{"id":196140,"date":"2025-03-17T14:37:19","date_gmt":"2025-03-17T11:37:19","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=196140"},"modified":"2025-03-17T14:38:06","modified_gmt":"2025-03-17T11:38:06","slug":"astor-enerji-romanyada-350-mwlik-ges-projesi-gelistirecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/astor-enerji-romanyada-350-mwlik-ges-projesi-gelistirecek\/","title":{"rendered":"(Turkish) &#8217;Astor Enerji&#8217; Romanya\u2019da 350 MW&#8217;l\u0131k GES Projesi Geli\u015ftirecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/196140\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Astor Enerji&#8217;den Romanya&#8217;da yapaca\u011f\u0131 enerji yat\u0131r\u0131m\u0131na y\u00f6nelik a\u00e7\u0131klama geldi. GES projesine y\u00f6nelik \u00fc\u00e7 ayr\u0131 s\u00f6zle\u015fme imzaland\u0131.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-196143\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/astor-enerji-romanyada-350-mwlik-ges-projesi-gelistirecek.jpg\" alt=\"\" width=\"500\" height=\"356\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/astor-enerji-romanyada-350-mwlik-ges-projesi-gelistirecek.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/astor-enerji-romanyada-350-mwlik-ges-projesi-gelistirecek-300x214.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/astor-enerji-romanyada-350-mwlik-ges-projesi-gelistirecek-500x356.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/astor-enerji-romanyada-350-mwlik-ges-projesi-gelistirecek-70x50.jpg 70w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Astor Enerji, (ASTOR) Kamuyu Ayd\u0131nlatma Platformu\u2019na (KAP) g\u00fcne\u015f enerjisi santrali projesi konulu bir bildirim g\u00f6nderdi. Yurt d\u0131\u015f\u0131nda yenilenebilir enerji yat\u0131r\u0131mlar\u0131 ger\u00e7ekle\u015ftirebilmek \u00fczere \u00e7al\u0131\u015fmalar\u0131n s\u00fcrd\u00fc\u011f\u00fc ifade edildi.<\/p>\n<p>KAP a\u00e7\u0131klamas\u0131nda, <em>\u201cYurt d\u0131\u015f\u0131nda s\u00fcrd\u00fcr\u00fclen proje geli\u015ftirme faaliyetleri kapsam\u0131nda Romanya\u2019da yerle\u015fik bir proje geli\u015ftirme firmas\u0131 ile toplamda 350 MW kapasiteli g\u00fcne\u015f enerji santrali geli\u015ftirebilmek, teknik ba\u011flant\u0131 onay\u0131 \u2013 ATR\/yap\u0131 ruhsat\u0131\/ba\u011flant\u0131 anla\u015fmas\u0131n\u0131 almak i\u00e7in \u00fc\u00e7 ayr\u0131 s\u00f6zle\u015fme imzalanm\u0131\u015f, enerji yat\u0131r\u0131mlar\u0131 konusunda \u00f6nemli bir ad\u0131m at\u0131lm\u0131\u015ft\u0131r,\u201d<\/em> ifadeleri kullan\u0131ld\u0131.<\/p>\n<p>Astor Enerji taraf\u0131ndan yurt d\u0131\u015f\u0131ndaki yenilenebilir enerji yat\u0131r\u0131mlar\u0131n\u0131 koordine etmek ve yat\u0131r\u0131m stratejilerini geli\u015ftirmek amac\u0131yla yeni bir \u015firket kurulmas\u0131 \u00e7al\u0131\u015fmalar\u0131n\u0131n da devam etti\u011fi s\u00f6ylendi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Astor Enerji&#8217;den Romanya&#8217;da yapaca\u011f\u0131 enerji yat\u0131r\u0131m\u0131na y\u00f6nelik a\u00e7\u0131klama geldi. GES projesine y\u00f6nelik \u00fc\u00e7 ayr\u0131 s\u00f6zle\u015fme imzaland\u0131. Astor Enerji, (ASTOR) Kamuyu Ayd\u0131nlatma Platformu\u2019na [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":196143,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[105874,116382,532,2326,2569,86383,1245],"views":47,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/196140"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=196140"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/196140\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/196143"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=196140"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=196140"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=196140"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}