{"id":194915,"date":"2025-02-05T15:27:12","date_gmt":"2025-02-05T12:27:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=194915"},"modified":"2025-02-05T15:27:12","modified_gmt":"2025-02-05T12:27:12","slug":"yeka-ges-2024-yarismalarinda-6-bolge-icin-en-iyi-teklifler-belli-oldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yeka-ges-2024-yarismalarinda-6-bolge-icin-en-iyi-teklifler-belli-oldu\/","title":{"rendered":"(Turkish) YEKA GES-2024 Yar\u0131\u015fmalar\u0131nda 6 B\u00f6lge \u0130\u00e7in En \u0130yi Teklifler Belli Oldu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/194915\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131n\u0131n, 6 ayr\u0131 b\u00f6lge i\u00e7in toplam 800 megavatl\u0131k g\u00fcne\u015f enerjisine dayal\u0131 Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA GES) yar\u0131\u015fmalar\u0131 67 \u015firketin kat\u0131l\u0131m\u0131yla yap\u0131ld\u0131.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-194917\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/yeka-ges-2024-yarismalarinda-6-bolge-icin-en-iyi-teklifler-belli-oldu.jpg\" alt=\"\" width=\"500\" height=\"333\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/yeka-ges-2024-yarismalarinda-6-bolge-icin-en-iyi-teklifler-belli-oldu.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/yeka-ges-2024-yarismalarinda-6-bolge-icin-en-iyi-teklifler-belli-oldu-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/yeka-ges-2024-yarismalarinda-6-bolge-icin-en-iyi-teklifler-belli-oldu-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/yeka-ges-2024-yarismalarinda-6-bolge-icin-en-iyi-teklifler-belli-oldu-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/02\/yeka-ges-2024-yarismalarinda-6-bolge-icin-en-iyi-teklifler-belli-oldu-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131n\u0131n d\u00fczenledi\u011fi YEKA GES-2024 yar\u0131\u015fmalar\u0131nda, kapal\u0131 mali tekliflerin a\u00e7\u0131lmas\u0131n\u0131n ard\u0131ndan a\u00e7\u0131k art\u0131rma usul\u00fcne ge\u00e7ildi.<\/p>\n<p><strong>Konya, Karaman, Malatya, Van, Antalya ve K\u00fctahya\u2019da toplam 800 megavat g\u00fcc\u00fcndeki 6 projenin elektrik ba\u011flant\u0131 kapasitesinin tahsisi amac\u0131yla d\u00fczenlenen yar\u0131\u015fmalarda tavan ve taban fiyatlar kilovatsaat ba\u015f\u0131na 3,25 sent\/dolar olarak belirlendi.<\/strong><\/p>\n<p>&#8211; Bakanl\u0131kta yap\u0131lan yar\u0131\u015fmalar kapsam\u0131nda, toplam 33 ba\u015fvuruyla 40 megavat kapasite i\u00e7in yap\u0131lan \u2018<strong>K\u00fctahya GES<\/strong>\u2019 yar\u0131\u015fmas\u0131nda 11. turda, kilovatsaat ba\u015f\u0131na 3,25 sent\/dolar elektrik birim fiyat\u0131 ve megavat ba\u015f\u0131na 162 bin dolar katk\u0131 pay\u0131yla <strong>\u00c7umra G\u00fcne\u015f Enerjisi ve \u00dcretim A\u015e<\/strong>\u00a0en iyi teklifi verdi.<\/p>\n<p>&#8211; 27 ba\u015fvuruyla 40 megavat kapasite i\u00e7in ger\u00e7ekle\u015ftirilen <strong>\u2018Antalya GES\u2019<\/strong> yar\u0131\u015fmas\u0131nda 10. turda, kilovatsaat ba\u015f\u0131na 3,25 sent\/dolar elektrik birim fiyat\u0131 ve megavat ba\u015f\u0131na 122 bin dolar katk\u0131 pay\u0131 ile en iyi teklif <strong>Erdem Soft Tekstil A\u015e<\/strong>\u2018den geldi.<\/p>\n<p>&#8211; 23 ba\u015fvuruyla 60 megavat kapasite i\u00e7in ger\u00e7ekle\u015ftirilen<strong> \u2018Van GES\u2019<\/strong> yar\u0131\u015fmas\u0131nda 21. turda, kilovatsaat ba\u015f\u0131na 3,25 sent\/dolar elektrik birim fiyat\u0131 ve megavat ba\u015f\u0131na 270 bin dolar katk\u0131 pay\u0131 ile <strong>Chen G\u00fcne\u015f Enerjisi LTD<\/strong> en iyi teklifi verdi.<\/p>\n<p>&#8211; Toplam 75 megavat kapasite i\u00e7in 31 ba\u015fvuruyla ger\u00e7ekle\u015ftirilen<strong> \u2018Malatya GES\u2019<\/strong> yar\u0131\u015fmas\u0131nda en iyi teklifi veren, 13. turda, kilovatsaat ba\u015f\u0131na 3,25 sent\/dolar elektrik birim fiyat\u0131 ve megavat ba\u015f\u0131na 232 bin dolar katk\u0131 pay\u0131yla\u00a0<strong>\u00d6zerka Enerji Elektrik \u00dcretim A\u015e<\/strong> oldu.<\/p>\n<p>&#8211; YEKA GES-2024 Yar\u0131\u015fmalar\u0131 kapsam\u0131nda, 200 megavat kapasite i\u00e7in 23 ba\u015fvuruyla yap\u0131lan <strong>\u2018Karaman GES\u2019<\/strong> yar\u0131\u015fmas\u0131nda 6. turda, kilovatsaat ba\u015f\u0131na 3,25 sent\/dolar elektrik birim fiyat\u0131 ve megavat ba\u015f\u0131na 150 bin dolar katk\u0131 pay\u0131yla en iyi teklif\u00a0<strong>Temmuz G\u00fcne\u015f Enerji \u00dcretim A\u015e<\/strong>\u2018den geldi.<\/p>\n<p>&#8211; Toplam 9 ba\u015fvuruyla 385 megavat kapasite i\u00e7in yap\u0131lan <strong>\u2018Karap\u0131nar GES\u2019<\/strong> yar\u0131\u015fmas\u0131nda ise 9. turda, kilovatsaat ba\u015f\u0131na 3,25 sent\/dolar elektrik birim fiyat\u0131 ve megavat ba\u015f\u0131na 67 bin dolar katk\u0131 pay\u0131yla <strong>Kalyon YEKA GES 5 Elektrik \u00dcretim A\u015e<\/strong>\u00a0en iyi teklifi verdi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131n\u0131n, 6 ayr\u0131 b\u00f6lge i\u00e7in toplam 800 megavatl\u0131k g\u00fcne\u015f enerjisine dayal\u0131 Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA GES) yar\u0131\u015fmalar\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":194917,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[115992,2326,13,2569,115994,74829,28026,115993,38562,115991,115472],"views":25,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/194915"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=194915"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/194915\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/194917"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=194915"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=194915"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=194915"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}