{"id":193853,"date":"2025-01-07T10:36:29","date_gmt":"2025-01-07T07:36:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=193853"},"modified":"2025-01-07T10:36:29","modified_gmt":"2025-01-07T07:36:29","slug":"aksa-enerjinin-ozbekistandaki-kurulu-gucu-1220-mwa-yukselecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerjinin-ozbekistandaki-kurulu-gucu-1220-mwa-yukselecek\/","title":{"rendered":"(Turkish) &#8217;Aksa Enerji&#8217;nin \u00d6zbekistan\u2019daki Kurulu G\u00fcc\u00fc 1220 MW\u2019a Y\u00fckselecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/193853\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Aksa Enerji, \u00d6zbekistan\u2019\u0131n Talimercan \u015fehrinde 7 ay gibi k\u0131sa bir s\u00fcrede tamamlad\u0131\u011f\u0131 do\u011fal gaz kombine \u00e7evrim santralinin ilk \u00fcnitelerinde enerji \u00fcretimine ba\u015flad\u0131. \u015eirket, kombine \u00e7evrimin tamamlanmas\u0131yla beraber \u00d6zbekistan\u2019daki toplam kurulu g\u00fcc\u00fc 1.220 MW\u2019a y\u00fckseltecek ve 2030 Global Stratejisi kapsam\u0131ndaki g\u00fc\u00e7l\u00fc hedeflerine bir ad\u0131m daha yakla\u015facak.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-193856\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aksa-enerjinin-ozbekistandaki-kurulu-gucu-1220-mwa-yukselecek.jpg\" alt=\"\" width=\"500\" height=\"281\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aksa-enerjinin-ozbekistandaki-kurulu-gucu-1220-mwa-yukselecek.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aksa-enerjinin-ozbekistandaki-kurulu-gucu-1220-mwa-yukselecek-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aksa-enerjinin-ozbekistandaki-kurulu-gucu-1220-mwa-yukselecek-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aksa-enerjinin-ozbekistandaki-kurulu-gucu-1220-mwa-yukselecek-80x45.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>\u00d6zbekistan\u2019\u0131n en b\u00fcy\u00fck T\u00fcrk yat\u0131r\u0131m \u015firketi Aksa Enerji, 430 MW kurulu g\u00fcce sahip Talimercan Do\u011fal Gaz Kombine \u00c7evrim Santrali\u2019nde ilk \u00fcniteleri devreye ald\u0131. 7 ay gibi rekor bir s\u00fcrede in\u015fa edilen santralin \u00fcniteleri basit \u00e7evrim olarak 396 MW\u2019a denk kurulu g\u00fc\u00e7 \u00fcretecek. Kombine \u00e7evrimin tamamlanmas\u0131n\u0131n ard\u0131ndan \u015firketin \u00d6zbekistan\u2019daki toplam kurulu g\u00fcc\u00fc 1.220 MW\u2019a y\u00fckselecek.<\/p>\n<div id=\"attachment_193855\" style=\"width: 510px\" class=\"wp-caption aligncenter\"><img aria-describedby=\"caption-attachment-193855\" loading=\"lazy\" class=\"wp-image-193855\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aksa-enerjinin-ozbekistandaki-kurulu-gucu-1220-mwa-yukselecek-1.jpg\" alt=\"\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aksa-enerjinin-ozbekistandaki-kurulu-gucu-1220-mwa-yukselecek-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aksa-enerjinin-ozbekistandaki-kurulu-gucu-1220-mwa-yukselecek-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aksa-enerjinin-ozbekistandaki-kurulu-gucu-1220-mwa-yukselecek-1-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aksa-enerjinin-ozbekistandaki-kurulu-gucu-1220-mwa-yukselecek-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2025\/01\/aksa-enerjinin-ozbekistandaki-kurulu-gucu-1220-mwa-yukselecek-1-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><p id=\"caption-attachment-193855\" class=\"wp-caption-text\">Aksa Enerji Y\u00f6netim Kurulu Ba\u015fkan\u0131 ve CEO\u2019su Cemil Kazanc\u0131<\/p><\/div>\n<p><strong>Aksa Enerji Y\u00f6netim Kurulu Ba\u015fkan\u0131 ve CEO\u2019su Cemil Kazanc\u0131<\/strong>, <em>\u201c7 ay gibi rekor bir s\u00fcrede devreye ald\u0131\u011f\u0131m\u0131z Talimercan santralimiz, Aksa Enerji\u2019nin yenilik\u00e7i yakla\u015f\u0131m\u0131n\u0131n ve g\u00fc\u00e7l\u00fc operasyonel yetkinli\u011finin somut bir g\u00f6stergesidir. Bu proje ile enerji g\u00fcvenli\u011fine hizmet ederken ayn\u0131 zamanda b\u00f6lgenin ekonomik ve sosyal kalk\u0131nmas\u0131na da katk\u0131 sa\u011fl\u0131yoruz. Aksa Enerji olarak 2030 Global Stratejimiz do\u011frultusunda s\u00fcrd\u00fcr\u00fclebilir y\u00fcksek b\u00fcy\u00fcme hedeflerimizi hayata ge\u00e7irmeye devam edece\u011fiz\u201d<\/em> dedi.<\/p>\n<p>Proje, \u00d6zbekistan Enerji Bakanl\u0131\u011f\u0131\u2019na ba\u011fl\u0131 NEGU (National Electric Grid of Uzbekistan) ile imzalanan anla\u015fma kapsam\u0131nda hayata ge\u00e7irildi. Santralin do\u011falgaz ihtiyac\u0131 ise \u00d6zbekistan H\u00fck\u00fcmeti taraf\u0131ndan bedelsiz kar\u015f\u0131lanacak. Santralde \u00fcretilecek elektrik, 25 y\u0131l boyunca ABD dolar\u0131 bazl\u0131 garantili kapasite bedeli \u00fczerinden fiyatland\u0131r\u0131lacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Aksa Enerji, \u00d6zbekistan\u2019\u0131n Talimercan \u015fehrinde 7 ay gibi k\u0131sa bir s\u00fcrede tamamlad\u0131\u011f\u0131 do\u011fal gaz kombine \u00e7evrim santralinin ilk \u00fcnitelerinde enerji \u00fcretimine ba\u015flad\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":193856,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[1571,5287,115679,115192],"views":55,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/193853"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=193853"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/193853\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/193856"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=193853"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=193853"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=193853"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}