{"id":193149,"date":"2024-12-09T10:23:49","date_gmt":"2024-12-09T07:23:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=193149"},"modified":"2025-05-19T12:22:28","modified_gmt":"2025-05-19T09:22:28","slug":"kayseride-belediyenin-ges-yatirimlari-suruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kayseride-belediyenin-ges-yatirimlari-suruyor\/","title":{"rendered":"(Turkish) Kayseri&#8217;de Belediyenin GES Yat\u0131r\u0131mlar\u0131 S\u00fcr\u00fcyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/193149\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Kayseri B\u00fcy\u00fck\u015fehir Belediye Ba\u015fkan\u0131 Memduh B\u00fcy\u00fckk\u0131l\u0131\u00e7, \u00e7al\u0131\u015fmalar\u0131 devam eden r\u00fczgar enerji santrali yat\u0131r\u0131m\u0131n\u0131n ard\u0131ndan Ula\u015f\u0131m A\u015e&#8217;nin filosundaki elektrikli otob\u00fcslerin \u015farj ihtiyac\u0131n\u0131 kar\u015f\u0131lamak \u00fczere \u00e7evreci iki g\u00fcne\u015f enerji santrali (GES) yat\u0131r\u0131m\u0131na imza att\u0131klar\u0131n\u0131 belirtti.<\/h2>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-193150\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/12\/kayseri-de-elektrikli-otobuslerin-enerjisi-ges-le-karsilanacak-1877.jpg\" alt=\"\" width=\"500\" height=\"296\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/12\/kayseri-de-elektrikli-otobuslerin-enerjisi-ges-le-karsilanacak-1877.jpg 641w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/12\/kayseri-de-elektrikli-otobuslerin-enerjisi-ges-le-karsilanacak-1877-300x178.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/12\/kayseri-de-elektrikli-otobuslerin-enerjisi-ges-le-karsilanacak-1877-500x296.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/12\/kayseri-de-elektrikli-otobuslerin-enerjisi-ges-le-karsilanacak-1877-80x47.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Belediye, \u0130ldem Tramvay Park Sahas\u0131&#8217;nda <strong>600 kW kurulu g\u00fcce ve 1140 g\u00fcne\u015f paneline sahip<\/strong> GES&#8217;in kurulum \u00e7al\u0131\u015fmalar\u0131 tamamlanarak devreye al\u0131nd\u0131\u011f\u0131 ve elektrikli otob\u00fcslerin \u015farj edilmeye ba\u015flad\u0131\u011f\u0131n\u0131 ifade etti. Bu sayede <strong>y\u0131ll\u0131k 1 milyon kWh<\/strong> \u00fcretim sa\u011flanmas\u0131 bekleniyor.<\/p>\n<p>Organize Rayl\u0131 Sistem Depo ve \u0130\u015fletme Merkezi \u00e7at\u0131s\u0131nda kurulumu devam eden bir di\u011fer GES&#8217;in de gelecek haftalarda tamamlanmas\u0131n\u0131n planland\u0131\u011f\u0131n\u0131 dile getiren B\u00fcy\u00fckk\u0131l\u0131\u00e7, <strong>1200 kW kurulu g\u00fcce ve 2 bin 132 g\u00fcne\u015f paneline sahip<\/strong> projenin, <strong>y\u0131lda 2 milyon kWh<\/strong> enerji \u00fcretecek kapasitede oldu\u011funu bildirdi.<\/p>\n<p>B\u00fcy\u00fckk\u0131l\u0131\u00e7, ger\u00e7ekle\u015ftirdikleri temiz ve yenilebilir enerji yat\u0131r\u0131mlar\u0131yla ya\u015fanabilir bir Kayseri i\u00e7in gayret g\u00f6sterdiklerini ifade ederek, daha temiz, ye\u015fil ve ya\u015fanabilir bir Kayseri i\u00e7in \u00e7al\u0131\u015ft\u0131klar\u0131n\u0131 kaydetti.<\/p>\n<p><strong>Yay\u0131na Alan:<\/strong>\u00a0Emrecan Y\u00dcCEL \u2013 Enerji Sistemleri M\u00fchendisi \u2013\u00a0<strong><a href=\"mailto:emrecan.yucel@enerjigazetesi.ist\">emrecan.yucel@enerjigazetesi.ist<\/a><\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Kayseri B\u00fcy\u00fck\u015fehir Belediye Ba\u015fkan\u0131 Memduh B\u00fcy\u00fckk\u0131l\u0131\u00e7, \u00e7al\u0131\u015fmalar\u0131 devam eden r\u00fczgar enerji santrali yat\u0131r\u0131m\u0131n\u0131n ard\u0131ndan Ula\u015f\u0131m A\u015e&#8217;nin filosundaki elektrikli otob\u00fcslerin \u015farj ihtiyac\u0131n\u0131 kar\u015f\u0131lamak [&hellip;]<\/p>\n","protected":false},"author":21,"featured_media":193150,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[68,13859,63,67,1009,165,2326,227,1039,25031,105],"views":50,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/193149"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=193149"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/193149\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/193150"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=193149"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=193149"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=193149"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}