{"id":196318,"date":"2025-03-26T11:28:09","date_gmt":"2025-03-26T08:28:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=196318"},"modified":"2025-03-26T11:28:09","modified_gmt":"2025-03-26T08:28:09","slug":"sa-ra-sirketler-grubu-adanada-gunes-enerjisi-yatirimi-gerceklestirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sa-ra-sirketler-grubu-adanada-gunes-enerjisi-yatirimi-gerceklestirdi\/","title":{"rendered":"(Turkish) &#8217;\u015eA-RA \u015eirketler Grubu&#8217; Adana&#8217;da G\u00fcne\u015f Enerjisi Yat\u0131r\u0131m\u0131 Ger\u00e7ekle\u015ftirdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/196318\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>\u015eA-RA \u015eirketler Grubu, GES (G\u00fcne\u015f Enerjisi Santrali) yat\u0131r\u0131mlar\u0131 kapsam\u0131nda, Adana&#8217;daki \u00fcretim kamp\u00fcs\u00fcnde bulunan fabrikalar\u0131n\u0131n \u00e7at\u0131lar\u0131na g\u00fcne\u015f enerji panelleri kurulumu ger\u00e7ekle\u015ftirdi.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-196320\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/sa-ra-sirketler-grubu-adanada-gunes-enerjisi-yatirimi-gerceklestirdi.jpg\" alt=\"\" width=\"500\" height=\"352\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/sa-ra-sirketler-grubu-adanada-gunes-enerjisi-yatirimi-gerceklestirdi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/sa-ra-sirketler-grubu-adanada-gunes-enerjisi-yatirimi-gerceklestirdi-300x211.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/sa-ra-sirketler-grubu-adanada-gunes-enerjisi-yatirimi-gerceklestirdi-500x352.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/sa-ra-sirketler-grubu-adanada-gunes-enerjisi-yatirimi-gerceklestirdi-71x50.jpg 71w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Enerjiden in\u015faata, turizmden end\u00fcstriye kadar bir\u00e7ok sekt\u00f6rde faaliyet g\u00f6steren \u015eA-RA \u015eirketler Grubu, Adana&#8217;daki \u00fcretim tesislerinde \u00f6nemli bir yenilenebilir enerji hamlesi yapt\u0131. GES yat\u0131r\u0131mlar\u0131 kapsam\u0131nda fabrikalar\u0131n\u0131n \u00e7at\u0131lar\u0131na g\u00fcne\u015f enerji panelleri kurulumu ger\u00e7ekle\u015ftiren grup hem enerji maliyetlerini d\u00fc\u015f\u00fcrmeyi hem de \u00e7evresel etkisini azaltmay\u0131 hedefliyor.<\/p>\n<h3><strong>Fabrika \u00c7at\u0131lar\u0131 G\u00fcne\u015f Enerjisiyle \u00dcretime Kat\u0131l\u0131yor<\/strong><\/h3>\n<p>\u00dcretim kamp\u00fcs\u00fcnde yer alan be\u015f fabrikan\u0131n \u00e7at\u0131s\u0131na kurulan GES, toplamda 43.166 metrekarelik bir alan\u0131 kapl\u0131yor. 7.5 MW (7500 kWe) kurulu g\u00fcce sahip bu sistem, fabrikalar\u0131n elektrik ihtiyac\u0131n\u0131n \u00f6nemli bir b\u00f6l\u00fcm\u00fcn\u00fc (%45 ila %50) kar\u015f\u0131layarak, enerji maliyetlerinde de d\u00fc\u015f\u00fc\u015f sa\u011fl\u0131yor.<\/p>\n<h3><strong>Stratejik Yat\u0131r\u0131m, H\u0131zl\u0131 Geri D\u00f6n\u00fc\u015f<\/strong><\/h3>\n<p>Projenin, 2.5 y\u0131l gibi k\u0131sa bir s\u00fcrede kendini amorti etmesi \u00f6ng\u00f6r\u00fcl\u00fcyor. Y\u0131ll\u0131k 7500 kWe elektrik \u00fcretimi hedefiyle, \u00fcretilen fazla enerjinin \u015febekeye aktar\u0131lmas\u0131 da planlan\u0131yor.<\/p>\n<p>\u015eA-RA \u015eirketler Grubu, bu projeyle s\u0131n\u0131rl\u0131 kalmay\u0131p, g\u00fcne\u015f enerjisi yat\u0131r\u0131mlar\u0131n\u0131 art\u0131rmay\u0131 planl\u0131yor. Grubun k\u0131sa vadeli hedefi, 3 y\u0131l i\u00e7inde yap\u0131lacak kapasite art\u0131r\u0131m\u0131yla fabrikalar\u0131n t\u00fcm elektrik ihtiyac\u0131n\u0131 g\u00fcne\u015f enerjisinden kar\u015f\u0131lamak. Uzun vadede ise 5 y\u0131l i\u00e7inde 30.000 kWe GES yat\u0131r\u0131m seviyesine ula\u015f\u0131lmas\u0131 hedefleniyor. Bu hedeflere ula\u015fmak i\u00e7in 3 MW&#8217;l\u0131k ek bir GES projesi \u00fczerinde \u00e7al\u0131\u015fmalar devam ediyor.<\/p>\n<h3><strong>\u00c7evresel Etki ve Sorumluluk<\/strong><\/h3>\n<p>Bu yat\u0131r\u0131m\u0131n en \u00f6nemli unsurlar\u0131ndan biri de \u00e7evresel faydas\u0131. Proje sayesinde y\u0131ll\u0131k 3585 kilogram karbon sal\u0131n\u0131m\u0131n\u0131n \u00f6n\u00fcne ge\u00e7ilerek, daha temiz bir \u00fcretim s\u00fcreci hedefleniyor. \u015eA-RA, bu projeyle karbon ayak izini azaltma ve temiz enerji kullan\u0131m\u0131n\u0131 art\u0131rma konusundaki kararl\u0131l\u0131\u011f\u0131n\u0131 g\u00f6steriyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u015eA-RA \u015eirketler Grubu, GES (G\u00fcne\u015f Enerjisi Santrali) yat\u0131r\u0131mlar\u0131 kapsam\u0131nda, Adana&#8217;daki \u00fcretim kamp\u00fcs\u00fcnde bulunan fabrikalar\u0131n\u0131n \u00e7at\u0131lar\u0131na g\u00fcne\u015f enerji panelleri kurulumu ger\u00e7ekle\u015ftirdi. Enerjiden in\u015faata, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":196320,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[3272,116428,24571,116427],"views":18,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/196318"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=196318"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/196318\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/196320"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=196318"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=196318"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=196318"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}