{"id":197010,"date":"2025-04-21T14:28:25","date_gmt":"2025-04-21T11:28:25","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=197010"},"modified":"2025-04-21T14:28:25","modified_gmt":"2025-04-21T11:28:25","slug":"kalehan-enerjinin-temiz-elektrik-uretimi-tescillendi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kalehan-enerjinin-temiz-elektrik-uretimi-tescillendi\/","title":{"rendered":"(Turkish) &#8217;Kalehan Enerji&#8217;nin Temiz Elektrik \u00dcretimi Tescillendi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/197010\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Kalehan Enerji, karbon sal\u0131m\u0131n\u0131n azalt\u0131lmas\u0131 konusunda \u00f6nemli bir ad\u0131m att\u0131. \u015eirketin Yukar\u0131 Kalek\u00f6y Baraj\u0131 ve Hidroelektrik Santrali (HES), International Carbon Registry (ICR) taraf\u0131ndan yap\u0131lan validasyon s\u00fcrecini tamamlayarak sisteme kayd\u0131n\u0131 ger\u00e7ekle\u015ftirdi. Y\u0131lda 1,5 TWh temiz enerji \u00fcreten santral, her y\u0131l 835.000 tonun \u00fczerinde karbon sal\u0131m\u0131n\u0131 engelliyor.<\/strong><\/h2>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-197014\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/kalehan-enerjinin-temiz-elektrik-uretimi-tescillendi-1.jpg\" alt=\"\" width=\"500\" height=\"281\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/kalehan-enerjinin-temiz-elektrik-uretimi-tescillendi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/kalehan-enerjinin-temiz-elektrik-uretimi-tescillendi-1-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/kalehan-enerjinin-temiz-elektrik-uretimi-tescillendi-1-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/kalehan-enerjinin-temiz-elektrik-uretimi-tescillendi-1-80x45.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Avrupa Birli\u011fi Ye\u015fil Mutabakat\u0131 \u00e7er\u00e7evesinde 2050 y\u0131l\u0131nda karbon emisyonunu s\u0131f\u0131rlama \u00e7al\u0131\u015fmalar\u0131, t\u00fcm d\u00fcnyada \u00f6nemli de\u011fi\u015fim ve d\u00f6n\u00fc\u015f\u00fcmleri beraberinde getirirken T\u00fcrkiye\u2019de de bu konuda \u00e7al\u0131\u015fmalar s\u00fcr\u00fcyor. Enerji sekt\u00f6r\u00fcnde, yeni yat\u0131r\u0131mlar\u0131yla yenilenebilir kaynakl\u0131 enerji portf\u00f6y\u00fcn\u00fc h\u0131zla art\u0131ran <strong>Cengiz Holding<\/strong>\u2019in i\u015ftiraki<strong> Kalehan Enerji<\/strong>\u2019nin <strong>Bing\u00f6l, Solhan<\/strong>\u2019da bulunan <strong>Yukar\u0131 Kalek\u00f6y Baraj\u0131 ve Hidroelektrik Santrali (HES)<\/strong>, validasyon s\u00fcre\u00e7lerini ba\u015far\u0131yla tamamlayarak International Carbon Registry (ICR) taraf\u0131ndan sisteme kayd\u0131 ger\u00e7ekle\u015ftirildi.<\/p>\n<div id=\"attachment_197013\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img aria-describedby=\"caption-attachment-197013\" loading=\"lazy\" class=\"wp-image-197013\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/GultekinKeles.jpg\" alt=\"\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/GultekinKeles.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/GultekinKeles-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/GultekinKeles-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/GultekinKeles-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/GultekinKeles-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><p id=\"caption-attachment-197013\" class=\"wp-caption-text\">Kalehan Enerji Genel M\u00fcd\u00fcr\u00fc G\u00fcltekin Kele\u015f<\/p><\/div>\n<p><strong>Kalehan Enerji Genel M\u00fcd\u00fcr\u00fc G\u00fcltekin Kele\u015f<\/strong>, devam eden karbon d\u00fczenlemeleriyle k\u00fcresel ticaretin yeniden \u015fekillenece\u011fine dikkat \u00e7ekerek,<em> \u201cAvrupa\u2019da zorunlu olan karbon azalt\u0131m\u0131 uygulamalar\u0131 \u00fclkemizde halihaz\u0131rda g\u00f6n\u00fcll\u00fcl\u00fck esas\u0131na dayan\u0131yor. Biz, d\u00fcnyadaki d\u00f6n\u00fc\u015f\u00fcme daha h\u0131zl\u0131 adapte olabilmek amac\u0131yla Yukar\u0131 Kalek\u00f6y Baraj\u0131 ve HES ile hibrit enerji santrali olan A\u015fa\u011f\u0131 Kalek\u00f6y Baraj\u0131m\u0131za ait HES ve g\u00fcne\u015f enerji santrallerimiz (GES) i\u00e7in ayr\u0131 ayr\u0131 ba\u015fvurular\u0131m\u0131z\u0131 ger\u00e7ekle\u015ftirdik. <strong>Yukar\u0131 Kalek\u00f6y Baraj\u0131 ve HES<\/strong> i\u00e7in validasyon s\u00fcrecini ba\u015far\u0131yla tamamlad\u0131k. Di\u011fer iki \u00fcretim santralimiz i\u00e7in de \u00e7ok yak\u0131nda validasyon s\u00fcre\u00e7lerimizi tamamlamay\u0131 hedefliyoruz\u201d <\/em>diye konu\u015ftu. Validasyonun ard\u0131ndan ikinci a\u015faman\u0131n verifikasyon s\u00fcreci oldu\u011funu anlatan Kele\u015f, \u015f\u00f6yle devam etti: <em>\u201cHer iki a\u015fama da ayr\u0131nt\u0131l\u0131 denetimlerin yap\u0131ld\u0131\u011f\u0131 \u00e7ok uzun bir s\u00fcre\u00e7. Bu s\u00fcre\u00e7ten ba\u015far\u0131yla \u00e7\u0131kt\u0131\u011f\u0131m\u0131z i\u00e7in \u00e7ok mutluyuz; eme\u011fi ge\u00e7en t\u00fcm \u00e7al\u0131\u015fma arkada\u015flar\u0131ma te\u015fekk\u00fcr ediyorum. May\u0131s ay\u0131nda ba\u015flataca\u011f\u0131m\u0131z verifikasyon s\u00fcrecini ise y\u0131l\u0131n son \u00e7eyre\u011finde ba\u015far\u0131yla tamamlayaca\u011f\u0131m\u0131z\u0131 d\u00fc\u015f\u00fcn\u00fcyoruz. B\u00f6ylece sera gaz\u0131 azalt\u0131m\u0131 yapan etkiye sahip temiz enerji \u00fcretimi yapt\u0131\u011f\u0131m\u0131z\u0131, karbon kredisi sertifikam\u0131zla tescillemi\u015f olaca\u011f\u0131z.\u201d<\/em><\/p>\n<h3><strong>\u00d6ZEL SEKT\u00d6R\u00dcN KURDU\u011eU EN B\u00dcY\u00dcK HES<\/strong><\/h3>\n<p>Yukar\u0131 Kalek\u00f6y Baraj\u0131 ve Hidroelektrik Santrali, Bing\u00f6l\u2019\u00fcn Solhan il\u00e7esinde, Murat Nehri \u00fczerinde yer al\u0131yor. 626,85 MW kurulu g\u00fcc\u00fcyle \u00f6zel sekt\u00f6r\u00fcn kurdu\u011fu en b\u00fcy\u00fck hidroelektrik santral olan tesis, y\u0131lda 1,5 TWh temiz elektrik \u00fcretiyor. Nisan 2018\u2019den beri faaliyetini s\u00fcren santral, y\u0131lda 835.000 tonun \u00fczerinde karbon emisyonunun \u00f6n\u00fcne ge\u00e7iyor. T\u00fcrkiye\u2019nin yenilenebilir enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcnde itici g\u00fcce sahip olan santral, yerel istihdam ve b\u00f6lgesel kalk\u0131nmaya da b\u00fcy\u00fck destek sa\u011fl\u0131yor. Yukar\u0131 Kalek\u00f6y Baraj\u0131 ve HES\u2019in Uluslararas\u0131 B\u00fcy\u00fck Barajlar Komitesi (ICOLD) ve \u0130spanya B\u00fcy\u00fck Barajlar Komitesi (SPANCOLD) taraf\u0131ndan verilen \u2018En \u0130yi Proje\u2019 dal\u0131nda birincilik \u00f6d\u00fcl\u00fc bulunuyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Kalehan Enerji, karbon sal\u0131m\u0131n\u0131n azalt\u0131lmas\u0131 konusunda \u00f6nemli bir ad\u0131m att\u0131. \u015eirketin Yukar\u0131 Kalek\u00f6y Baraj\u0131 ve Hidroelektrik Santrali (HES), International Carbon Registry (ICR) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":197015,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[23720,7935,61475,116661],"views":14,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/197010"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=197010"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/197010\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/197015"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=197010"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=197010"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=197010"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}