{"id":19645,"date":"2013-12-20T10:55:43","date_gmt":"2013-12-20T07:55:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=19645"},"modified":"2013-12-20T10:55:43","modified_gmt":"2013-12-20T07:55:43","slug":"akkuyu-yerli-ve-yabancilara-yuzde-40-is-firsati-sagliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-yerli-ve-yabancilara-yuzde-40-is-firsati-sagliyor\/","title":{"rendered":"(Turkish) Akkuyu, Yerli ve Yabanc\u0131lara Y\u00fczde 40 \u0130\u015f F\u0131rsat\u0131 Sa\u011fl\u0131yor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/19645\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Akkuyu NGS A\u015e. Teknik ve Lisanslama Ba\u015f Koordinat\u00f6r\u00fc Dimitriy Pokidysev, Akkuyu Porjesi hakk\u0131nda genel bilgiler vererek, yabanc\u0131 ve T\u00fcrk kat\u0131l\u0131mc\u0131lara y\u00fczde 40 oran\u0131nda bir f\u0131rsat sa\u011flayan proje oldu\u011funu ifade etti.<\/strong><\/p>\n<p><strong>\u201cMAL\u0130YET\u0130N Y\u00dcZDE 36\u2019SI EK\u0130PMAN, Y\u00dcZDE 43\u2019\u00dc \u0130N\u015eAAT MAL\u0130YET\u0130\u201d<\/strong><\/p>\n<p>Pokidysev, sermaye maliyetinin y\u00fczde 36\u2019s\u0131n\u0131n ekipman, y\u00fczde 43\u2019\u00fcn\u00fcn ise in\u015faat maliyetinden olu\u015ftu\u011funa dik<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz.png\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-9539\" title=\"akkuyu-n\u00fckleer-santrali\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz-300x185.png\" alt=\"\" width=\"300\" height=\"185\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz-300x185.png 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz-80x50.png 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz.png 481w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>kati \u00e7ekerek, &#8220;Y\u00fczde 40\u2019\u0131 T\u00fcrkiye\u2019de in\u015fa edilip montaj\u0131 yap\u0131labilecek ekipmand\u0131r. Ayr\u0131ca in\u015faat i\u015fleri de T\u00fcrkiye\u2019de yap\u0131lacak. Ekipman ise hem yerli hem yabanc\u0131 kaynakl\u0131 olabilir&#8221; diye konu\u015ftu.<\/p>\n<p><strong>\u0130VANOV: ALIMLARIN Y\u00dcZDE 90\u2019I A\u00c7IK \u0130HALE Y\u00d6NTEM\u0130 \u0130LE YAPILACAK<\/strong><\/p>\n<p>JSC Atomstroyexport Sat\u0131n Alma ve S\u00f6zle\u015fme B\u00f6l\u00fcm\u00fc M\u00fcd\u00fcr\u00fc Dimitriy \u0130vanov ise Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali Projesinde al\u0131mlar\u0131n y\u00fczde 90\u2019\u0131n\u0131 a\u00e7\u0131k ihale y\u00f6ntemiyle yap\u0131laca\u011f\u0131na dikkati \u00e7ekerek, ihaleyi kazanan kurulu\u015fla Rusya Federasyonu kapsam\u0131nda s\u00f6zle\u015fme imzalanaca\u011f\u0131n\u0131 bildirdi.<\/p>\n<p>Rekabet\u00e7i g\u00f6r\u00fc\u015fmelerin, bili\u015fim hizmeti sat\u0131n al\u0131nacaksa, deney yap\u0131lacaksa veya Ar-Ge yap\u0131lacaksa burada \u00e7al\u0131\u015fman\u0131n vasf\u0131n\u0131 belirlemenin g\u00fc\u00e7 olaca\u011f\u0131n\u0131 belirterek, al\u0131m s\u00fcrecinde g\u00f6r\u00fc\u015fme y\u00f6nteminin de uygulanabilece\u011fini s\u00f6yledi.<\/p>\n<p>\u0130vanov, ihalede tek bir ba\u015fvuru olmas\u0131 halinde bu tek tedarik\u00e7iyle anla\u015fma imzalayabileceklerini s\u00f6zlerine ekledi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/akkuyu-yerli-ve-yabancilara-yuzde-40-is-firsati-sa_6204.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Akkuyu NGS A\u015e. Teknik ve Lisanslama Ba\u015f Koordinat\u00f6r\u00fc Dimitriy Pokidysev, Akkuyu Porjesi hakk\u0131nda genel bilgiler vererek, yabanc\u0131 ve T\u00fcrk kat\u0131l\u0131mc\u0131lara y\u00fczde 40 oran\u0131nda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9539,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,11438,1303,11440,11439,63,67,1009,165,71,21,88],"views":499,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19645"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=19645"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19645\/revisions"}],"predecessor-version":[{"id":19647,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19645\/revisions\/19647"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9539"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=19645"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=19645"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=19645"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}