{"id":195865,"date":"2025-03-10T10:51:09","date_gmt":"2025-03-10T07:51:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=195865"},"modified":"2025-03-10T10:51:09","modified_gmt":"2025-03-10T07:51:09","slug":"migros-un-kirsehir-ges-projesi-devreye-alindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/migros-un-kirsehir-ges-projesi-devreye-alindi\/","title":{"rendered":"(Turkish) &#8217;Migros&#8217;un K\u0131r\u015fehir GES Projesi Devreye Al\u0131nd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/195865\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Migros, 321 d\u00f6n\u00fcm arazi \u00fczerine kurulu K\u0131r\u015fehir\u2019deki yeni g\u00fcne\u015f enerjisi santralini devreye ald\u0131. Migros\u2019un s\u00fcrd\u00fcr\u00fclebilir enerji vizyonunda \u00f6nemli bir ad\u0131m olan santral, tek ba\u015f\u0131na 56.280 MWh enerji \u00fcretiyor. Bu yat\u0131r\u0131mla birlikte Migros\u2019un GES projelerinden \u00fcretti\u011fi enerji, y\u0131ll\u0131k enerji ihtiyac\u0131n\u0131n y\u00fczde 10\u2019unu kar\u015f\u0131layacak kapasiteye ula\u015ft\u0131.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-195868\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/migros-un-kirsehir-ges-projesi-devreye-alindi.jpg\" alt=\"\" width=\"500\" height=\"281\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/migros-un-kirsehir-ges-projesi-devreye-alindi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/migros-un-kirsehir-ges-projesi-devreye-alindi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/migros-un-kirsehir-ges-projesi-devreye-alindi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/migros-un-kirsehir-ges-projesi-devreye-alindi-80x45.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Migros, K\u0131r\u015fehir\u2019de\u00a0<strong>ilk arazi g\u00fcne\u015f enerjisi santralini<\/strong>\u00a0devreye ald\u0131. 321 d\u00f6n\u00fcm arazi \u00fczerine kurulu<strong>\u00a0<\/strong>tesiste, \u00f6zel olarak \u00fcretilmi\u015f yakla\u015f\u0131k 63 bin adet \u00e7ift y\u00f6nl\u00fc yerli \u00fcretim g\u00fcne\u015f paneli kullan\u0131ld\u0131. Bu \u00e7ift y\u00f6nl\u00fc paneller sayesinde hem direkt g\u00fcne\u015f \u0131\u015f\u0131nlar\u0131ndan hem de yerden yans\u0131yan enerjiden maksimum verim elde edilebiliyor. En son teknoloji komponentler kullan\u0131larak in\u015fa edilen tesis, tek ba\u015f\u0131na y\u0131ll\u0131k 56.280 MWh enerji \u00fcretecek. Daha \u00f6nce devreye al\u0131nan 11.000 MWh kapasiteli d\u00f6rt \u00e7at\u0131 GES projesinin ard\u0131ndan bu yat\u0131r\u0131mla birlikte Migros\u2019un toplam GES projelerinde \u00fcretti\u011fi enerji,\u00a0<strong>y\u0131ll\u0131k enerji ihtiyac\u0131n\u0131n y\u00fczde 10\u2019unu\u00a0<\/strong>kar\u015f\u0131layacak kapasiteye ula\u015ft\u0131. Migros, 2024 y\u0131l\u0131nda GES projelerinin tamam\u0131 i\u00e7in 9,9 milyar TL yat\u0131r\u0131m ger\u00e7ekle\u015ftirdi.<\/p>\n<h3><strong>\u015eevki Tuncer: \u201cK\u0131r\u015fehir GES ile 35 Bin Ton Karbon Sal\u0131m\u0131n\u0131n \u00d6n\u00fcne Ge\u00e7ece\u011fiz\u201d<\/strong><\/h3>\n<div id=\"attachment_195867\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img aria-describedby=\"caption-attachment-195867\" loading=\"lazy\" class=\"wp-image-195867\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/migros-un-kirsehir-ges-projesi-devreye-alindi-1.jpg\" alt=\"\" width=\"500\" height=\"369\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/migros-un-kirsehir-ges-projesi-devreye-alindi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/migros-un-kirsehir-ges-projesi-devreye-alindi-1-300x221.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/migros-un-kirsehir-ges-projesi-devreye-alindi-1-500x369.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/migros-un-kirsehir-ges-projesi-devreye-alindi-1-68x50.jpg 68w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><p id=\"caption-attachment-195867\" class=\"wp-caption-text\">Migen Enerji ve Elektrikli Ara\u00e7 \u015earj Hizmetleri A.\u015e Genel M\u00fcd\u00fcr\u00fc \u015eevki Tuncer<\/p><\/div>\n<p>Migros\u2019un y\u00fczde y\u00fcz i\u015ftiraki olan Migen Enerji A.\u015e., Migros\u2019un enerji tedariki, enerji verimlili\u011fi \u00e7\u00f6z\u00fcmleri ve yenilenebilir enerji yat\u0131r\u0131mlar\u0131 alan\u0131nda u\u00e7tan uca enerji y\u00f6netimi hizmeti sunuyor. 2024 y\u0131l\u0131n\u0131n sonunda EPDK\u2019dan ald\u0131klar\u0131 \u201cElektrik Tedarik Lisans\u0131\u201d ile enerji tedari\u011fi de dahil olmak \u00fczere, \u00e7ok noktal\u0131 t\u00fcketim takibi, verimlilik \u00e7\u00f6z\u00fcmleri ve temiz enerjiye eri\u015fim konular\u0131nda uzman bir marka olduklar\u0131n\u0131 belirten\u00a0<strong>Migen Enerji ve Elektrikli Ara\u00e7 \u015earj Hizmetleri A.\u015e Genel M\u00fcd\u00fcr\u00fc \u015eevki Tuncer<\/strong>, <em>\u201cK\u0131r\u015fehir\u2019de devreye al\u0131nan ilk arazi g\u00fcne\u015f enerjisi sistemimiz ile\u00a0<strong>600\u2019den fazla Migros ma\u011fazam\u0131z\u0131n enerji ihtiyac\u0131n\u0131\u00a0temiz enerji kaynaklar\u0131 ile kar\u015f\u0131l\u0131yoruz.\u00a0<\/strong>2025 y\u0131l\u0131nda d\u00f6rt ilde daha toplam 97.000 MWh enerji \u00fcretecek yeni santraller i\u00e7in \u00e7al\u0131\u015fmalara ba\u015flad\u0131k. 2030 y\u0131l\u0131na kadar karbon emisyonlar\u0131m\u0131z\u0131 y\u00fczde 42 azaltma ve 2050\u2019de net s\u0131f\u0131r emisyona ula\u015fma hedefimiz do\u011frultusunda da kararl\u0131 ad\u0131mlarla ilerliyoruz. Bu tesis sayesinde y\u0131lda\u00a0<strong>35 bin ton karbon<\/strong> sal\u0131m\u0131n\u0131n \u00f6n\u00fcne ge\u00e7ece\u011fiz\u201d<\/em> dedi.<\/p>\n<h3><strong>\u015eevki Tuncer: \u201cMiggo \u015earj \u0130stasyonlar\u0131n\u0131 150 mMa\u011fazaya Ula\u015ft\u0131rma Hedefindeyiz\u201d<\/strong><\/h3>\n<p>Migen ile elektrikli ara\u00e7 \u015farj istasyonlar\u0131 gibi s\u00fcrd\u00fcr\u00fclebilir ula\u015f\u0131m \u00e7\u00f6z\u00fcmlerine de yat\u0131r\u0131m yaparak \u00e7evre dostu bir ekosistem in\u015fa ettiklerini s\u00f6yleyen\u00a0<strong>Tuncer<\/strong>, \u015f\u00f6yle devam etti: <em>\u201cElektrikli ara\u00e7lar\u0131n yayg\u0131nla\u015fmas\u0131yla artan talebi kar\u015f\u0131lamak i\u00e7in\u00a0<strong>Miggo \u015earj uygulamam\u0131z<\/strong>\u00a0ile ma\u011fazalar\u0131m\u0131z\u0131n otoparklar\u0131na \u015farj istasyonlar\u0131 kuruyoruz. Bu sayede m\u00fc\u015fterilerimiz Migros ma\u011fazalar\u0131nda al\u0131\u015fveri\u015f yaparken ara\u00e7lar\u0131n\u0131 da \u015farj etme imkan\u0131na sahip oluyor. 2024 y\u0131l\u0131 sonunda 67 olan elektrikli ara\u00e7 \u015farj istasyonu say\u0131m\u0131z\u0131,\u00a0<strong>2025\u2019te 150\u2019ye \u00e7\u0131karma hedefindeyiz<\/strong>. Gelece\u011fe daha temiz bir d\u00fcnya b\u0131rakmak i\u00e7in, \u00e7evreye duyarl\u0131 enerji projelerimizi b\u00fcy\u00fctmeye devam edece\u011fiz.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Migros, 321 d\u00f6n\u00fcm arazi \u00fczerine kurulu K\u0131r\u015fehir\u2019deki yeni g\u00fcne\u015f enerjisi santralini devreye ald\u0131. Migros\u2019un s\u00fcrd\u00fcr\u00fclebilir enerji vizyonunda \u00f6nemli bir ad\u0131m olan santral, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":195868,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[17750,2326,2569,116193,116317,46779,1245],"views":31,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/195865"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=195865"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/195865\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/195868"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=195865"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=195865"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=195865"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}