{"id":19452,"date":"2013-12-16T18:23:16","date_gmt":"2013-12-16T15:23:16","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=19452"},"modified":"2013-12-16T18:23:16","modified_gmt":"2013-12-16T15:23:16","slug":"stadyuma-gunes-paneli-yerlestirildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/stadyuma-gunes-paneli-yerlestirildi\/","title":{"rendered":"(Turkish) Stadyum\u2019a G\u00fcne\u015f Paneli Yerle\u015ftirildi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/19452\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Brezilya 2014 F\u0130FA D\u00fcnya Kupas\u0131\u2019nda kullan\u0131lacak olan stadyumlardan biri olan Itaipava Arena Pernambuco\u2019nun \u00e7at\u0131s\u0131na 1 MW\u2019l\u0131k g\u00fcne\u015f paneli yerle\u015ftirildi. Brezilyal\u0131 Elektrik D\u00fczenleme Ajans\u0131 (Aneel) taraf\u0131ndan ba\u015flat\u0131lan pilot g\u00fcne\u015f p<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/stadyuma-gunes-paneli-yerlestirildi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-19453\" title=\"stadyuma-gunes-paneli-yerlestirildi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/stadyuma-gunes-paneli-yerlestirildi-300x199.jpg\" alt=\"\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/stadyuma-gunes-paneli-yerlestirildi-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/stadyuma-gunes-paneli-yerlestirildi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/stadyuma-gunes-paneli-yerlestirildi.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>rogram\u0131n\u0131n bir par\u00e7as\u0131 olarak yeni bir stadyum olan Itaipava Arena Pernambuco\u2019nun \u00e7at\u0131s\u0131 1 MW\u2019l\u0131k g\u00fcne\u015f paneli ile kapland\u0131.<\/strong><\/p>\n<p>46.154 ki\u015fi kapasiteli stadyuma kurulang\u00fcne\u015f panelleri yakla\u015f\u0131k 6 bin ki\u015finin ihtiyac\u0131na denk gelen, stadyumun ihtiyac\u0131 olan elektri\u011fin %30\u2019unu kar\u015f\u0131layacak.<\/p>\n<p>\u00c7at\u0131ya g\u00fcne\u015f panellerini Grupo Neoenergia firmas\u0131 yerle\u015ftirdi. Firma, Brezilya elektrik sekt\u00f6r\u00fcnde, yerel Pernambuco y\u00f6netimine ait elektrik \u015firketi olan CELPE ve Odebrecht Energia ile ortak yat\u0131r\u0131mlar ger\u00e7ekle\u015ftiriyor. Grupo Neoenergia daha \u00f6nce de Brezilya Salvador\u2019daki Pituacu Stad\u0131`nda g\u00fcne\u015f panellerinin kurulumunu ger\u00e7ekle\u015ftirmi\u015fti. Bu stadyum Latin Amerika\u2019da PV ile kaplanan ilk stadyum olmu\u015ftu.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/stadyuma-gunes-paneli-yerlestirildi_6123.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Brezilya 2014 F\u0130FA D\u00fcnya Kupas\u0131\u2019nda kullan\u0131lacak olan stadyumlardan biri olan Itaipava Arena Pernambuco\u2019nun \u00e7at\u0131s\u0131na 1 MW\u2019l\u0131k g\u00fcne\u015f paneli yerle\u015ftirildi. Brezilyal\u0131 Elektrik D\u00fczenleme Ajans\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":19453,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[11314,61,19,63,67,1009,165,502,11316,227,13,142,11315,1405,11317],"views":1021,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19452"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=19452"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19452\/revisions"}],"predecessor-version":[{"id":19455,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19452\/revisions\/19455"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/19453"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=19452"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=19452"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=19452"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}