{"id":192689,"date":"2024-10-28T17:57:15","date_gmt":"2024-10-28T14:57:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=192689"},"modified":"2024-10-28T17:57:15","modified_gmt":"2024-10-28T14:57:15","slug":"bakan-bayraktar-2035-res-ges-yatirim-hedefimiz-80-milyar-dolar","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bakan-bayraktar-2035-res-ges-yatirim-hedefimiz-80-milyar-dolar\/","title":{"rendered":"(Turkish) Bakan Bayraktar: &#8220;2035 Res Ges Yat\u0131r\u0131m Hedefimiz 80 Milyar Dolar&#8221;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/192689\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>T.C.Enerji ve Tabii Kaynaklar Bakan\u0131 Alparslan Bayraktar &#8220;yenilenebilir enerji ve enerji d\u00f6n\u00fc\u015f\u00fcm\u00fc 2035 yol haritas\u0131&#8221;n\u0131 a\u00e7\u0131klamak \u00fczere \u00f6zel sekt\u00f6r temsilcileri, ilgili STK&#8217;lar, uluslararas\u0131 \u015firketlerin y\u00f6neticileri, b\u00fcrokratlar ve bas\u0131n mensuplar\u0131 ile \u0130stanbul Cumhurba\u015fkanl\u0131\u011f\u0131 Dolmabah\u00e7e \u00c7al\u0131\u015fma Ofisi&#8217;nde bir araya geldi. R\u00fczgar enerjisi ad\u0131na T\u00dcREB (T\u00fcrkiye R\u00fczgar Enerjisi Birli\u011fi) Ba\u015fkan\u0131 \u0130brahim Erden ve Y\u00f6netim Kurulu\u2019nun kat\u0131l\u0131m g\u00f6sterdi\u011fi toplant\u0131da 2035 y\u0131l\u0131 RES-GES kurulu g\u00fc\u00e7 hedefi 120.000 MW, 80 milyar dolar yat\u0131r\u0131m a\u00e7\u0131kland\u0131\u2026<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-192691\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/10\/bakan-bayraktar-2035-res-ges-yatirim-hedefimiz-80-milyar-dolar.jpg\" alt=\"\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/10\/bakan-bayraktar-2035-res-ges-yatirim-hedefimiz-80-milyar-dolar.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/10\/bakan-bayraktar-2035-res-ges-yatirim-hedefimiz-80-milyar-dolar-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/10\/bakan-bayraktar-2035-res-ges-yatirim-hedefimiz-80-milyar-dolar-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/10\/bakan-bayraktar-2035-res-ges-yatirim-hedefimiz-80-milyar-dolar-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/10\/bakan-bayraktar-2035-res-ges-yatirim-hedefimiz-80-milyar-dolar-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Bakan Bayraktar, toplant\u0131da 11 y\u0131l\u0131 kapsayan d\u00f6nemde T\u00fcrkiye&#8217;nin enerji d\u00f6n\u00fc\u015f\u00fcm\u00fc ve yenilenebilir enerji vizyonunu payla\u015ft\u0131. Her y\u0131l en az 2.000 MW YEKA, deniz\u00fcst\u00fc RES 5.000 MW, uluslararas\u0131 projeler, mevcut santraller i\u00e7in hibrit kapasite, ayn\u0131 ba\u011flant\u0131 noktas\u0131nda \u015febekeye enerji vermeksizin \u00f6z t\u00fcketim kapasitesi stratejileri ile 2035 y\u0131l\u0131 hedefi olan 120.000 MW g\u00fc\u00e7 hedefine ula\u015f\u0131laca\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131.<\/p>\n<p>Yenilenebilir enerji g\u00fc\u00e7 oran\u0131 2015 y\u0131l\u0131nda 31.610 MW iken 2024 y\u0131l\u0131nda 67.400 MW. Bunun 12.400 MW RES olu\u015fturuyor. Bunlara ek olarak 2024\u2019de; <strong>Sivas<\/strong>, <strong>Edirne<\/strong> ve <strong>K\u0131rklareli\u00a0<\/strong>ba\u015fta olmak \u00fczere toplamda yakla\u015f\u0131k 1.200 MW kapasiteli projelerin yap\u0131laca\u011f\u0131 a\u00e7\u0131kland\u0131. Yenilenebilir enerji stratejisini \u015fekillendirecek \u00fc\u00e7 ana hedefin ise; <strong>arz g\u00fcvenli\u011fi, enerji ba\u011f\u0131ms\u0131zl\u0131\u011f\u0131 ve 2053 s\u0131f\u0131r net hedefi<\/strong> oldu\u011funu, bunlar\u0131 takip eden 3 temel unsurun reform s\u00fcre\u00e7leri, kaynak \u00e7e\u015fitlili\u011fi ve dijitalle\u015fmenin \u00f6nemini ve yenilenebilir enerji ve yerlile\u015fme, do\u011fal gaz ve petrol \u00fcretimi, n\u00fckleer enerji, enerji verimlili\u011fi, hidrojen ve yeni teknolojilerin de \u00f6ncelikli alanlar oldu\u011funun alt\u0131n\u0131 \u00e7izdi.<\/p>\n<p>Bunlara ek olarak a\u00e7\u0131klanan Ye\u015fil \u0130letim Altyap\u0131s\u0131na g\u00f6re; 2024\u2019te 75.464 km olan AC \u015febeke hatt\u0131n\u0131n, 2035&#8217;te 90.500 km\u2019ye \u00e7\u0131kaca\u011f\u0131n\u0131n, 40 MW HVDC koridoru ile birlikte, 14.700 km HVDC hat ve 40 adet HVDC d\u00f6n\u00fc\u015ft\u00fcr\u00fcc\u00fc merkezi ile b\u00fcy\u00fck bir altyap\u0131n\u0131n hedeflendi\u011finin de bilgisi verildi.<\/p>\n<p><strong>T\u00dcREB Ba\u015fkan\u0131 \u0130brahim Erden:\u00a0<\/strong><em>\u201cYenilenebilir enerji kaynaklar\u0131n\u0131n kullan\u0131m\u0131 \u00fclkeler i\u00e7in b\u00fcy\u00fck \u00f6nem arz ediyor. Say\u0131n Bakan\u0131m\u0131z\u0131n yapt\u0131\u011f\u0131 a\u00e7\u0131klamalar hepimizi mutlu etti. Sekt\u00f6r\u00fcm\u00fcz ad\u0131na yap\u0131lacak bu yat\u0131r\u0131mlar \u00fclkemizin global arenada yenilenebilir enerji kaynaklar\u0131 a\u00e7\u0131s\u0131ndan s\u00f6z sahibi olmas\u0131 noktas\u0131nda \u00f6nemli bir ad\u0131m sa\u011flayacakt\u0131r\u201d<\/em> a\u00e7\u0131klamas\u0131nda bulundu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T.C.Enerji ve Tabii Kaynaklar Bakan\u0131 Alparslan Bayraktar &#8220;yenilenebilir enerji ve enerji d\u00f6n\u00fc\u015f\u00fcm\u00fc 2035 yol haritas\u0131&#8221;n\u0131 a\u00e7\u0131klamak \u00fczere \u00f6zel sekt\u00f6r temsilcileri, ilgili STK&#8217;lar, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":192691,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,50],"tags":[115454,1564,2326,2569,474,231,105],"views":29,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/192689"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=192689"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/192689\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/192691"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=192689"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=192689"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=192689"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}