{"id":196787,"date":"2025-04-14T14:35:23","date_gmt":"2025-04-14T11:35:23","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=196787"},"modified":"2025-04-14T14:37:05","modified_gmt":"2025-04-14T11:37:05","slug":"diski-ges-projeleriyle-enerji-maliyetini-dusurecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/diski-ges-projeleriyle-enerji-maliyetini-dusurecek\/","title":{"rendered":"(Turkish) &#8217;D\u0130SK\u0130&#8217; GES Projeleriyle Enerji Maliyetini D\u00fc\u015f\u00fcrecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/196787\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Diyarbak\u0131r B\u00fcy\u00fck\u015fehir Belediyesi D\u0130SK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fcn\u00fcn, enerji maliyetini d\u00fc\u015f\u00fcrmek i\u00e7in Kayap\u0131nar ve E\u011fil il\u00e7elerinde kuraca\u011f\u0131 iki GES projesi onayland\u0131.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-196790\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/diski-ges-projeleriyle-enerji-maliyetini-dusurecek.jpg\" alt=\"\" width=\"500\" height=\"332\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/diski-ges-projeleriyle-enerji-maliyetini-dusurecek.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/diski-ges-projeleriyle-enerji-maliyetini-dusurecek-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/diski-ges-projeleriyle-enerji-maliyetini-dusurecek-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/diski-ges-projeleriyle-enerji-maliyetini-dusurecek-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/diski-ges-projeleriyle-enerji-maliyetini-dusurecek-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Diyarbak\u0131r Su ve Kanalizasyon \u0130daresi (D\u0130SK\u0130) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, enerji maliyetlerini d\u00fc\u015f\u00fcrmek ve \u00e7evreye duyarl\u0131 bir gelecek in\u015fa etmek amac\u0131yla Kayap\u0131nar ve E\u011fil il\u00e7elerinde iki G\u00fcne\u015f Enerjisi Santrali (GES) kuruyor. Su temini s\u00fcrecinde en b\u00fcy\u00fck gider kalemini olu\u015fturan enerji t\u00fcketimini azaltmay\u0131 hedefleyen ve D\u0130SK\u0130\u2019nin y\u0131ll\u0131k enerji t\u00fcketiminin neredeyse yar\u0131s\u0131n\u0131n g\u00fcne\u015f enerjisinden sa\u011flanmas\u0131n\u0131 ama\u00e7layan projeler, \u00e7evre dostu bir \u00fcretim modelinin olu\u015fmas\u0131na katk\u0131 sa\u011flayacak.<\/p>\n<h3><strong>Projeler Onayland\u0131<\/strong><\/h3>\n<p>Kayap\u0131nar ve E\u011fil il\u00e7elerindeki GES projeleri, TEDA\u015e Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan onayland\u0131. Onay ile birlikte D\u0130SK\u0130 ile Dicle Elektrik Da\u011f\u0131t\u0131m A.\u015e. (DEPSA\u015e) aras\u0131nda \u201cLisans\u0131z Elektrik \u00dcreticileri Da\u011f\u0131t\u0131m Sistemine Ba\u011flant\u0131 Anla\u015fmas\u0131\u201d protokol\u00fc imzaland\u0131.<\/p>\n<h3><strong>Kayap\u0131nar\u2019da \u0130n\u015fa Edilecek Proje<\/strong><\/h3>\n<p>Kayap\u0131nar il\u00e7esindeki GES projesi, 338 d\u00f6n\u00fcml\u00fck arazi \u00fczerinde in\u015fa edilecek. G\u00fcnl\u00fck 9,75 megavat elektrik \u00fcretilecek projenin y\u0131ll\u0131k \u00fcretimi ise yakla\u015f\u0131k 19 milyon 500 bin kilovatsaat olarak belirlendi.<\/p>\n<h3><strong>\u0130ki Projeden Y\u0131ll\u0131k Hedeflenen \u00dcretim<\/strong><\/h3>\n<p>E\u011fil il\u00e7esinde in\u015fa edilecek 30 megavat kapasiteli ikinci GES ise 520 d\u00f6n\u00fcml\u00fck alanda kurulacak. Tesisin y\u0131ll\u0131k \u00fcretim kapasitesi 61 milyon 86 bin kilovatsaat olarak \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>Her iki tesisin toplam y\u0131ll\u0131k \u00fcretim kapasitesinin 80 milyon 600 bin kilovatsaat olmas\u0131 hedefleniyor.<\/p>\n<h3><strong>Enerji Giderlerinde \u00d6nemli Tasarruf<\/strong><\/h3>\n<p>D\u0130SK\u0130\u2019nin y\u0131ll\u0131k toplam enerji t\u00fcketiminin yakla\u015f\u0131k y\u00fczde 46\u2019s\u0131n\u0131 kar\u015f\u0131lamas\u0131 hedeflenen GES projelerine ili\u015fkin ihale s\u00fcre\u00e7leri devam ediyor.<\/p>\n<p>Kaynak: <a href=\"https:\/\/www.diyarbakir.bel.tr\/haberler\/13793-ges.html\" target=\"_blank\" rel=\"noopener\">Diyarbak\u0131r Belediyesi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Diyarbak\u0131r B\u00fcy\u00fck\u015fehir Belediyesi D\u0130SK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fcn\u00fcn, enerji maliyetini d\u00fc\u015f\u00fcrmek i\u00e7in Kayap\u0131nar ve E\u011fil il\u00e7elerinde kuraca\u011f\u0131 iki GES projesi onayland\u0131. Diyarbak\u0131r Su ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":196790,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[20945,116593,2326,2569,116592],"views":21,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/196787"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=196787"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/196787\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/196790"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=196787"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=196787"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=196787"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}