{"id":196486,"date":"2025-04-07T12:52:15","date_gmt":"2025-04-07T09:52:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=196486"},"modified":"2025-04-07T12:52:15","modified_gmt":"2025-04-07T09:52:15","slug":"karakaya-heste-dev-rehabilitasyon","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/karakaya-heste-dev-rehabilitasyon\/","title":{"rendered":"(Turkish) Karakaya HES&#8217;te Dev Rehabilitasyon"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/196486\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>T\u00fcrkiye\u2019nin en b\u00fcy\u00fck ikinci hidroelektrik santrali olan Karakaya Baraj\u0131, dev bir rehabilitasyona sahne oluyor. Baraj\u0131n birinci \u00fcnitesinin 85 tonluk t\u00fcrbin \u00e7ark\u0131, 40 y\u0131l sonra yenilendi.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-196489\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/karakaya-heste-dev-rehabilitasyon.jpg\" alt=\"\" width=\"500\" height=\"329\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/karakaya-heste-dev-rehabilitasyon.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/karakaya-heste-dev-rehabilitasyon-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/karakaya-heste-dev-rehabilitasyon-500x329.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/04\/karakaya-heste-dev-rehabilitasyon-76x50.jpg 76w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Mart ay\u0131 i\u00e7inde ba\u015far\u0131yla \u00e7al\u0131\u015farak elektrik \u00fcretimine ba\u015flayan t\u00fcrbin, 310 MW g\u00fc\u00e7 ve y\u00fczde 95 verimlilik oran\u0131na ula\u015ft\u0131. Sadece bu rehabilitasyon sayesinde her y\u0131l 12 bin ailenin elektrik ihtiyac\u0131 kar\u015f\u0131lanacak kadar ilave elektrik \u00fcretecek.<\/p>\n<h3><strong>Karde\u015f Kurulu\u015flar\u0131n \u0130\u015f Birli\u011fi<\/strong><\/h3>\n<p>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019n\u0131n ilgili iki kurulu\u015fu olan Elektrik \u00dcretim A.\u015e. (E\u00dcA\u015e) ile T\u00fcrkiye Elektromekanik A.\u015e.\u2019nin (TEMSAN) i\u015f birli\u011fi sonucunda yerli ve milli imkanlarla t\u00fcrbin \u00e7ark\u0131 geli\u015ftirildi. T\u00fcrbin \u00e7ark\u0131; tasar\u0131m, tasar\u0131m do\u011frulama, model test s\u00fcre\u00e7leri, demontaj, montaj ve test i\u015flemlerinden ge\u00e7ti.<\/p>\n<h3><strong>Elektrik \u00dcretimi Ba\u015flad\u0131<\/strong><\/h3>\n<p>1800 MW kurulu g\u00fcce sahip olan ve E\u00dcA\u015e taraf\u0131ndan i\u015fletilen Karakaya HES\u2019in birinci \u00fcnitesine yerle\u015ftirilen t\u00fcrbin \u00e7ark\u0131, 14 Mart 2025 tarihi itibar\u0131yla enterkonnekte sisteme ba\u011flanarak elektrik \u00fcretimine ba\u015flad\u0131.<\/p>\n<h3><strong>Y\u00fczde 4 Daha Verimli<\/strong><\/h3>\n<p>Modernizasyon ve bak\u0131m faaliyetleri sonucunda, yeniden enerji \u00fcreten birinci \u00fcnitede g\u00fc\u00e7 ve verimlilik \u00f6l\u00e7\u00fcmleri yap\u0131ld\u0131. Buna g\u00f6re; yenilenen t\u00fcrbin \u00e7ark\u0131 310 MW g\u00fc\u00e7, y\u00fczde 95 \u00fczerinde verimlilik de\u011ferlerine ula\u015ft\u0131. Eski t\u00fcrbinde y\u00fczde 91 olan verimlilik, b\u00f6ylece en az 4 puan artm\u0131\u015f oldu. Birinci \u00fcnitedeki bu verim art\u0131\u015f\u0131 ile y\u0131ll\u0131k 85 milyon liral\u0131k art\u0131 de\u011fer ortaya \u00e7\u0131kacak. Y\u0131ll\u0131k \u00fcretim art\u0131\u015f\u0131, 34 GWh olacak. Sadece bu yenileme sayesinde her y\u0131l 12 bin ailenin elektrik ihtiyac\u0131 kar\u015f\u0131lanacak kadar ilave elektrik \u00fcretecek.<\/p>\n<h3><strong>2028\u2019de Tamamlanacak<\/strong><\/h3>\n<p>Karakaya HES\u2019te t\u00fcrbin rehabilitasyon i\u015flemleri di\u011fer \u00fcnitelerde de devam ediyor. Yenileme i\u015flemlerinin 2028\u2019de tamamlanmas\u0131 planlan\u0131yor. T\u00fcm \u00fcniteler yenilendi\u011finde Karakaya HES, her y\u0131l ilave olarak 510 milyon liral\u0131k art\u0131 de\u011fer \u00fcretecek. 70 bin aile daha y\u0131ll\u0131k elektri\u011fini bu yenileme ile sa\u011flayacak.<\/p>\n<h3><strong>Karakaya HES Kimlik Kart\u0131<\/strong><\/h3>\n<p>\u2022 Yap\u0131m Y\u0131l\u0131: 1987<\/p>\n<p>\u2022\u200b Kurulu G\u00fc\u00e7: 1800 MW<\/p>\n<p>\u2022\u200b T\u00fcrbin Tipi: D\u00fc\u015fey Francis<\/p>\n<p>\u2022\u200b \u00dcnite Say\u0131s\u0131: 6 Adet<\/p>\n<p>\u2022\u200b Y\u00fckseklik: 173 metre<\/p>\n<p>\u2022\u200b Havza: F\u0131rat<\/p>\n<p>\u2022\u200b Su Kapasitesi: 9242 m3<\/p>\n<p>Kaynak: <a href=\"https:\/\/enerji.gov.tr\/haber-detay?id=21474\" target=\"_blank\" rel=\"noopener\">ETKB<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin en b\u00fcy\u00fck ikinci hidroelektrik santrali olan Karakaya Baraj\u0131, dev bir rehabilitasyona sahne oluyor. Baraj\u0131n birinci \u00fcnitesinin 85 tonluk t\u00fcrbin \u00e7ark\u0131, 40 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":196489,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[69393,1033,34926,1090,111649,6408,21916,116482],"views":26,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/196486"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=196486"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/196486\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/196489"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=196486"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=196486"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=196486"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}