{"id":194490,"date":"2025-01-24T14:25:06","date_gmt":"2025-01-24T11:25:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=194490"},"modified":"2025-01-24T14:25:25","modified_gmt":"2025-01-24T11:25:25","slug":"aralik-2024-sonu-toplam-kurulu-gucun-yuzde-17-0-lik-kismi-gunesten","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aralik-2024-sonu-toplam-kurulu-gucun-yuzde-17-0-lik-kismi-gunesten\/","title":{"rendered":"(Turkish) Aral\u0131k 2024 Sonu Toplam Kurulu G\u00fcc\u00fcn %17,0\u2019l\u0131k K\u0131sm\u0131 G\u00fcne\u015f&#8217;ten&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/194490\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>2024 y\u0131l\u0131 Kas\u0131m ay\u0131 sonunda 115.189 MW olan toplam kurulu g\u00fc\u00e7 de\u011feri 193,52 MW\u2019l\u0131k art\u0131\u015fla 2024 y\u0131l\u0131 Aral\u0131k ay\u0131 sonunda 115.382 MW olarak kaydedildi.\u00a02024 y\u0131l\u0131 Aral\u0131k ay\u0131 sonunda olu\u015fan toplam kurulu g\u00fcc\u00fcn\u00a0%17,0\u2019l\u0131k k\u0131sm\u0131 (19.618 MW) g\u00fcne\u015f enerjisi santralleri taraf\u0131ndan olu\u015fturuldu.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-194510\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aralik-2024-sonu-toplam-kurulu-gucun-yuzde-17-0-lik-kismi-gunesten.jpg\" alt=\"\" width=\"500\" height=\"348\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aralik-2024-sonu-toplam-kurulu-gucun-yuzde-17-0-lik-kismi-gunesten.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aralik-2024-sonu-toplam-kurulu-gucun-yuzde-17-0-lik-kismi-gunesten-300x209.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aralik-2024-sonu-toplam-kurulu-gucun-yuzde-17-0-lik-kismi-gunesten-500x348.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aralik-2024-sonu-toplam-kurulu-gucun-yuzde-17-0-lik-kismi-gunesten-72x50.jpg 72w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>APLUS Enerji taraf\u0131ndan haz\u0131rlanan analize g\u00f6re, ger\u00e7ekle\u015fen elektrik \u00fcretimi kaynak bak\u0131m\u0131ndan incelendi\u011finde ise, 2024 Aral\u0131k ay\u0131nda toplam \u00fcretimin %26,5\u2019inin do\u011fal gaz ve LNG santralleri taraf\u0131ndan ger\u00e7ekle\u015ftirildi\u011fi g\u00f6r\u00fclmektedir. Barajl\u0131 hidroelektrik santraller, ilgili ayda toplam \u00fcretimin %10,7\u2019sini kar\u015f\u0131larken, akarsu tipi hidroelektrik santraller ise %3,7 oran\u0131yla \u00fcretime katk\u0131da bulunmu\u015ftur. \u0130thal k\u00f6m\u00fcr santralleri Aral\u0131k ay\u0131nda toplam \u00fcretimin %23,4\u2019\u00fcn\u00fc kar\u015f\u0131larken, yerli k\u00f6m\u00fcr santralleri ise %13,6 oran\u0131nda katk\u0131 sa\u011flam\u0131\u015ft\u0131r. Yenilenebilir enerji santrallerinden r\u00fczg\u00e2r enerjisi santralleri toplam \u00fcretime %11,7 jeotermal ve g\u00fcne\u015f enerjisi santralleri ise toplam %7,5 oran\u0131nda katk\u0131da bulunmu\u015ftur. Di\u011fer termik santrallerin \u00fcretimdeki pay\u0131 ise %2,8 olarak ger\u00e7ekle\u015fmi\u015ftir.<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-194507\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aralik-2024-sonu-toplam-kurulu-gucun-yuzde-17-0-lik-kismi-gunesten-1.jpg\" alt=\"\" width=\"500\" height=\"186\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aralik-2024-sonu-toplam-kurulu-gucun-yuzde-17-0-lik-kismi-gunesten-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aralik-2024-sonu-toplam-kurulu-gucun-yuzde-17-0-lik-kismi-gunesten-1-300x112.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aralik-2024-sonu-toplam-kurulu-gucun-yuzde-17-0-lik-kismi-gunesten-1-500x186.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aralik-2024-sonu-toplam-kurulu-gucun-yuzde-17-0-lik-kismi-gunesten-1-80x30.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<h3>2024 Y\u0131l\u0131 Aral\u0131k Ay\u0131<\/h3>\n<p>2024 y\u0131l\u0131 Aral\u0131k ay\u0131 sonunda olu\u015fan toplam kurulu g\u00fcc\u00fcn %21,4\u2019l\u00fck k\u0131sm\u0131 (24.675 MW) do\u011fal gaz ve LNG yak\u0131t tipi santralleri ile kar\u015f\u0131lan\u0131rken, %20,7\u2019lik k\u0131sm\u0131 (23.863 MW) barajl\u0131 hidrolik santraller taraf\u0131ndan kar\u015f\u0131lanmaktad\u0131r. Bu yak\u0131t tiplerini %9,9\u2019luk (11.475 MW) oran ile yerli k\u00f6m\u00fcr santralleri ve %9,0\u2019l\u0131k oran (10.404 MW) ile ithal k\u00f6m\u00fcr santralleri izlemektedir. Akarsu tipi hidrolik santraller %7,2\u2019lik bir orana (8.340 MW) sahipken, r\u00fczg\u00e2r santralleri toplam kurulu g\u00fcc\u00fcn %10,9\u2019luk bir k\u0131sm\u0131n\u0131 (12.576 MW) olu\u015fturmaktad\u0131r. Toplam kurulu g\u00fcc\u00fcn %17,0\u2019l\u0131k k\u0131sm\u0131 (19.618 MW) g\u00fcne\u015f enerjisi santralleri, %1,5\u2019lik k\u0131sm\u0131 (1.728 MW) jeotermal enerji santrallerinden olu\u015furken, %2,3\u2019l\u00fck k\u0131sm\u0131 (2.703 MW) ise di\u011fer termik santraller taraf\u0131ndan olu\u015fturulmaktad\u0131r.<\/p>\n<p>Kaynak:\u00a0<a href=\"https:\/\/www.tenva.org\/aplus-enerji-aralik-2024-analizi\/\" target=\"_blank\" rel=\"noopener\">APLUS Enerji \/ TENVA<\/a><\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e &#8211;\u00a0<a href=\"mailto:alperen.ertas@enerjigazetesi.ist\" target=\"_blank\" rel=\"noopener\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 2024 y\u0131l\u0131 Kas\u0131m ay\u0131 sonunda 115.189 MW olan toplam kurulu g\u00fc\u00e7 de\u011feri 193,52 MW\u2019l\u0131k art\u0131\u015fla 2024 y\u0131l\u0131 Aral\u0131k ay\u0131 sonunda 115.382 MW [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":194510,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[35668,2326,1325,842,105],"views":33,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/194490"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=194490"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/194490\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/194510"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=194490"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=194490"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=194490"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}