{"id":196314,"date":"2025-03-26T10:55:38","date_gmt":"2025-03-26T07:55:38","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=196314"},"modified":"2025-03-26T10:55:38","modified_gmt":"2025-03-26T07:55:38","slug":"462-mwlik-ruzgar-enerji-santrali-icin-6-9-milyon-dolarlik-imza-atildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/462-mwlik-ruzgar-enerji-santrali-icin-6-9-milyon-dolarlik-imza-atildi\/","title":{"rendered":"(Turkish) 46,2 MW&#8217;l\u0131k R\u00fczgar Enerji Santrali \u0130\u00e7in 6.9 Milyon Dolarl\u0131k \u0130mza At\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/196314\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>YEO Teknoloji, Enerjisa Enerji \u00dcretim A.\u015e. ile imzalad\u0131\u011f\u0131 toplamda 6.9 Milyon Amerikan Dolar\u0131 b\u00fcy\u00fckl\u00fc\u011f\u00fcndeki yeni s\u00f6zle\u015fmeler kapsam\u0131nda Ayd\u0131n\u2019da kurulacak 46,2 MW g\u00fcc\u00fcndeki Damp\u0131nar R\u00fczgar Enerji Santrali\u2019nin elektrifikasyon, otomasyon ve enerji iletim hatt\u0131 i\u015flerini ger\u00e7ekle\u015ftirecek. Toplam 6.9 milyon dolarl\u0131k iki s\u00f6zle\u015fme ile birlikte santral, y\u0131lda 119,9 bin ton karbon sal\u0131m\u0131n\u0131 engelleyecek.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-196316\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/462-mwlik-ruzgar-enerji-santrali-icin-6-9-milyon-dolarlik-imza-atildi.jpg\" alt=\"\" width=\"500\" height=\"376\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/462-mwlik-ruzgar-enerji-santrali-icin-6-9-milyon-dolarlik-imza-atildi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/462-mwlik-ruzgar-enerji-santrali-icin-6-9-milyon-dolarlik-imza-atildi-300x226.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/462-mwlik-ruzgar-enerji-santrali-icin-6-9-milyon-dolarlik-imza-atildi-500x376.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/462-mwlik-ruzgar-enerji-santrali-icin-6-9-milyon-dolarlik-imza-atildi-66x50.jpg 66w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Yenilenebilir enerji ve m\u00fchendislik alan\u0131nda k\u00fcresel oyuncularla g\u00fc\u00e7l\u00fc i\u015f birlikleri ger\u00e7ekle\u015ftiren YEO Teknoloji, T\u00fcrkiye\u2019de Enerjisa Enerji \u00dcretim A.\u015e.\u2019nin r\u00fczgar enerjisi santrali yat\u0131r\u0131mlar\u0131ndaki en \u00f6nemli i\u015f ortaklar\u0131ndan biri olma konumunu g\u00fc\u00e7lendiriyor. YEO Teknoloji, Enerjisa\u2019n\u0131n 11 t\u00fcrbinden olu\u015facak 46,2 MW g\u00fcc\u00fcndeki Ayd\u0131n Damp\u0131nar R\u00fczgar Enerji Santrali yat\u0131r\u0131m\u0131n\u0131n elektrifikasyon, otomasyon ve enerji iletim hatt\u0131 i\u015flerini \u00fcstlendi\u011fini a\u00e7\u0131klad\u0131. Toplam 6,9 milyon dolar de\u011ferindeki iki ayr\u0131 s\u00f6zle\u015fmeyle birlikte in\u015fa edilecek santral, y\u0131lda 119.898 tonluk karbon sal\u0131m\u0131n\u0131 engelleyecek.<\/p>\n<p>Enerjisa ile ger\u00e7ekle\u015ftirilen anla\u015fma, YEO Teknoloji\u2019nin r\u00fczgar enerjisi projelerindeki uzmanl\u0131\u011f\u0131n\u0131 ve m\u00fchendislik g\u00fcc\u00fcn\u00fc bir kez daha kan\u0131tlad\u0131. YEO Teknoloji, elektrifikasyon, otomasyon, enerji iletim hatt\u0131 tasar\u0131m\u0131, m\u00fchendislik, tedarik, montaj, test ve devreye alma s\u00fcre\u00e7lerinin tamam\u0131n\u0131 \u00fcstlenerek projeye u\u00e7tan uca \u00e7\u00f6z\u00fcm sa\u011flay\u0131c\u0131 olarak katk\u0131 sunacak.<\/p>\n<p><strong>YEO Teknoloji CEO\u2019su Tolunay Y\u0131ld\u0131z<\/strong>, i\u015f birli\u011fiyle \u015f\u00f6yle konu\u015ftu: <em>\u201cT\u00fcrkiye\u2019nin yenilenebilir enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcne m\u00fchendislik g\u00fcc\u00fcm\u00fczle katk\u0131 sa\u011flamaya devam ediyoruz. Enerjisa\u2019n\u0131n r\u00fczgar projelerindeki en b\u00fcy\u00fck i\u015f ortaklar\u0131ndan biri olmaktan mutluluk duyuyoruz. Hedefimiz, yenilenebilir enerji alan\u0131ndaki uzmanl\u0131\u011f\u0131m\u0131z\u0131 T\u00fcrkiye ve k\u00fcresel pazarlarda yeni projelerle s\u00fcrd\u00fcrmek.\u201d<\/em><\/p>\n<p>Geli\u015fmi\u015f enerji depolama \u00e7\u00f6z\u00fcmlerinden, elektrik \u015febekelerine, y\u00fcksek gerilim trafo merkezleri, yenilenebilir enerji santralleri, end\u00fcstriyel tesislerin enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcnden hidrojene kadar farkl\u0131 alanlarda projeler y\u00fcr\u00fcten YEO Teknoloji, 3 k\u0131tada ve 30\u2019dan fazla \u00fclkede 400\u2019den fazla proje tamamlad\u0131. YEO Teknoloji, dekarbonizasyon, desantralizasyon ve dijitalizasyon odakl\u0131 \u00e7al\u0131\u015fmalar\u0131yla daha ya\u015fanabilir bir d\u00fcnya i\u00e7in \u2018Bizce m\u00fcmk\u00fcn\u2019 slogan\u0131yla b\u00fcy\u00fcmeye devam ediyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. YEO Teknoloji, Enerjisa Enerji \u00dcretim A.\u015e. ile imzalad\u0131\u011f\u0131 toplamda 6.9 Milyon Amerikan Dolar\u0131 b\u00fcy\u00fckl\u00fc\u011f\u00fcndeki yeni s\u00f6zle\u015fmeler kapsam\u0131nda Ayd\u0131n\u2019da kurulacak 46,2 MW g\u00fcc\u00fcndeki [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":196316,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[116426,474,231,96708],"views":21,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/196314"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=196314"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/196314\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/196316"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=196314"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=196314"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=196314"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}