{"id":196375,"date":"2025-03-26T14:55:45","date_gmt":"2025-03-26T11:55:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=196375"},"modified":"2025-03-26T14:56:54","modified_gmt":"2025-03-26T11:56:54","slug":"depolamali-elektrikte-331-gigavat-kurulu-guc-icin-on-lisans-verildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/depolamali-elektrikte-331-gigavat-kurulu-guc-icin-on-lisans-verildi\/","title":{"rendered":"(Turkish) Depolamal\u0131 Elektrikte 33,1 Gigavat Kurulu G\u00fc\u00e7 \u0130\u00e7in \u00d6n Lisans Verildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/196375\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) taraf\u0131ndan depolamal\u0131 elektrik \u00fcretim tesisi kurulmas\u0131na y\u00f6nelik \u015fu ana kadar 676 projeye toplam 33,1 gigavat kurulu g\u00fc\u00e7 i\u00e7in \u00f6n lisans verildi.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-196377\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/depolamali-elektrikte-331-gigavat-kurulu-guc-icin-on-lisans-verildi.jpg\" alt=\"\" width=\"500\" height=\"345\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/depolamali-elektrikte-331-gigavat-kurulu-guc-icin-on-lisans-verildi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/depolamali-elektrikte-331-gigavat-kurulu-guc-icin-on-lisans-verildi-300x207.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/depolamali-elektrikte-331-gigavat-kurulu-guc-icin-on-lisans-verildi-500x345.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/depolamali-elektrikte-331-gigavat-kurulu-guc-icin-on-lisans-verildi-73x50.jpg 73w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Depolamal\u0131 elektrik \u00fcretim yat\u0131r\u0131mlar\u0131, <strong>19 Kas\u0131m 2022<\/strong> tarihli Resmi Gazete&#8217;de yay\u0131mlanan ikincil mevzuat de\u011fi\u015fikliklerinin ard\u0131ndan h\u0131z kazand\u0131. Bu d\u00fczenlemeyle, elektrik depolama tesisi kurmay\u0131 taahh\u00fct eden yat\u0131r\u0131mc\u0131lar, depolama kapasitesi kadar r\u00fczgar ve g\u00fcne\u015f enerjisi santrali kurmak \u00fczere T\u00fcrkiye Elektrik \u0130letim A\u015e taraf\u0131ndan yar\u0131\u015fma yap\u0131lmaks\u0131z\u0131n EPDK&#8217;ye do\u011frudan \u00f6n lisans ba\u015fvurusunda bulunabiliyor.<\/p>\n<p>EPDK&#8217;dan edinilen bilgiye g\u00f6re, depolamal\u0131 elektrik yat\u0131r\u0131m\u0131na y\u00f6nelik ba\u015fvurular do\u011frultusunda bug\u00fcne kadar \u00f6n lisans verilen projelerin toplam kurulu g\u00fcc\u00fc 33,1 gigavata ula\u015ft\u0131. \u00d6n lisans verilen projelerin 263&#8217;\u00fc r\u00fczgar enerjisi santrali (RES), 413&#8217;\u00fc ise g\u00fcne\u015f enerjisi santrali (GES) projelerinden olu\u015fuyor. RES i\u00e7in \u00f6n lisans verilen kurulu g\u00fc\u00e7 18,4 gigavat, GES i\u00e7in ise 14,7 gigavat olarak belirlendi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) taraf\u0131ndan depolamal\u0131 elektrik \u00fcretim tesisi kurulmas\u0131na y\u00f6nelik \u015fu ana kadar 676 projeye toplam 33,1 gigavat kurulu g\u00fc\u00e7 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":196377,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[106387,116451,44584,750,45418,19791,116452,60828,3479],"views":44,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/196375"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=196375"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/196375\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/196377"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=196375"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=196375"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=196375"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}