{"id":196207,"date":"2025-03-21T13:49:51","date_gmt":"2025-03-21T10:49:51","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=196207"},"modified":"2025-03-21T13:49:51","modified_gmt":"2025-03-21T10:49:51","slug":"akkuyu-ngsdeki-calismalar-tum-hiziyla-suruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngsdeki-calismalar-tum-hiziyla-suruyor\/","title":{"rendered":"(Turkish) Akkuyu NGS&#8217;deki \u00c7al\u0131\u015fmalar T\u00fcm H\u0131z\u0131yla S\u00fcr\u00fcyor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/196207\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu Rosatom taraf\u0131ndan in\u015fa edilen Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 2\u2019nci G\u00fc\u00e7 \u00dcnitesi\u2019nin makine dairesinde 350 ton kapasiteli k\u00f6pr\u00fcl\u00fc vin\u00e7 devreye al\u0131nd\u0131. Vin\u00e7, t\u00fcrbin binas\u0131nda hem in\u015faat ve montaj i\u015fleri a\u015famas\u0131nda hem de n\u00fckleer g\u00fc\u00e7 santralin i\u015fletimi s\u0131ras\u0131nda kald\u0131rma, ta\u015f\u0131ma ve y\u00fckleme-bo\u015faltma i\u015flemlerini ger\u00e7ekle\u015ftirmek i\u00e7in kullan\u0131lacak.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-196209\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/akkuyu-ngsdeki-calismalar-tum-hiziyla-suruyor-1.jpg\" alt=\"\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/akkuyu-ngsdeki-calismalar-tum-hiziyla-suruyor-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/akkuyu-ngsdeki-calismalar-tum-hiziyla-suruyor-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/akkuyu-ngsdeki-calismalar-tum-hiziyla-suruyor-1-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/akkuyu-ngsdeki-calismalar-tum-hiziyla-suruyor-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/akkuyu-ngsdeki-calismalar-tum-hiziyla-suruyor-1-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Vincin kiri\u015flerinin yerine yerle\u015ftirilmesi ile ba\u015flayan s\u00fcre\u00e7te uzmanlar birka\u00e7 ay boyunca elektrik devrelerini, i\u00e7 mekanizmalar\u0131n kontrol ve izleme devrelerini ile vincin g\u00fcvenli bir \u015fekilde \u00e7al\u0131\u015fmas\u0131ndan sorumlu ekipman\u0131 ayarlad\u0131lar.\u00a0Sonras\u0131nda vince maksimum y\u00fck \u00e7al\u0131\u015fmas\u0131 da dahil olmak \u00fczere statik ve dinamik testler uyguland\u0131. Kontrol i\u015flemlerinin sonu\u00e7lar\u0131na dayanarak, uzmanlardan olu\u015fan komisyon ekipman\u0131 kabul edip vincin \u00e7al\u0131\u015fmaya haz\u0131r oldu\u011funu onaylad\u0131.<\/p>\n<p><strong>AKKUYU N\u00dcKLEER A.\u015e. Genel M\u00fcd\u00fcr\u00fc Sergei Butckikh<\/strong>, konuyla ilgili olarak, \u201c<em>Makine dairesindeki k\u00f6pr\u00fcl\u00fc vincin hizmet \u00f6mr\u00fc, g\u00fc\u00e7 \u00fcnitesinin t\u00fcm ya\u015fam d\u00f6ng\u00fcs\u00fc i\u00e7in tasarland\u0131. K\u00f6pr\u00fcl\u00fc vin\u00e7, t\u00fcrbin jenerat\u00f6r\u00fcn\u00fc ve di\u011fer a\u011f\u0131r ekipmanlar\u0131 kurmak i\u00e7in kullan\u0131lacak. T\u00fcm bu ekipmanlar halihaz\u0131rda sahada bulunuyor ve gerekli haz\u0131rl\u0131klar\u0131n ard\u0131ndan a\u015famal\u0131 kurulumlar\u0131na ge\u00e7ece\u011fiz\u201d<\/em><em>\u00a0<\/em>ifadelerini kulland\u0131.<\/p>\n<p>Akkuyu NGS\u2019nin g\u00fc\u00e7 \u00fcnitelerinin makine dairelerinde farkl\u0131 seviyelerde \u00fc\u00e7 k\u00f6pr\u00fcl\u00fc vin\u00e7 kuruluyor. Bu vin\u00e7lerin her biri\u00a0y\u00fcksek teknolojili bir kontrol sistemi ile birle\u015ftirilecek. Bu sistem, t\u00fcm operasyonel senaryolarda vin\u00e7ler, kanca ask\u0131lar\u0131 veya halatlar aras\u0131nda \u00e7arp\u0131\u015fma olas\u0131l\u0131\u011f\u0131n\u0131 ortadan kald\u0131racak.\u00a0\u00dcst k\u0131s\u0131mda\u00a0350 ton kald\u0131rma kapasitesine sahip ana k\u00f6pr\u00fcl\u00fc vin\u00e7 yer al\u0131rken alt k\u0131s\u0131mda ise\u00a030 ve 15 ton kald\u0131rma kapasiteli iki geni\u015f a\u00e7\u0131kl\u0131kl\u0131 k\u00f6pr\u00fcl\u00fc vin\u00e7 daha bulunuyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu Rosatom taraf\u0131ndan in\u015fa edilen Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 2\u2019nci G\u00fc\u00e7 \u00dcnitesi\u2019nin makine dairesinde 350 ton kapasiteli [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":196210,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[116399,3019,20867,116400,2973],"views":14,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/196207"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=196207"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/196207\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/196210"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=196207"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=196207"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=196207"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}