{"id":193108,"date":"2024-12-04T16:57:42","date_gmt":"2024-12-04T13:57:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=193108"},"modified":"2024-12-04T16:57:42","modified_gmt":"2024-12-04T13:57:42","slug":"enerjisa-dagitim-sirketleri-guclu-bakim-ve-yatirim-hamlelerine-devam-ediyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enerjisa-dagitim-sirketleri-guclu-bakim-ve-yatirim-hamlelerine-devam-ediyor\/","title":{"rendered":"(Turkish) Enerjisa Da\u011f\u0131t\u0131m \u015eirketleri G\u00fc\u00e7l\u00fc Bak\u0131m ve Yat\u0131r\u0131m Hamlelerine Devam Ediyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/193108\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Enerjisa Da\u011f\u0131t\u0131m \u015eirketleri Ba\u015fkent EDA\u015e, Ayeda\u015f ve Toroslar EDA\u015e sorumluluk sahas\u0131nda kesintisiz, kaliteli ve s\u00fcrd\u00fcr\u00fclebilir enerji hizmeti kapsam\u0131nda 2024 y\u0131l\u0131n\u0131n ilk 9 ay\u0131nda bak\u0131m, onar\u0131m ve yat\u0131r\u0131mlar\u0131n\u0131 s\u00fcrd\u00fcrd\u00fc.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-193110\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/12\/enerjisa-dagitim-sirketleri-guclu-bakim-ve-yatirim-hamlelerine-devam-ediyor.jpg\" alt=\"\" width=\"500\" height=\"333\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/12\/enerjisa-dagitim-sirketleri-guclu-bakim-ve-yatirim-hamlelerine-devam-ediyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/12\/enerjisa-dagitim-sirketleri-guclu-bakim-ve-yatirim-hamlelerine-devam-ediyor-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/12\/enerjisa-dagitim-sirketleri-guclu-bakim-ve-yatirim-hamlelerine-devam-ediyor-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/12\/enerjisa-dagitim-sirketleri-guclu-bakim-ve-yatirim-hamlelerine-devam-ediyor-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/12\/enerjisa-dagitim-sirketleri-guclu-bakim-ve-yatirim-hamlelerine-devam-ediyor-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Enerjisa Da\u011f\u0131t\u0131m \u015eirketleri elektrik da\u011f\u0131t\u0131m hizmeti sundu\u011fu 14 ilde 97.152 trafo ve 329.92 km hat uzunlu\u011funda kapsaml\u0131 bak\u0131m, yenileme ve yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131na devam ederken toplam 102.612 ayd\u0131nlatma armat\u00fcr\u00fcn\u00fcn bak\u0131m\u0131n\u0131 tamamlad\u0131. Ayr\u0131ca 869 trafo ve 3883 da\u011f\u0131t\u0131m merkezinin bak\u0131m\u0131n\u0131 yapt\u0131. Ayn\u0131 d\u00f6nemde 16.538 km hatt\u0131n bak\u0131m\u0131n\u0131 da ger\u00e7ekle\u015ftirerek s\u00fcrd\u00fcr\u00fclebilir enerji da\u011f\u0131t\u0131m\u0131na kakt\u0131 sa\u011flad\u0131.<\/p>\n<p>Y\u0131l\u0131n ilk 9 ay\u0131nda yat\u0131r\u0131m hedeflerini ba\u015far\u0131yla ger\u00e7ekle\u015ftiren Enerjisa Da\u011f\u0131t\u0131m \u015eirketleri m\u00fc\u015fterilerine daha kesintisiz ve kaliteli enerji verebilmek ad\u0131na 604.861 km yeni kablo d\u00f6\u015feme ve 30.994 yeni ayd\u0131nlatma armat\u00fcr\u00fcn\u00fcn montaj\u0131n\u0131 tamamlad\u0131. Ayr\u0131ca 2743 yeni elektrik panosu ve 971 trafo kurarak altyap\u0131s\u0131n\u0131 g\u00fc\u00e7lendirdi.<\/p>\n<p>Elektrik da\u011f\u0131t\u0131m sekt\u00f6r\u00fcn\u00fcn dijital d\u00f6n\u00fc\u015f\u00fcm\u00fcne \u00f6nc\u00fcl\u00fck eden \u015firket, \u015eebeke Y\u00f6netim Sistemi, Filo Bildirim Portal &amp; Platformlu Ara\u00e7 Kontrolleri, CBS ile Enerji M\u00fcsaadesi Verilmesi, Dok\u00fcman Y\u00f6netim Sistemi Uygulama Projesi, EPDK Deprem ve Do\u011fal Afet Projesi ve Tesisat\u0131n Ya\u015fam Ser\u00fcveni ba\u015fta olmak \u00fczere yakla\u015f\u0131k 52 milyon TL b\u00fct\u00e7eyle \u00e7ok say\u0131da dijital projeyi hayata ge\u00e7irdi.<\/p>\n<p>Operasyonel i\u015f s\u00fcre\u00e7lerini daha verimli hale getirebilmek i\u00e7in dijital d\u00f6n\u00fc\u015f\u00fcm\u00fcne a\u011f\u0131rl\u0131k veren Enerjisa Da\u011f\u0131t\u0131m \u015eirketleri kullan\u0131c\u0131 memnuniyetini en \u00fcst seviyeye \u00e7\u0131karmak i\u00e7in \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerjisa Da\u011f\u0131t\u0131m \u015eirketleri Ba\u015fkent EDA\u015e, Ayeda\u015f ve Toroslar EDA\u015e sorumluluk sahas\u0131nda kesintisiz, kaliteli ve s\u00fcrd\u00fcr\u00fclebilir enerji hizmeti kapsam\u0131nda 2024 y\u0131l\u0131n\u0131n ilk 9 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":193110,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[2320,6592,19261,49286,5779,3558,1286],"views":38,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/193108"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=193108"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/193108\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/193110"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=193108"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=193108"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=193108"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}