{"id":195403,"date":"2025-02-21T14:15:11","date_gmt":"2025-02-21T11:15:11","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=195403"},"modified":"2025-02-21T14:15:11","modified_gmt":"2025-02-21T11:15:11","slug":"dicle-elektrik-4-238-kacak-trafo-tespit-etti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dicle-elektrik-4-238-kacak-trafo-tespit-etti\/","title":{"rendered":"(Turkish) Dicle Elektrik 4.238 Ka\u00e7ak Trafo Tespit Etti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/195403\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Dicle Elektrik, 2024 y\u0131l\u0131nda sorumluluk sahas\u0131ndaki alt\u0131 ilde, b\u00fcy\u00fck k\u0131sm\u0131 tar\u0131msal sulama amac\u0131yla kullan\u0131lan toplam 4.238 kay\u0131t d\u0131\u015f\u0131 trafo tespit etti. Hukuki s\u00fcrecin sonu\u00e7lanmas\u0131 beklenirken bu trafolardan sadece 253 tanesine el konulabildi. S\u00f6z konusu ka\u00e7ak trafolar\u0131n toplam kapasitesinin yakla\u015f\u0131k 335 bin KVA g\u00fcc\u00fcnde oldu\u011fu, bu enerjinin ortalama 67 bin mesken abonesi ve 270 bin ki\u015finin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layabilece\u011fi hesapland\u0131.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-195405\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/dicle-elektrik-4-238-kacak-trafo-tespit-etti-1.jpg\" alt=\"\" width=\"500\" height=\"407\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/dicle-elektrik-4-238-kacak-trafo-tespit-etti-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/dicle-elektrik-4-238-kacak-trafo-tespit-etti-1-300x244.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/dicle-elektrik-4-238-kacak-trafo-tespit-etti-1-491x400.jpg 491w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/dicle-elektrik-4-238-kacak-trafo-tespit-etti-1-61x50.jpg 61w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/dicle-elektrik-4-238-kacak-trafo-tespit-etti-1-500x407.jpg 500w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>G\u00fcneydo\u011fu Anadolu\u2019daki 6 ilde, Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 ile Enerji Piyasas\u0131 D\u00fczenleme Kurumu\u2019nun reg\u00fclasyonlar\u0131 \u00e7er\u00e7evesinde elektrik da\u011f\u0131t\u0131m hizmeti veren Dicle Elektrik, kay\u0131t d\u0131\u015f\u0131 enerji t\u00fcketimiyle m\u00fccadelesine devam ediyor. \u015eirket, bu kapsamda 2024 y\u0131l\u0131nda drone ve yapay zeka destekli \u00e7al\u0131\u015fmalar sayesinde, ka\u00e7ak elektrik t\u00fcketimi amac\u0131yla kullan\u0131lan, \u00e7o\u011fu mobil, 4.238 kay\u0131t d\u0131\u015f\u0131 trafo tespit etti. Bu trafolar\u0131n toplam kurulu g\u00fcc\u00fcn\u00fcn ise yakla\u015f\u0131k 334.962 KVA oldu\u011funu duyurdu.<\/p>\n<h3><strong>Ka\u00e7ak Trafolar Bir \u015eehre Yetecek G\u00fc\u00e7te<\/strong><\/h3>\n<p>Yap\u0131lan hesaplamalara g\u00f6re, s\u00f6z konusu kay\u0131t d\u0131\u015f trafolar\u0131n kurulu g\u00fcc\u00fc, ortalama 67 bin meskenin ve 270 bin ki\u015finin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layabiliyor. Tespit edilen trafolar, T\u00dc\u0130K\u2019in 2023 y\u0131l\u0131 adrese dayal\u0131 n\u00fcfus verilerine g\u00f6re Karaman, K\u0131r\u015fehir, Erzincan, Sinop gibi n\u00fcfusu 270 binin alt\u0131ndaki 15 ile ayr\u0131 ayr\u0131 enerji verebilecek kurulu g\u00fcce sahip. Bir di\u011fer deyi\u015fle, sadece tar\u0131msal sulama alanlar\u0131nda, kay\u0131t d\u0131\u015f\u0131 trafolar marifetiyle kullan\u0131lan ka\u00e7ak elektrik miktar\u0131, bu \u015fehirlerden her birinin y\u0131ll\u0131k elektrik t\u00fcketiminden bile daha fazla.<\/p>\n<h3><strong>El Konulabilen Trafo Say\u0131s\u0131 Yaln\u0131zca 253<\/strong><\/h3>\n<p>Tespit edilen 4.238 adet ka\u00e7ak trafonun koordinatlar\u0131, seri numaralar\u0131 ve g\u00f6rselleri bulunduklar\u0131 illerdeki savc\u0131l\u0131klara iletilerek hukuki s\u00fcrecin ba\u015flat\u0131lmas\u0131 sa\u011fland\u0131. Ancak adli prosed\u00fcrler ve baz\u0131 ka\u00e7ak trafo sahiplerinin ekiplerin geli\u015fini \u00f6nceden haber alarak trafonun yerini de\u011fi\u015ftirmesi gibi nedenlerle sadece 253 tanesine el konulabildi. Di\u011fer yandan el konulamayan ka\u00e7ak trafolar\u0131n farkl\u0131 b\u00f6lgelerde kullan\u0131m\u0131n\u0131n devam etti\u011fi de ortaya \u00e7\u0131kt\u0131.<\/p>\n<h3><strong>\u015eanl\u0131urfa Ka\u00e7ak Trafoda Ba\u015f\u0131 \u00c7ekiyor<\/strong><\/h3>\n<p>Yap\u0131lan incelemelerde; ka\u00e7ak trafo tespitinin b\u00fcy\u00fck \u00e7o\u011funlu\u011fu \u015eanl\u0131urfa&#8217;da ger\u00e7ekle\u015fti. \u015eanl\u0131urfa\u2019y\u0131 Mardin, Diyarbak\u0131r, \u015e\u0131rnak ve Batman illeri takip etti. Siirt ise ka\u00e7ak elektrik kullan\u0131m\u0131n\u0131n en az oldu\u011fu il olarak kay\u0131tlara ge\u00e7ti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Dicle Elektrik, 2024 y\u0131l\u0131nda sorumluluk sahas\u0131ndaki alt\u0131 ilde, b\u00fcy\u00fck k\u0131sm\u0131 tar\u0131msal sulama amac\u0131yla kullan\u0131lan toplam 4.238 kay\u0131t d\u0131\u015f\u0131 trafo tespit etti. Hukuki [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":195406,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[12240,116162,19100,113954,2097,13289],"views":14,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/195403"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=195403"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/195403\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/195406"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=195403"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=195403"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=195403"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}