{"id":195807,"date":"2025-03-06T11:28:07","date_gmt":"2025-03-06T08:28:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=195807"},"modified":"2025-03-06T11:28:07","modified_gmt":"2025-03-06T08:28:07","slug":"eksim-enerji-viransehir-gesin-45-mwlik-ilk-fazini-devreye-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/eksim-enerji-viransehir-gesin-45-mwlik-ilk-fazini-devreye-aldi\/","title":{"rendered":"(Turkish) &#8217;Eksim Enerji&#8217; Viran\u015fehir GES\u2019in 45 MW&#8217;l\u0131k \u0130lk Faz\u0131n\u0131 Devreye Ald\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/195807\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Eksim Enerji, YEKA GES-4 projelerinden olan \u015eanl\u0131urfa Viran\u015fehir G\u00fcne\u015f Enerji Santrali (GES) projesinin 45 MW\u2019l\u0131k ilk faz\u0131nda Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019n\u0131n kabul\u00fc ve ilgili kay\u0131tlar\u0131n tamamlanmas\u0131yla ticari i\u015fletmeye ba\u015flad\u0131\u011f\u0131n\u0131 duyurdu. Toplam 191,4 MW kapasiteye ula\u015facak santral, tamamland\u0131\u011f\u0131nda 135 bin hanenin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layacak temiz enerjiyi \u00fcretecek.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-195810\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/eksim-enerji-viransehir-gesin-45-mwlik-ilk-fazini-devreye-aldi.jpg\" alt=\"\" width=\"500\" height=\"375\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/eksim-enerji-viransehir-gesin-45-mwlik-ilk-fazini-devreye-aldi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/eksim-enerji-viransehir-gesin-45-mwlik-ilk-fazini-devreye-aldi-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/eksim-enerji-viransehir-gesin-45-mwlik-ilk-fazini-devreye-aldi-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/eksim-enerji-viransehir-gesin-45-mwlik-ilk-fazini-devreye-aldi-67x50.jpg 67w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Yenilenebilir enerji yat\u0131r\u0131mlar\u0131yla T\u00fcrkiye\u2019nin s\u00fcrd\u00fcr\u00fclebilirlik hedeflerine b\u00fcy\u00fck katk\u0131 sa\u011flayan Eksim Enerji, \u015eanl\u0131urfa Viran\u015fehir GES projesinin ilk etab\u0131nda 45 MW\u2019l\u0131k kurulu g\u00fcc\u00fc devreye ald\u0131. Tamamland\u0131\u011f\u0131nda toplam 191,4 MW kapasiteye ula\u015facak proje, 135 bin hanenin ihtiyac\u0131na kar\u015f\u0131l\u0131k gelen elektrik enerjisini temiz kaynaklardan \u00fcretecek. Viran\u015fehir GES yat\u0131r\u0131m\u0131yla b\u00f6lge halk\u0131n\u0131n refah\u0131na da katk\u0131 sa\u011flamay\u0131 hedefleyen Eksim Enerji, tar\u0131ma elveri\u015fsiz ta\u015fl\u0131k alanlar\u0131n temizlenip verimli hale getirilmesinden b\u00f6lgede \u00f6zel sa\u011fl\u0131k taramalar\u0131na kadar sosyal sorumluluk odakl\u0131 \u00e7al\u0131\u015fmalar da y\u00fcr\u00fct\u00fcyor.<\/p>\n<h3><strong>1 Milyon Saatin \u00dczerinde Mesai Ger\u00e7ekle\u015ftirildi<\/strong><\/h3>\n<p>Kurulu g\u00fcc\u00fcn\u00fcn b\u00fcy\u00fck k\u0131sm\u0131n\u0131 r\u00fczgar ve hidroelektrik enerjisi santrallerinde bulunduran \u015firket, Viran\u015fehir GES projesiyle birlikte portf\u00f6y\u00fcne g\u00fcne\u015f enerjisini de ekledi.\u00a0Yenilenebilir enerji kaynaklar\u0131na yapt\u0131\u011f\u0131 yat\u0131r\u0131mlarla sekt\u00f6rdeki konumunu g\u00fc\u00e7lendiren \u015firket, bu projeyle hem \u00fcretim kayna\u011f\u0131 \u00e7e\u015fitlili\u011fini art\u0131r\u0131yor hem de temiz enerji \u00fcretimine katk\u0131da bulunmaya devam ediyor.<\/p>\n<div id=\"attachment_195809\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img aria-describedby=\"caption-attachment-195809\" loading=\"lazy\" class=\"wp-image-195809\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/eksim-enerji-viransehir-gesin-45-mwlik-ilk-fazini-devreye-aldi-1.jpg\" alt=\"\" width=\"500\" height=\"379\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/eksim-enerji-viransehir-gesin-45-mwlik-ilk-fazini-devreye-aldi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/eksim-enerji-viransehir-gesin-45-mwlik-ilk-fazini-devreye-aldi-1-300x227.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/eksim-enerji-viransehir-gesin-45-mwlik-ilk-fazini-devreye-aldi-1-500x379.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/03\/eksim-enerji-viransehir-gesin-45-mwlik-ilk-fazini-devreye-aldi-1-66x50.jpg 66w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><p id=\"caption-attachment-195809\" class=\"wp-caption-text\">Eksim Enerji CEO\u2019su Ark\u0131n Akbay<\/p><\/div>\n<p>Viran\u015fehir\u2019in zorlu topo\u011frafyas\u0131nda b\u00fcy\u00fck \u00f6l\u00e7ekli bir yat\u0131r\u0131m\u0131 daha hayata ge\u00e7irdiklerini aktaran <strong>Eksim Enerji CEO\u2019su Ark\u0131n Akbay<\/strong>, <em>\u201cYakla\u015f\u0131k 2.800 d\u00f6n\u00fcml\u00fck bir alanda hayata ge\u00e7irdi\u011fimiz projemizde, bug\u00fcne kadar 1 milyon saatlik mesai ger\u00e7ekle\u015ftirdik. \u0130lk faz\u0131n \u00fcretime ba\u015flamas\u0131yla emeklerimizin ilk kar\u015f\u0131l\u0131\u011f\u0131n\u0131 alm\u0131\u015f olduk. Ba\u015fta Bakanl\u0131\u011f\u0131m\u0131z olmak \u00fczere \u00fclkemize verdi\u011fimiz taahh\u00fctleri yerine getirmi\u015f olman\u0131n gururunu ya\u015f\u0131yoruz\u201d<\/em> dedi.<\/p>\n<p>Akbay, projenin \u015firketin uzun vadeli b\u00fcy\u00fcme stratejisinin \u00f6nemli bir par\u00e7as\u0131 oldu\u011funa dikkat \u00e7ekerek, <em>\u201c45 MW mevcut \u00fcretimimizi, k\u0131sa s\u00fcre i\u00e7erisinde art\u0131rarak kurulu g\u00fcc\u00fcm\u00fcz\u00fc \u00e7ok yak\u0131nda 191,4 MW\u2019a \u00e7\u0131karaca\u011f\u0131z\u201d<\/em> ifadelerini kulland\u0131.<\/p>\n<h3><strong>B\u00f6lgeye \u00c7ok Y\u00f6nl\u00fc Sosyal ve \u0130ktisadi Destek<\/strong><\/h3>\n<p>Eksim Enerji\u2019nin Viran\u015fehir GES projesi, b\u00f6lge halk\u0131na do\u011frudan istihdam olanaklar\u0131 sunman\u0131n yan\u0131 s\u0131ra sosyal sorumluluk \u00e7al\u0131\u015fmalar\u0131yla da \u00f6ne \u00e7\u0131k\u0131yor. Bu \u00e7al\u0131\u015fmalar kapsam\u0131nda, proje sahas\u0131ndaki yo\u011fun ta\u015fl\u0131k alanlar\u0131n temizlenip tar\u0131ma uygun h\u00e2le getirilerek y\u00f6re halk\u0131na destek sa\u011fland\u0131. Konuya dair detaylar\u0131 payla\u015fan Akbay, <em>\u201cYat\u0131r\u0131mlar\u0131m\u0131zla T\u00fcrkiye\u2019nin her b\u00f6lgesinde var olman\u0131n bizlere y\u00fckledi\u011fi sorumlulu\u011fun fark\u0131nday\u0131z. Kazand\u0131\u011f\u0131m\u0131z\u0131, bir arada bulundu\u011fumuz b\u00f6lge halk\u0131n\u0131n refah\u0131 i\u00e7in kullanmaya azami \u00f6zen g\u00f6steriyoruz. Viran\u015fehir\u2019deki GES projemizi hayata ge\u00e7irirken b\u00f6lge halk\u0131n\u0131n ekonomik g\u00fcc\u00fcn\u00fc zorlayan ta\u015fl\u0131k arazileri temizleme i\u015flemini ger\u00e7ekle\u015ftirdik. Bu kapsamda arazileri ta\u015ftan ar\u0131nd\u0131rarak verimi y\u00fcksek bu toprak alanlar\u0131n\u0131, kom\u015fusu oldu\u011fumuz k\u00f6y\u00fcm\u00fcz\u00fcn istifadesine sunduk. Mahsul\u00fc g\u00f6rmek i\u00e7in sab\u0131rs\u0131zlan\u0131yoruz\u201d<\/em> dedi.<\/p>\n<h3><strong>2029\u2019a Kadar 2.200 MW\u2019\u0131 A\u015fan Kurulu G\u00fcce Ula\u015facak<\/strong><\/h3>\n<p>Eksim Enerji, ge\u00e7ti\u011fimiz y\u0131l <strong>Sakarya\u2019n\u0131n Geyve il\u00e7esinde<\/strong> ger\u00e7ekle\u015ftirdi\u011fi 80 milyon Euro\u2019luk kapasite art\u0131\u015f\u0131yla kurulu g\u00fcc\u00fcn\u00fc art\u0131r\u0131rken, yenilenebilir kaynaklardan \u00fcretti\u011fi temiz enerjinin \u00fclke genelindeki pay\u0131n\u0131 da y\u00fckseltmeye devam etti. <strong>Geyve<\/strong>\u2019de <strong>9 adet N163 r\u00fczgar t\u00fcrbinini<\/strong> daha devreye alarak \u00f6nemli bir e\u015fi\u011fi geride b\u0131rakan \u015firket, benzer ba\u015far\u0131y\u0131 \u015fimdi de \u015eanl\u0131urfa\u2019n\u0131n Viran\u015fehir il\u00e7esindeki g\u00fcne\u015f enerjisi santralinde ger\u00e7ekle\u015ftiriyor.<\/p>\n<p><strong>2029\u2019a kadar<\/strong> hayata ge\u00e7irecekleri yenilenebilir enerji yat\u0131r\u0131mlar\u0131yla <strong>\u2018ilave 1.463 MW kapasite\u2019 hedefi<\/strong> do\u011frultusunda \u00f6nemli a\u015famalardan birini tamamlad\u0131klar\u0131n\u0131 kaydeden <strong>Ark\u0131n Akbay,\u00a0<\/strong><em>\u201cYenilenebilir enerji yat\u0131r\u0131mlar\u0131m\u0131zla \u00fclkemizin ye\u015fil enerji hedeflerine katk\u0131da bulunuyor ve daha iyi bir gelecek i\u00e7in sorumluluk al\u0131yoruz. 2029\u2019a kadar yurt i\u00e7i ve yurt d\u0131\u015f\u0131ndaki stratejik projelerimizi devreye alarak <strong>2.200 MW\u2019\u0131 a\u015fan bir kurulu g\u00fcce<\/strong> ula\u015fma yolunda h\u0131zla ilerliyoruz\u201d<\/em> ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Eksim Enerji, YEKA GES-4 projelerinden olan \u015eanl\u0131urfa Viran\u015fehir G\u00fcne\u015f Enerji Santrali (GES) projesinin 45 MW\u2019l\u0131k ilk faz\u0131nda Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019n\u0131n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":195810,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[97192,2569,116280,116281,116279,358],"views":32,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/195807"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=195807"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/195807\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/195810"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=195807"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=195807"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=195807"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}