{"id":194219,"date":"2025-01-17T11:53:45","date_gmt":"2025-01-17T08:53:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=194219"},"modified":"2025-01-17T11:53:45","modified_gmt":"2025-01-17T08:53:45","slug":"dicle-elektrikten-dronelu-kacak-elektrik-operasyonu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dicle-elektrikten-dronelu-kacak-elektrik-operasyonu\/","title":{"rendered":"(Turkish) Dicle Elektrik\u2019ten Drone\u2019lu Ka\u00e7ak Elektrik Operasyonu!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/194219\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Ka\u00e7ak elektrikle m\u00fccadeledeki etkinli\u011fini art\u0131rmaya devam eden Dicle Elektrik, Mardin&#8217;deki bir m\u0131s\u0131r kurutma tesisinde 2,5 milyon TL\u2019ye mal olan ka\u00e7ak \u015febeke tespit etti. Tesisin, yakla\u015f\u0131k 1.000 hanenin elektrik t\u00fcketimine denk gelen enerji kulland\u0131\u011f\u0131 belirlenirken 20 g\u00fcn s\u00fcren tespit \u00e7al\u0131\u015fmalar\u0131n\u0131n ard\u0131ndan ger\u00e7ekle\u015ftirilen operasyonda, gizli b\u00f6lmelere saklanm\u0131\u015f iki ka\u00e7ak trafoya da el konuldu.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-194222\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/dicle-elektrikten-dronelu-kacak-elektrik-operasyonu-1.jpg\" alt=\"\" width=\"500\" height=\"385\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/dicle-elektrikten-dronelu-kacak-elektrik-operasyonu-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/dicle-elektrikten-dronelu-kacak-elektrik-operasyonu-1-300x231.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/dicle-elektrikten-dronelu-kacak-elektrik-operasyonu-1-500x385.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/dicle-elektrikten-dronelu-kacak-elektrik-operasyonu-1-65x50.jpg 65w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/dicle-elektrikten-dronelu-kacak-elektrik-operasyonu-1-260x200.jpg 260w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>EPDK&#8217;n\u0131n elektrik t\u00fcketici hizmetlerindeki kay\u0131p ve ka\u00e7a\u011f\u0131 \u00f6nleyecek ad\u0131mlar\u0131 da kapsayan yeni d\u00fczenlemelerin Resmi Gazete&#8217;de yay\u0131nlanmas\u0131 sekt\u00f6rde memnuniyetle kar\u015f\u0131land\u0131. Bu do\u011frultuda ka\u00e7ak elektri\u011fi \u00f6nlemek i\u00e7in sahada kar\u015f\u0131la\u015f\u0131lan engeller teknolojinin yard\u0131m\u0131 ile daha rahat a\u015f\u0131labilecek. 2020 y\u0131l\u0131ndan beri drone teknolojisiyle ka\u00e7ak elektrik kullan\u0131mlar\u0131n\u0131 tespit edebilen Dicle Elektrik ise \u00e7al\u0131\u015fmalar\u0131n\u0131 aral\u0131ks\u0131z s\u00fcrd\u00fcr\u00fcyor. \u201cKesintisiz, kaliteli ve kay\u0131ps\u0131z enerji\u201d hedefiyle G\u00fcneydo\u011fu Anadolu\u2019da 6 ilde elektrik da\u011f\u0131t\u0131m hizmeti veren \u015firketin saha denetimleri, b\u00f6lgede a\u011f\u0131rl\u0131kl\u0131 olarak tar\u0131msal sulama amac\u0131yla t\u00fcketilen ka\u00e7ak elektri\u011fin bu kez tar\u0131m \u00fcr\u00fcnlerinin i\u015flenmesinde de kullan\u0131ld\u0131\u011f\u0131n\u0131 ortaya koydu. Son olarak Mardin\u2019in Derik il\u00e7esine ba\u011fl\u0131 Koval\u0131 Mahallesi\u2019nde drone destekli bir operasyonda yakla\u015f\u0131k 20 d\u00f6n\u00fcml\u00fck bir alan \u00fczerinde kurulu m\u0131s\u0131r kurutma tesisinde yap\u0131lan incelemede, yasalara ayk\u0131r\u0131 \u015fekilde olu\u015fturulmu\u015f bir elektrik \u015febekesi tespit edildi. Tesisin, yakla\u015f\u0131k 1.000 hanenin elektrik t\u00fcketimine denk gelen enerji kulland\u0131\u011f\u0131 belirlendi.<\/p>\n<h3><strong>2,5 Milyon Liral\u0131k Ka\u00e7ak \u015eebeke Gizli B\u00f6lmelere Yerle\u015ftirilmi\u015f<\/strong><\/h3>\n<p>Ka\u00e7ak \u015febekenin, 1.000 KVA ve 1.250 KVA g\u00fcc\u00fcnde iki trafodan olu\u015ftu\u011fu ve trafolar\u0131n duvara paralel ikinci bir duvar \u00f6r\u00fclerek gizli b\u00f6lmelere yerle\u015ftirildi\u011fi, kablolar\u0131n boyanarak kablolar\u0131n kamufle edildi\u011fini a\u00e7\u0131klayan \u015firket yetkilileri, kurulan sistemin en az 2,5 milyon TL\u2019ye mal oldu\u011funu ve tesisin enerji ihtiyac\u0131n\u0131n tamamen ka\u00e7ak yollarla kar\u015f\u0131land\u0131\u011f\u0131 bilgisini verdi. Tesisteki trafolar\u0131n, duvarla paralel ikinci bir duvar \u00f6r\u00fclerek olu\u015fturulan gizli b\u00f6lmelere yerle\u015ftirildi\u011fi ve kablolar\u0131n kamuflaj ama\u00e7l\u0131 boyand\u0131\u011f\u0131 tespit edildi. Ayr\u0131ca, elektrik dire\u011fine t\u0131rmanarak ka\u00e7ak ba\u011flant\u0131y\u0131 iptal etmeye \u00e7al\u0131\u015fan ki\u015filerin davran\u0131\u015flar\u0131 drone kameralar\u0131na yans\u0131d\u0131.<\/p>\n<h3><strong>Drone ve Yapay Zeka Teknolojileri ile Ka\u00e7akla M\u00fccadele<\/strong><\/h3>\n<p>24 Aral\u0131k 2024\u2019te ba\u015flat\u0131lan ve 20 g\u00fcn s\u00fcren yasa d\u0131\u015f\u0131 enerji kullan\u0131m\u0131na y\u00f6nelik operasyon, Dicle Elektrik\u2019in drone ve yapay zeka destekli teknolojik imkanlar\u0131n\u0131 kullanarak ger\u00e7ekle\u015ftirdi\u011fi en kapsaml\u0131 ka\u00e7ak elektrik operasyonlar\u0131ndan biri olarak ka\u00e7akla m\u00fccadele tarihine ge\u00e7ti. Bir akaryak\u0131t istasyonunun da sahibi oldu\u011fu belirlenen tesis ilgilisine, Enerji Piyasas\u0131 T\u00fcketici Hizmetleri Y\u00f6netmeli\u011fi\u2019nin 42. maddesi uyar\u0131nca i\u015flem yap\u0131ld\u0131\u011f\u0131 a\u00e7\u0131kland\u0131<\/p>\n<h3><strong>\u201cKa\u00e7ak Elektrik Ekonomiye ve Topluma Zarar Veriyor\u201d<\/strong><\/h3>\n<p>Ka\u00e7ak elektrik kullan\u0131m\u0131n\u0131n yaln\u0131zca ekonomik kay\u0131plara de\u011fil ayn\u0131 zamanda \u015febeke altyap\u0131s\u0131na da zarar vererek enerji kalitesini d\u00fc\u015f\u00fcrd\u00fc\u011f\u00fcn\u00fc vurgulayan Dicle Elektrik yetkilileri, <em>\u201cS\u00fcrd\u00fcr\u00fclebilir ve kaliteli enerji hizmeti sunmak i\u00e7in ka\u00e7ak elektrikle m\u00fccadelemizi teknolojik imkanlarla g\u00fc\u00e7lendiriyoruz. Yasa d\u0131\u015f\u0131 enerji kullan\u0131m\u0131n\u0131n \u00f6n\u00fcne ge\u00e7mek ve kaynaklar\u0131m\u0131z\u0131n verimlili\u011fini korumak i\u00e7in \u00e7al\u0131\u015fmalar\u0131m\u0131za h\u0131z kesmeden devam edece\u011fiz.\u201d<\/em> ifadelerini kullan\u0131ld\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ka\u00e7ak elektrikle m\u00fccadeledeki etkinli\u011fini art\u0131rmaya devam eden Dicle Elektrik, Mardin&#8217;deki bir m\u0131s\u0131r kurutma tesisinde 2,5 milyon TL\u2019ye mal olan ka\u00e7ak \u015febeke tespit [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":194221,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[12240,57053,15016,8635,14521,115779,12716,7105,115778],"views":41,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/194219"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=194219"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/194219\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/194221"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=194219"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=194219"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=194219"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}