{"id":192742,"date":"2024-11-04T17:34:29","date_gmt":"2024-11-04T14:34:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=192742"},"modified":"2024-11-04T17:36:08","modified_gmt":"2024-11-04T14:36:08","slug":"yeka-ges-2024-sartnamesi-yayimlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yeka-ges-2024-sartnamesi-yayimlandi\/","title":{"rendered":"(Turkish) YEKA GES 2024 \u015eartnamesi Yay\u0131mland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/192742\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 (ETKB) bug\u00fcnk\u00fc Resm\u00ee Gazete\u2019de yay\u0131mlanan YEKA GES-2024 yar\u0131\u015fmalar\u0131 i\u00e7in \u015fartnameyi yay\u0131mlad\u0131.<strong><sup><a href=\"https:\/\/enerji.gov.tr\/duyuru-detay?id=30486\" target=\"_blank\" rel=\"noreferrer noopener\">[1]<\/a><\/sup><\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-192744\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/11\/yeka-ges-2024-sartnamesi-yayimlandi.jpg\" alt=\"\" width=\"500\" height=\"353\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/11\/yeka-ges-2024-sartnamesi-yayimlandi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/11\/yeka-ges-2024-sartnamesi-yayimlandi-300x212.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/11\/yeka-ges-2024-sartnamesi-yayimlandi-500x353.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/11\/yeka-ges-2024-sartnamesi-yayimlandi-71x50.jpg 71w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Toplamda 800 MWe kapasite hakk\u0131 i\u00e7in alt\u0131 ayr\u0131 b\u00f6lge i\u00e7in yap\u0131lacak yar\u0131\u015fmalarda uygulanacak ilkelerden \u00f6ne \u00e7\u0131kanlar <span style=\"text-decoration: underline;\">\u015fu \u015fekilde olacak;<\/span><\/p>\n<p>&#8211; Yar\u0131\u015famalarda birim kilovatsaat elektrik enerjisi al\u0131m tavan fiyat\u0131 5,50 ABD Dolar\u0131-cent\/kWh, taban fiyat\u0131 3,25 ABD Dolar\u0131-cent\/kWh olacak,<\/p>\n<p>&#8211; Yar\u0131\u015fmaya 27 Ocak 2025 tarihine kadar ba\u015fvuru yap\u0131labilecek,<\/p>\n<p>&#8211; Kapal\u0131 zarf usul\u00fc al\u0131nacak mali tekliflerden belirlenen azami be\u015f adet en d\u00fc\u015f\u00fck mali teklif sahibi aras\u0131nda a\u00e7\u0131k eksiltme esas\u0131na dayal\u0131 yar\u0131\u015fma yap\u0131lacak,<\/p>\n<p>&#8211; Teklifler i\u00e7erisinde e\u015fitlik olmas\u0131 durumunda e\u015fit mali teklif sahiplerinin tamam\u0131 yar\u0131\u015fmaya dahil edilecek,<\/p>\n<p>&#8211; Teklif edilmi\u015f olan en d\u00fc\u015f\u00fck mali teklif esas al\u0131nmak suretiyle s\u0131rayla Yar\u0131\u015fmac\u0131lar taraf\u0131ndan her defas\u0131nda teklif edilen bir \u00f6nceki en d\u00fc\u015f\u00fck fiyattan eksiltme yap\u0131larak taban fiyat verilinceye kadar yar\u0131\u015fma yap\u0131lacak,<\/p>\n<p>&#8211; Yar\u0131\u015fman\u0131n elektrik al\u0131m fiyat\u0131na dayal\u0131 a\u015famas\u0131 taban fiyat \u00fczerinde en d\u00fc\u015f\u00fck ve son teklife ula\u015f\u0131l\u0131nca sonland\u0131r\u0131lacak,<\/p>\n<p>&#8211; Taban fiyat\u0131n ikinci bir Yar\u0131\u015fmac\u0131 taraf\u0131ndan teklif edilmesi durumunda, ikinci Yar\u0131\u015fmac\u0131 MW ba\u015f\u0131na en az 10 bin ABD Dolar\u0131 \u00f6demeyi kabul etmi\u015f say\u0131lacak ve MW ba\u015f\u0131na katk\u0131 pay\u0131 a\u00e7\u0131k art\u0131rma y\u00f6ntemine ge\u00e7ilecek,<\/p>\n<p>&#8211; Komisyon gerekli g\u00f6rmesi halinde fiyat eksiltme ve katk\u0131 pay\u0131 artt\u0131rma aral\u0131\u011f\u0131 belirleyebilecek,<\/p>\n<p>&#8211; Yar\u0131\u015fma en y\u00fcksek katk\u0131 pay\u0131 teklifine ula\u015f\u0131l\u0131nca sonland\u0131r\u0131lacak,<\/p>\n<p>&#8211; Yar\u0131\u015fmay\u0131 kazanan yat\u0131r\u0131mc\u0131 Bakan Onay\u0131\u2019n\u0131n tebli\u011fini takiben Enerji \u0130\u015fleri Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan S\u00f6zle\u015fme imzalamak \u00fczere davet edilecek,<\/p>\n<p>&#8211; S\u00f6zle\u015fme\u2019nin imzalanmas\u0131 i\u00e7in davet edilen Yar\u0131\u015fmac\u0131n\u0131n, davet edildi\u011fi yaz\u0131n\u0131n tebli\u011f tarihinden itibaren azami 30 g\u00fcn i\u00e7erisinde S\u00f6zle\u015fme\u2019yi imzalamas\u0131 gerekecek,<\/p>\n<p>&#8211; Yar\u0131\u015fmac\u0131n\u0131n s\u00f6zle\u015fme imzalamay\u0131 davet edilmesini takip eden 20 i\u015f g\u00fcn\u00fc i\u00e7erisinde, taahh\u00fct etti\u011fi katk\u0131 pay\u0131n\u0131 EP\u0130A\u015e\u2019a, \u00f6deme tarihindeki T\u00fcrkiye Cumhuriyet Merkez Bankas\u0131 d\u00f6viz sat\u0131\u015f kuru \u00fczerinden \u00f6demesi gerekecek,<\/p>\n<p>&#8211; \u00d6denen tutar EP\u0130A\u015e taraf\u0131ndan 1 y\u0131l i\u00e7erisinde ayl\u0131k e\u015fit taksitler halinde YEKDEM kapsam\u0131nda de\u011ferlendirilecek,<\/p>\n<p>&#8211; Katk\u0131 pay\u0131n\u0131n s\u00fcresi i\u00e7erisinde \u00f6denmemesi durumunda teminat irat kaydedilerek s\u0131ras\u0131yla en uygun ikinci ve \u00fc\u00e7\u00fcnc\u00fc teklif sahibi Yar\u0131\u015fmac\u0131\u2019ya katk\u0131 pay\u0131n\u0131 \u00f6demesi i\u00e7in 20 i\u015f g\u00fcn\u00fc s\u00fcre verilecek,<\/p>\n<p>&#8211; Projeler i\u00e7in \u00f6nlisans s\u00fcresi azami 24 ay olacak,<\/p>\n<p>&#8211; \u0130n\u015faat s\u00fcresi Lisans\u2019\u0131n al\u0131nd\u0131\u011f\u0131 tarihten itibaren 100 MWe alt\u0131 kapasiteye sahip GES\u2019ler i\u00e7in azami 24 ay, 100 MWe \u00fcst\u00fc kapasiteye sahip GES\u2019ler i\u00e7in azami 36 ay olacak,<\/p>\n<p>&#8211; Lisansta yer alan kapasitenin in\u015faat s\u00fcresi i\u00e7erisinde tamamlanamamas\u0131 durumunda Yar\u0131\u015fmay\u0131 Kazanan taraf\u0131ndan talep edilmesi halinde in\u015faat s\u00fcresi 12 aya kadar uzat\u0131labilecek fakat S\u00f6zle\u015fmede yer alan ceza uygulanacak,<\/p>\n<p>&#8211; \u0130n\u015faat\u0131n 12 ay i\u00e7erisinde tamamlanamamas\u0131 durumunda Bakanl\u0131k taraf\u0131ndan S\u00f6zle\u015fme feshedilerek teminat irat kaydedilecek,<\/p>\n<p>&#8211; GES\u2019te kurulumu ger\u00e7ekle\u015ftirilecek g\u00fcne\u015f mod\u00fcllerinin asgari %75 yerlilik oran\u0131 ta\u015f\u0131mas\u0131 gerekecek. Bu mod\u00fcllerin serbest b\u00f6lgeler hari\u00e7 olmak \u00fczere, T\u00fcrkiye\u2019de kurulu fabrikalarda \u00fcretilmesi veya serbest b\u00f6lgeler d\u0131\u015f\u0131ndaki yerli imalat\u00e7\u0131lardan tedarik edilmesi gerekecek,<\/p>\n<p>&#8211; G\u00fcne\u015f Mod\u00fcl\u00fc\u2019n\u00fcn \u00fcretiminde kullan\u0131lan g\u00fcne\u015f h\u00fccrelerinde yerli \u00fcretim \u015fart\u0131 aranacak ve h\u00fccrelerin, en az ham waferdan (herhangi bir kimyasal i\u015fleme tabi tutulmam\u0131\u015f gri wafer) sonraki i\u015flemler uygulanmak suretiyle \u00fcretilmesi gerekecek,<\/p>\n<p>&#8211; GES\u2019lerde kullan\u0131lcak do\u011fru ak\u0131m (DC) g\u00fcne\u015f kablolar\u0131nda, takip sistemi dahil ta\u015f\u0131y\u0131c\u0131 yap\u0131larda ve invert\u00f6rlerde asgari %51\u2019lik yerlilik \u015fart\u0131 aranacak,<\/p>\n<p>Yerlilik \u015fart\u0131 ta\u015f\u0131yan invert\u00f6rlerin kullan\u0131lmas\u0131 durumunda elektrik al\u0131m s\u00fcresi\u2019nin ilk 5 y\u0131l\u0131nda birim elektrik enerjisi al\u0131m fiyat\u0131na 0,3 ABD Dolar\u0131-cent\/kWh ilave edilecek,<\/p>\n<p>&#8211; Bunlar d\u0131\u015f\u0131nda 5346 Yenilenebilir Enerji Kaynaklar\u0131n\u0131n Elektrik Enerjisi \u00dcretimi Ama\u00e7l\u0131 Kullan\u0131m\u0131na \u0130li\u015fkin Kanun kapsam\u0131nda ba\u015fka bir yerli \u00fcr\u00fcn deste\u011fi uygulanmayacak,<\/p>\n<p>&#8211; Yar\u0131\u015fmay\u0131 Kazanan yat\u0131r\u0131mc\u0131, GES\u2019in santral sahas\u0131nda ve ayn\u0131 \u00f6l\u00e7\u00fcm noktas\u0131nda olmak \u00fczere ve Lisans\u2019ta yer alan elektriksel kurulu g\u00fcc\u00fc a\u015fmayacak \u015fekilde GES\u2019te \u00fcretilen elektrik enerjisinin depolanmas\u0131na y\u00f6nelik olarak GES\u2019e b\u00fct\u00fcnle\u015fik elektrik depolama \u00fcnitesi kurabilecek,<\/p>\n<p>&#8211; Fakat s\u00f6zle\u015fme imza tarihinden itibaren Serbest Piyasada Sat\u0131\u015f S\u00fcresi boyunca depolama \u00fcnitesinde, kurulacak olan GES d\u0131\u015f\u0131nda \u015febeke dahil ba\u015fkaca kaynaklardan elektrik enerjisi depolanamayacak,<\/p>\n<p>&#8211; Depolanan elektrik enerjisi \u015fartnamenin 8.2.1. maddesi kapsam\u0131nda serbest piyasada sat\u0131\u015f ve elektrik al\u0131m garantisi d\u00f6neminde uygulanacak fiyatlardan yararlanabilecek,<\/p>\n<p>&#8211; GES\u2019in ilgili \u015febeke i\u015fletmecisi taraf\u0131ndan belirlenecek ba\u011flant\u0131 noktas\u0131na kadar ihtiya\u00e7 duyulan enerji iletim\/da\u011f\u0131t\u0131m tesisleri ve iletim\/da\u011f\u0131t\u0131m hatlar\u0131 yat\u0131r\u0131mlar\u0131, 6446 say\u0131l\u0131 Elektrik Piyasas\u0131 Kanunu kapsam\u0131nda yap\u0131lacak.<\/p>\n<p><strong>[1]\u00a0<a href=\"https:\/\/enerji.gov.tr\/duyuru-detay?id=30486\" target=\"_blank\" rel=\"noopener\">YEKA GES-2024 Yar\u0131\u015fmalar\u0131na \u0130li\u015fkin Duyuru<\/a><\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 (ETKB) bug\u00fcnk\u00fc Resm\u00ee Gazete\u2019de yay\u0131mlanan YEKA GES-2024 yar\u0131\u015fmalar\u0131 i\u00e7in \u015fartnameyi yay\u0131mlad\u0131.[1] Toplamda 800 MWe kapasite hakk\u0131 i\u00e7in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":192744,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[1972,1635,2326,2569,115474,115473],"views":74,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/192742"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=192742"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/192742\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/192744"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=192742"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=192742"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=192742"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}