{"id":195516,"date":"2025-02-25T15:03:22","date_gmt":"2025-02-25T12:03:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=195516"},"modified":"2025-02-25T15:03:41","modified_gmt":"2025-02-25T12:03:41","slug":"aedastan-alanya-ve-gazipasanin-enerji-altyapisina-yatirim","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aedastan-alanya-ve-gazipasanin-enerji-altyapisina-yatirim\/","title":{"rendered":"(Turkish) &#8217;AEDA\u015e&#8217;tan Alanya ve Gazipa\u015fa\u2019n\u0131n Enerji Altyap\u0131s\u0131na Yat\u0131r\u0131m"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/195516\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>2024\u2019te hayata ge\u00e7irdi\u011fi yat\u0131r\u0131mlarla Antalya\u2019n\u0131n il\u00e7eleri Alanya ve Gazipa\u015fa\u2019n\u0131n enerji altyap\u0131s\u0131n\u0131 daha da g\u00fc\u00e7lendiren AEDA\u015e, iki il\u00e7e i\u00e7in 1 milyar 90 milyon TL\u2019lik yat\u0131r\u0131m yapt\u0131. AEDA\u015e, al\u00e7ak ve orta gerilim seviyesinde yakla\u015f\u0131k 430 kilometrelik yeni \u015febeke tesisinin yan\u0131 s\u0131ra, iki il\u00e7eye toplam 1.482 yeni ayd\u0131nlatma dire\u011fi yat\u0131r\u0131m\u0131 yapt\u0131.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-195518\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/aedastan-alanya-ve-gazipasanin-enerji-altyapisina-yatirim-1.jpg\" alt=\"\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/aedastan-alanya-ve-gazipasanin-enerji-altyapisina-yatirim-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/aedastan-alanya-ve-gazipasanin-enerji-altyapisina-yatirim-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/aedastan-alanya-ve-gazipasanin-enerji-altyapisina-yatirim-1-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/aedastan-alanya-ve-gazipasanin-enerji-altyapisina-yatirim-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/aedastan-alanya-ve-gazipasanin-enerji-altyapisina-yatirim-1-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Antalya, Isparta ve Burdur\u2019daki yakla\u015f\u0131k 2,4 milyonun \u00fczerindeki aboneye kesintisiz ve y\u00fcksek kalitede elektrik da\u011f\u0131t\u0131m\u0131 hizmeti sunmak hedefi ile faaliyet g\u00f6steren Akdeniz Elektrik Da\u011f\u0131t\u0131m A.\u015e. (AEDA\u015e), 2024 y\u0131l\u0131nda hayata ge\u00e7irdi\u011fi yat\u0131r\u0131mlarla hizmet b\u00f6lgesinin enerji altyap\u0131s\u0131n\u0131 g\u00fc\u00e7lendirmeye devam etti.<\/p>\n<p>B\u00f6lgenin ihtiya\u00e7lar\u0131 do\u011frultusuna \u00e7al\u0131\u015fmalar y\u00fcr\u00fcten AEDA\u015e, 2024 y\u0131l\u0131nda Alanya\u2019ya 890 milyon ve Gazipa\u015fa\u2019ya 200 milyon olmak \u00fczere b\u00f6lgeye toplam 1 milyon 90 milyon TL\u2019lik yat\u0131r\u0131m ger\u00e7ekle\u015ftirdi. \u015eirket, iki il\u00e7ede toplam 169 yeni trafoyu devreye al\u0131rken, al\u00e7ak ve orta gerilim seviyesinde yakla\u015f\u0131k 430 kilometrelik yeni \u015febeke tesisi yat\u0131r\u0131m\u0131n\u0131 da tamamlad\u0131. Ayd\u0131nlatma projelerine de \u00f6ncelik veren \u015firket, 2024 y\u0131l\u0131nda toplam 1.482 yeni ayd\u0131nlatma dire\u011fi yat\u0131r\u0131m\u0131 yapt\u0131.<\/p>\n<h3>ALANYA\u2019YA YEN\u0130 146 TRAFO MERKEZ\u0130 KURULDU<\/h3>\n<p>AEDA\u015e, yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131 kapsam\u0131nda 2024 y\u0131l\u0131nda; Alanya\u2019da Avsalar Mahallesi\u2019ne 23, Mahmutlar Mahallesi\u2019ne 17, K\u0131zlarp\u0131nar\u0131 Mahallesi\u2019ne 17, G\u00f6z\u00fcb\u00fcy\u00fck Devecibelen\u2019e 15, Demirta\u015f\u2019a 13, Hacet, Karamanlar ve Kestel mahallerine 3\u2019er, K\u0131z\u0131lca\u015fehir Mahallesi\u2019ne 5, Kocao\u011flanl\u0131 Mahallesi\u2019ne 7, \u015e\u0131hlar, \u015eekerhane mahallelerine 5\u2019er, Saray Mahallesi\u2019ne 4 ilave trafo b\u00f6lgesi tesis ederken, \u015febekenin yenilenmesi ve kapasite art\u0131\u015f\u0131na da gitti. Bu mahalleler ba\u015fta olmak \u00fczere y\u0131l i\u00e7inde Alanya il\u00e7esine yap\u0131lan yeni trafo merkezinin say\u0131s\u0131 146\u2019\u0131 buldu.<\/p>\n<p>2024 y\u0131l\u0131nda Alanya\u2019ya toplam 316 kilometre al\u00e7ak ve orta gerilim \u015febekesi ile 2 bin 907 armat\u00fcr tesis edilirken, 1.430 yeni ayd\u0131nlatma dire\u011finin yan\u0131 s\u0131ra 1.359 al\u00e7ak gerilim, 2 bin 578 de orta gerilim dire\u011fi yat\u0131r\u0131m\u0131 ger\u00e7ekle\u015ftirildi.<\/p>\n<h3>GAZ\u0130PA\u015eA\u2019YA 23 YEN\u0130 TRAFO MERKEZ\u0130 YATIRIMI<\/h3>\n<p>2024 y\u0131l\u0131nda Gazipa\u015fa\u2019da ger\u00e7ekle\u015ftirdi\u011fi yat\u0131r\u0131mlar kapsam\u0131nda ise il\u00e7e genelinde 114 kilometre al\u00e7ak ve orta gerilim \u015febekesi tesis eden AEDA\u015e, 802 tane al\u00e7ak gerilim dire\u011fi ile birlikte, 1.176 tane orta gerilim ve 52 tane de ayd\u0131nlatma dire\u011finin yat\u0131r\u0131m\u0131n\u0131 tamamlad\u0131. \u015eirket, Gazipa\u015fa\u2019n\u0131n Karalar, K\u00fc\u00e7\u00fckl\u00fc, Koruba\u015f\u0131, Karatepe, Kahyalar, Cumhuriyet, Pazarc\u0131, Yenik\u00f6y mahallerinde toplam 23 adet ilave trafo b\u00f6lgesi tesis ederken, \u015febekenin yenilenmesi ve kapasite art\u0131\u015f\u0131 yat\u0131r\u0131mlar\u0131n\u0131 hayata ge\u00e7irdi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 2024\u2019te hayata ge\u00e7irdi\u011fi yat\u0131r\u0131mlarla Antalya\u2019n\u0131n il\u00e7eleri Alanya ve Gazipa\u015fa\u2019n\u0131n enerji altyap\u0131s\u0131n\u0131 daha da g\u00fc\u00e7lendiren AEDA\u015e, iki il\u00e7e i\u00e7in 1 milyar 90 milyon [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":195519,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[31338,101448,5257,35831,18286,117,116195,116194,116196],"views":25,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/195516"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=195516"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/195516\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/195519"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=195516"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=195516"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=195516"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}