa-yukseltti\/","title":{"rendered":"(Turkish) &#8217;Galata Wind&#8217; Toplam Kurulu G\u00fcc\u00fcn\u00fc 348 MW\u2019a Y\u00fckseltti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/197309\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>T\u00fcrkiye\u2019nin \u00f6nde gelen yenilenebilir enerji \u015firketlerinden Galata Wind, \u201cTemiz bir gelecek i\u00e7in temiz enerji\u201d vizyonu do\u011frultusunda toplam kurulu g\u00fcc\u00fcn\u00fc yakla\u015f\u0131k 348 MW\u2019a y\u00fckseltti. Ta\u015fp\u0131nar Hibrit GES projesi ikinci faz\u0131n\u0131 tamamlayan \u015firket, Mersin RES\u2019te de 5 yeni t\u00fcrbini devreye al\u0131yor. Bu kapasite art\u0131\u015flar\u0131yla birlikte, Galata Wind\u2019in y\u0131ll\u0131k toplam portf\u00f6y \u00fcretiminin y\u00fczde 25 art\u0131\u015f g\u00f6stermesi, karbon emisyon azalt\u0131m\u0131na katk\u0131s\u0131n\u0131n ise y\u0131ll\u0131k yakla\u015f\u0131k 70 bin ton CO<sub>2<\/sub> y\u00fckselmesi bekleniyor.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-197312\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/galata-wind-toplam-kurulu-gucunu-348-mwa-yukseltti.jpg\" alt=\"\" width=\"500\" height=\"373\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/galata-wind-toplam-kurulu-gucunu-348-mwa-yukseltti.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/galata-wind-toplam-kurulu-gucunu-348-mwa-yukseltti-300x224.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/galata-wind-toplam-kurulu-gucunu-348-mwa-yukseltti-500x373.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/galata-wind-toplam-kurulu-gucunu-348-mwa-yukseltti-67x50.jpg 67w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>2030 hedefleri do\u011frultusunda planlad\u0131klar\u0131 yat\u0131r\u0131mlar\u0131 hayata ge\u00e7irmeye kararl\u0131l\u0131kla devam ettiklerini vurgulayan <strong>Galata Wind CEO\u2019su Burak Kuyan<\/strong> \u015funlar\u0131 ifade etti:<\/p>\n<div id=\"attachment_197313\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img aria-describedby=\"caption-attachment-197313\" loading=\"lazy\" class=\"wp-image-197313\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/Burak-Kuyan.jpg\" alt=\"\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/Burak-Kuyan.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/Burak-Kuyan-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/Burak-Kuyan-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/Burak-Kuyan-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/05\/Burak-Kuyan-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><p id=\"caption-attachment-197313\" class=\"wp-caption-text\">Galata Wind CEO\u2019su Burak Kuyan<\/p><\/div>\n<p><em>\u201c2030 y\u0131l\u0131 hedefimiz olan 1000 MW\u2019\u0131n \u00fczerine ula\u015fmak i\u00e7in bug\u00fcn iki \u00f6nemli yat\u0131r\u0131m\u0131 pe\u015fpe\u015fe devreye alman\u0131n gururunu ya\u015f\u0131yoruz. Her biri 6,2 MW g\u00fcc\u00fcnde 5 adet Vestas V162 t\u00fcrbin, halihaz\u0131rdaki 20 adet R\u00fczgar t\u00fcrbinine eklenmi\u015f ve Mersin RES santralimizin toplam kurulu g\u00fcc\u00fc\u00a0yakla\u015f\u0131k 94 MW\u00a0olmu\u015ftur.\u201d<\/em><\/p>\n<p>Galata Wind\u2019in Hibrit projesi olan<strong>\u00a0<\/strong>Ta\u015fp\u0131nar Birle\u015fik Yenilenebilir Elektrik \u00dcretim Tesisi\u2019nin ikinci faz\u0131n\u0131n tamamland\u0131\u011f\u0131na da dikkat \u00e7eken <strong>Kuyan<\/strong>, <em>\u201cMontaj\u0131 tamamlanan yeni fotovoltaik mod\u00fcllerimiz, daha \u00f6nce kabul\u00fc yap\u0131lan Faz 1 yat\u0131r\u0131m\u0131na eklendi. B\u00f6ylece RES ve GES santralimizin toplam kurulu g\u00fcc\u00fc\u00a0yakla\u015f\u0131k 115 MW\u00a0oldu. Bursa ve Mersin\u2019deki bu yat\u0131r\u0131mlar\u0131m\u0131z sonucunda, portf\u00f6y\u00fcm\u00fcz\u00fcn ortalama y\u0131ll\u0131k \u00fcretiminin yakla\u015f\u0131k\u00a0190 milyon kWh artmas\u0131n\u0131 ve karbon emisyon azalt\u0131m\u0131na yakla\u015f\u0131k 70.000 ton CO<sub>2<\/sub> ek katk\u0131 sa\u011flanmas\u0131n\u0131 bekliyoruz\u201d<\/em>diye konu\u015ftu.<\/p>\n<p>T\u00fcrkiye\u2019nin ilk ye\u015fil halka arz\u0131n\u0131 ger\u00e7ekle\u015ftiren yenilenebilir enerji \u015firketi olarak sekt\u00f6rdeki \u00f6nc\u00fc rollerini s\u00fcrd\u00fcrmeye kararl\u0131 olduklar\u0131n\u0131 da belirten<strong>\u00a0Kuyan, <\/strong><em>\u201cY\u0131l\u0131n<\/em><em> ilk \u00e7eyre\u011fini geride b\u0131rak\u0131rken sekt\u00f6rdeki rekabet g\u00fcc\u00fcm\u00fcz\u00fc koruyarak uzun vadeli pozisyonumuzu g\u00fc\u00e7lendirme y\u00f6n\u00fcnde \u00f6nemli ad\u0131mlar att\u0131k. \u00dclkemizin ye\u015fil d\u00f6n\u00fc\u015f\u00fcm\u00fc i\u00e7in yap\u0131lan her kapasite art\u0131r\u0131m\u0131, \u00e7ocuklar\u0131m\u0131z\u0131n ve bizim ortak gelece\u011fimiz i\u00e7in yap\u0131lan bir yat\u0131r\u0131md\u0131r. Bu sorumlulu\u011fun bilinciyle yat\u0131r\u0131m ve b\u00fcy\u00fcme i\u015ftiham\u0131z\u0131 s\u00fcrd\u00fcr\u00fcyor, \u00fclkemiz ve t\u00fcm payda\u015flar\u0131m\u0131z i\u00e7in de\u011fer yaratma \u00f6nceli\u011fiyle \u00e7al\u0131\u015f\u0131yoruz. Yat\u0131r\u0131mc\u0131lar\u0131m\u0131za taahh\u00fct etti\u011fimiz gibi sadece yenilenebilir kaynaklardan elektrik enerjisi \u00fcreterek, enerjide \u00fclkemizin d\u0131\u015fa ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n\u0131n azalt\u0131lmas\u0131na katk\u0131 sa\u011flamaya ve s\u00fcrd\u00fcr\u00fclebilir de\u011fer yaratmaya devam edece\u011fiz\u201d\u00a0<\/em>dedi.<\/p>\n<p>Galata Wind\u2019in ilk \u00fc\u00e7 ayda faiz, amortisman ve vergi \u00f6ncesi k\u00e2r\u0131 (FAV\u00d6K) 395 milyon TL olarak ger\u00e7ekle\u015fti. Bu sonu\u00e7ta, enerji fiyatlar\u0131ndaki dalgalanmalar ve yenilenebilir enerji kaynaklar\u0131n\u0131n artan kullan\u0131m\u0131 \u00f6nemli rol oynad\u0131. TMS 29 etkisi ile net sat\u0131\u015f gelirlerinde art\u0131\u015f etkisi endeks ile bask\u0131lan\u0131rken, \u015firketin sekt\u00f6rdeki ve makroekonomik g\u00f6stergelerdeki dalgalanmalara ra\u011fmen operasyonel verimlili\u011fini korudu\u011funu g\u00f6stermi\u015f ve FAV\u00d6K marj\u0131n\u0131 %70 \u00fczerinde korumu\u015ftur ve sonu\u00e7 olarak \u015firketin vergi \u00f6ncesi k\u00e2r\u0131, 315 milyon TL olarak kaydedilmi\u015ftir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin \u00f6nde gelen yenilenebilir enerji \u015firketlerinden Galata Wind, \u201cTemiz bir gelecek i\u00e7in temiz enerji\u201d vizyonu do\u011frultusunda toplam kurulu g\u00fcc\u00fcn\u00fc yakla\u015f\u0131k 348 MW\u2019a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":197312,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,50],"tags":[89633,2326,2569,474,231],"views":15,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/197309"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=197309"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/197309\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/197312"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=197309"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=197309"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=197309"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}