{"id":196687,"date":"2025-04-11T10:28:35","date_gmt":"2025-04-11T07:28:35","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=196687"},"modified":"2025-04-11T10:28:56","modified_gmt":"2025-04-11T07:28:56","slug":"polat-enerji-geycek-rese-466-mwlik-hibrit-gunes-santrali-ges-kurdu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/polat-enerji-geycek-rese-466-mwlik-hibrit-gunes-santrali-ges-kurdu\/","title":{"rendered":"(Turkish) &#8217;Polat Enerji&#8217; Geycek RES&#8217;e 46,6 MW&#8217;l\u0131k Hibrit G\u00fcne\u015f Santrali (GES) Kurdu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/196687\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Polat Enerji,\u00a0K\u0131r\u015fehir\u2019in Mucur il\u00e7esinde bulunan ve 168 MW kurulu g\u00fcce sahip olan Geycek R\u00fczgar Enerji Santrali\u2019ne\u00a046,6 MW kapasiteli Hibrit G\u00fcne\u015f Enerji Santrali (GES) kurulumunu ba\u015far\u0131yla tamamlad\u0131.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-196689\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/polat-enerji-geycek-rese-466-mwlik-hibrit-gunes-santrali-ges-kurdu.jpg\" alt=\"\" width=\"500\" height=\"331\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/polat-enerji-geycek-rese-466-mwlik-hibrit-gunes-santrali-ges-kurdu.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/polat-enerji-geycek-rese-466-mwlik-hibrit-gunes-santrali-ges-kurdu-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/polat-enerji-geycek-rese-466-mwlik-hibrit-gunes-santrali-ges-kurdu-500x331.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/polat-enerji-geycek-rese-466-mwlik-hibrit-gunes-santrali-ges-kurdu-76x50.jpg 76w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p><strong>Polat Enerji<\/strong>\u2019nin T\u00fcrkiye\u2019nin en b\u00fcy\u00fck yenilenebilir santralleri aras\u0131nda yer alan Geycek R\u00fczgar Enerji Santraline yard\u0131mc\u0131 kaynak olarak <strong>46,6 MW kapasiteli Hibrit G\u00fcne\u015f Enerji Santrali<\/strong> <strong>(GES)<\/strong> kurulumu ba\u015far\u0131yla tamamland\u0131. \u0130n\u015fas\u0131 ve kurulumu <strong>SPI (Schmid Pekinta\u015f Investments) Energy Solutions<\/strong> taraf\u0131ndan ger\u00e7ekle\u015ftirilen santralin g\u00fcne\u015f panelleri ise <strong>Schmid Pekinta\u015f G\u00fcne\u015f Enerji Sistemleri San. ve Tic. A.\u015e.\u00a0<\/strong>taraf\u0131ndan temin edildi.<\/p>\n<p>Yenilenebilir enerji \u00fcretiminde s\u00fcrd\u00fcr\u00fclebilirlik, yenilik\u00e7ilik ve verimlili\u011fi \u00f6n planda tutan <strong>Polat Enerji<\/strong>,\u00a0yeni hibrit yat\u0131r\u0131m\u0131n devreye al\u0131nmas\u0131yla birlikte, K\u0131r\u015fehir Geycek Santrali\u2019nin toplam kurulu g\u00fcc\u00fc <strong>214,6 MW<\/strong>\u2019a ula\u015farak T\u00fcrkiye\u2019nin yenilenebilir enerji \u00fcretimine \u00f6nemli bir katk\u0131 sa\u011flayacak. Bu yat\u0131r\u0131m sadece kapasite art\u0131\u015f\u0131 anlam\u0131na gelmiyor; yak\u0131n zamanda devreye al\u0131nmas\u0131 planlanan Batarya Enerji Depolama Sistemleri ile santral, T\u00fcrkiye\u2019nin ilk \u015febeke \u00f6l\u00e7ekli r\u00fczgar, g\u00fcne\u015f ve depolama sistemlerini bir araya getiren entegre hibrit enerji tesisi haline gelecek. Bu entegre sistem, r\u00fczgar\u0131n tam kapasite \u00fcretim sa\u011flayamad\u0131\u011f\u0131 saatlerde g\u00fcne\u015ften al\u0131nacak destekle \u015febekeye iletilen yenilenebilir enerji miktar\u0131n\u0131 art\u0131rarak, \u00fcretimde s\u00fcreklili\u011fi ve \u015febekeye esneklik sa\u011flamak i\u00e7in kritik bir rol oynayacak.<\/p>\n<p>Yenilenebilir enerji sekt\u00f6r\u00fcn\u00fcn \u00f6nc\u00fc ve referans yat\u0131r\u0131mc\u0131lar\u0131ndan Polat Enerji, yenilik\u00e7i teknolojilerle entegre enerji \u00e7\u00f6z\u00fcmleri geli\u015ftirmeye devam ediyor. Ayr\u0131ca, yurt i\u00e7i ve yurt d\u0131\u015f\u0131ndaki yenilenebilir enerji yat\u0131r\u0131mlar\u0131yla yaln\u0131zca T\u00fcrkiye\u2019nin de\u011fil, b\u00f6lgenin de s\u00fcrd\u00fcr\u00fclebilir enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcne \u00f6nc\u00fcl\u00fck ediyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Polat Enerji,\u00a0K\u0131r\u015fehir\u2019in Mucur il\u00e7esinde bulunan ve 168 MW kurulu g\u00fcce sahip olan Geycek R\u00fczgar Enerji Santrali\u2019ne\u00a046,6 MW kapasiteli Hibrit G\u00fcne\u015f Enerji Santrali [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":196689,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[79640,24998,2326,14938,227,2569,105989,2192,4487,69],"views":31,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/196687"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=196687"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/196687\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/196689"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=196687"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=196687"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=196687"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}