{"id":193665,"date":"2024-12-30T14:32:22","date_gmt":"2024-12-30T11:32:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=193665"},"modified":"2024-12-30T14:37:48","modified_gmt":"2024-12-30T11:37:48","slug":"akkuyu-ngsnin-guc-unitelerinde-iki-onemli-asama-tamamlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngsnin-guc-unitelerinde-iki-onemli-asama-tamamlandi\/","title":{"rendered":"(Turkish) Akkuyu NGS&#8217;nin G\u00fc\u00e7 \u00dcnitelerinde \u0130ki \u00d6nemli A\u015fama Tamamland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/193665\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Santralin 3\u2019\u00fcnc\u00fc \u00dcnitesi\u2019nde, g\u00fc\u00e7 \u00fcnitesinin in\u015faat a\u015famas\u0131ndaki en \u00f6nemli montaj i\u015flemlerinden biri olan reakt\u00f6r\u00fcn montaj\u0131 tamamlan\u0131rken, 2\u2019nci \u00dcnitede kullan\u0131lacak yak\u0131t da ba\u015far\u0131l\u0131 bir \u015fekilde sahaya teslim edildi.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-193695\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/12\/akkuyu-ngsnin-guc-unitelerinde-iki-onemli-asama-tamamlandi-1.jpg\" alt=\"\" width=\"500\" height=\"326\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/12\/akkuyu-ngsnin-guc-unitelerinde-iki-onemli-asama-tamamlandi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/12\/akkuyu-ngsnin-guc-unitelerinde-iki-onemli-asama-tamamlandi-1-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/12\/akkuyu-ngsnin-guc-unitelerinde-iki-onemli-asama-tamamlandi-1-500x326.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/12\/akkuyu-ngsnin-guc-unitelerinde-iki-onemli-asama-tamamlandi-1-77x50.jpg 77w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Rusya Devlet N\u00fckleer Enerji Kurulu\u015fu Rosatom taraf\u0131ndan Mersin\u2019de in\u015fa edilen Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali (NGS) \u015fantiyesinde iki \u00f6nemli operasyon ger\u00e7ekle\u015ftirildi. Santralin \u0131s\u0131 montaj uzmanlar\u0131, 3\u2019\u00fcnc\u00fc G\u00fc\u00e7 \u00dcnitesi\u2019nin reakt\u00f6r bas\u0131n\u00e7 kab\u0131n\u0131 tasar\u0131m konumuna yerle\u015ftirirken, 2\u2019nci G\u00fc\u00e7 \u00dcnitesi i\u00e7in de ilk parti taze n\u00fckleer yak\u0131t sahaya teslim edildi.<\/p>\n<p>3\u2019\u00fcnc\u00fc \u00fcniteye ait reakt\u00f6r bas\u0131n\u00e7 kab\u0131<em> \u201cOpen top\u201d<\/em> teknolojisi kullan\u0131larak monte edildi. Reakt\u00f6r binas\u0131n\u0131n silindirik k\u0131sm\u0131n\u0131n a\u00e7\u0131k \u00fcst k\u0131sm\u0131ndan bas\u0131n\u00e7l\u0131 b\u00f6lgeye ekipman tedarik edilmesine yarayan<em> \u201cOpen top\u201d<\/em> teknolojisi, i\u00e7 koruma kab\u0131n\u0131n kubbe k\u0131sm\u0131n\u0131n montaj\u0131ndan \u00f6nce in\u015faat ve montaj i\u015flerinin en uygun \u015fekilde bir araya getirilmesine olanak sa\u011fl\u0131yor.<\/p>\n<p>Reakt\u00f6r bas\u0131n\u00e7 kab\u0131n\u0131n montaj\u0131n\u0131n tamamlanmas\u0131n\u0131n ard\u0131ndan, Akkuyu N\u00fckleer A.\u015e.\u2019nin yan\u0131 s\u0131ra ba\u011f\u0131ms\u0131z denetim kurulu\u015flar\u0131 T\u00fcrk Loydu ve T\u00fcrkiye N\u00fckleer D\u00fczenleme Kurumu (NDK) uzmanlar\u0131ndan olu\u015fan bir komisyon, reakt\u00f6r kab\u0131 montaj kalitesinin denetimini ger\u00e7ekle\u015ftirdi.<\/p>\n<h3>2024\u2019\u00fcn son g\u00fcnlerinde 2\u2019nci \u00dcnite i\u00e7in \u00fcretilen n\u00fckleer yak\u0131t da Akkuyu NGS sahas\u0131na ula\u015ft\u0131<\/h3>\n<p>Yak\u0131t demetleri \u00f6zel ta\u015f\u0131ma konteynerleri i\u00e7inde sahaya teslim edildi ve t\u00fcm uluslararas\u0131 n\u00fckleer g\u00fcvenlik gerekliliklerine uygun olarak tutulduklar\u0131 taze yak\u0131t depolama tesisine yerle\u015ftirildi. <strong>Akkuyu N\u00fckleer A.\u015e. Genel M\u00fcd\u00fcr\u00fc Sergey Butckikh<\/strong> konuyla ilgili yapt\u0131\u011f\u0131 a\u00e7\u0131klamada \u015funlar\u0131 s\u00f6yledi: <em>\u201c\u00d6nceki y\u0131llarda oldu\u011fu gibi 2024 y\u0131l\u0131nda da sahadaki \u00e7al\u0131\u015fmalar\u0131n dinami\u011fi \u00e7ok y\u00fcksekti. Proje plan\u0131nda \u00f6ng\u00f6r\u00fclen ana operasyonlar\u0131 ger\u00e7ekle\u015ftirdik. Akkuyu NGS&#8217;nin 3\u2019\u00fcnc\u00fc g\u00fc\u00e7 \u00fcnitesinin kalbi kuruldu, yani n\u00fckleer reakt\u00f6r kab\u0131n\u0131n montaj\u0131na ili\u015fkin kritik \u00e7al\u0131\u015fmay\u0131 ba\u015far\u0131yla tamamlad\u0131k. Sahadaki di\u011fer t\u00fcm in\u015faat ve kurulum i\u015flemlerinde oldu\u011fu gibi, reakt\u00f6r kab\u0131n\u0131n kurulumu da titiz bir haz\u0131rl\u0131k, y\u00fcksek nitelikli uzmanlar ve her a\u015famada \u00f6zel bir hassasiyet gerektirdi. Ayr\u0131ca Aral\u0131k ay\u0131nda 2\u2019inci \u00fcnite i\u00e7in ilk parti yak\u0131t\u0131 da Akkuyu NGS sahas\u0131na teslim ettik. Yak\u0131t, Akkuyu N\u00fckleer A.\u015e.&#8217;nin ilgili birimleri, \u00fcretim tesisi ve denetim makamlar\u0131 aras\u0131nda s\u0131k\u0131 bir koordinasyon alt\u0131nda, s\u0131zd\u0131rmaz konteynerler i\u00e7inde kara ve deniz yoluyla T\u00fcrkiye&#8217;ye ula\u015ft\u0131r\u0131ld\u0131. Reakt\u00f6re y\u00fcklenmeden \u00f6nce konteynerler NGS sahas\u0131ndaki taze yak\u0131t depolama tesisinde \u00f6zel ko\u015fullar alt\u0131nda tutulacak.\u201d<\/em><\/p>\n<p>Yay\u0131na Alan: Alperen ERTA\u015e &#8211;\u00a0<a href=\"mailto:alperen.ertas@enerjigazetesi.ist\" target=\"_blank\" rel=\"noopener\">alperen.ertas@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Santralin 3\u2019\u00fcnc\u00fc \u00dcnitesi\u2019nde, g\u00fc\u00e7 \u00fcnitesinin in\u015faat a\u015famas\u0131ndaki en \u00f6nemli montaj i\u015flemlerinden biri olan reakt\u00f6r\u00fcn montaj\u0131 tamamlan\u0131rken, 2\u2019nci \u00dcnitede kullan\u0131lacak yak\u0131t da ba\u015far\u0131l\u0131 [&hellip;]<\/p>\n","protected":false},"author":19,"featured_media":193694,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[115630,115631,3019,19356,5652,91292,107839],"views":18,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/193665"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=193665"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/193665\/revisions"}],"predecessor-version":[{"id":193670,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/193665\/revisions\/193670"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/193694"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=193665"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=193665"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=193665"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}