{"id":192141,"date":"2024-10-01T17:03:49","date_gmt":"2024-10-01T14:03:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=192141"},"modified":"2024-10-01T17:04:12","modified_gmt":"2024-10-01T14:04:12","slug":"astor-enerji-yeni-fabrikasi-ile-uretim-kapasitesini-2-katina-cikaracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/astor-enerji-yeni-fabrikasi-ile-uretim-kapasitesini-2-katina-cikaracak\/","title":{"rendered":"(Turkish) &#8217;Astor Enerji&#8217; Yeni Fabrikas\u0131 ile \u00dcretim Kapasitesini 2 Kat\u0131na \u00c7\u0131karacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/192141\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>T\u00fcrkiye\u2019nin yerli lider transformat\u00f6r ve anahtarlama \u00fcr\u00fcnleri \u00fcreticisi Astor Enerji, Ankara ASO 2. OSB geni\u015fleme alan\u0131nda yer alan 228.660 m2 arsas\u0131 \u00fczerinde birinci faz yat\u0131r\u0131m kapsam\u0131nda kapal\u0131 alan\u0131 toplam 91.436,62 m2 olan fabrika in\u015faat \u00e7al\u0131\u015fmalar\u0131na ba\u015flad\u0131\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-192144\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/10\/astor-enerji-yeni-fabrikasi-ile-uretim-kapasitesini-2-katina-cikaracak-1.jpg\" alt=\"\" width=\"500\" height=\"306\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/10\/astor-enerji-yeni-fabrikasi-ile-uretim-kapasitesini-2-katina-cikaracak-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/10\/astor-enerji-yeni-fabrikasi-ile-uretim-kapasitesini-2-katina-cikaracak-1-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/10\/astor-enerji-yeni-fabrikasi-ile-uretim-kapasitesini-2-katina-cikaracak-1-500x306.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/10\/astor-enerji-yeni-fabrikasi-ile-uretim-kapasitesini-2-katina-cikaracak-1-80x50.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>\u0130n\u015faat\u0131 ba\u015flanan yeni fabrikan\u0131n tamamlanmas\u0131yla anahtarlama \u00fcr\u00fcnleri \u00fcretim kapasitesi 2 kat\u0131na \u00e7\u0131kacak ve planlanan yeni \u00fcr\u00fcnlerin \u00fcretimleri i\u00e7in gerekli \u00fcretim altyap\u0131s\u0131 tamamlanm\u0131\u015f olacak. Bu sayede mevcut fabrikada yer alan anahtarlama \u00fcr\u00fcnleri \u00fcretim alanlar\u0131 transformat\u00f6r \u00fcretim kapasite art\u0131\u015f\u0131 i\u00e7in kullan\u0131larak mevcut fabrikada sadece transformat\u00f6r \u00fcretimi yap\u0131larak transformat\u00f6r \u00fcretim kapasitesi de yakla\u015f\u0131k 2 kat\u0131na \u00e7\u0131kar\u0131lmas\u0131 planlanmakta. 2025 y\u0131l\u0131 ikinci yar\u0131s\u0131nda tamamlanmas\u0131 planlanan yat\u0131r\u0131m ile \u00fcretim kapasite art\u0131\u015f\u0131na ba\u011fl\u0131 olarak ilk fazda yakla\u015f\u0131k 600 ki\u015filik istihdam art\u0131\u015f\u0131 sa\u011flanacak.<\/p>\n<p>Elektrik enerji talebinin g\u00fcn ge\u00e7tik\u00e7e artmas\u0131, yenilenebilir elektrik enerji kaynaklar\u0131 kullan\u0131m\u0131n\u0131n artt\u0131r\u0131lmas\u0131 \u00fclkemizin d\u0131\u015fa ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n\u0131 azaltmak i\u00e7in en \u00f6nemli hedeflerinden biri olmas\u0131 ve mevcut elektrik iletim ve da\u011f\u0131t\u0131m \u015febekelerinde kullan\u0131lan \u00fcr\u00fcnlerin verimli \u00fcr\u00fcnlerle de\u011fi\u015fim ihtiyac\u0131 Astor marka \u00fcr\u00fcnlere talebi artt\u0131rd\u0131. \u00d6zellikle orta ve y\u00fcksek gerilim anahtarlama \u00fcr\u00fcnleri elektrik enerjisinin \u00fcretimi, iletimi ve da\u011f\u0131t\u0131m\u0131nda kritik \u00f6neme sahip. Astor Enerji, \u00f6n\u00fcm\u00fczdeki y\u0131llarda artarak devam etmesi tahmin edilen ihtiya\u00e7lar i\u00e7in Astor marka \u00fcr\u00fcnler ile katk\u0131 sa\u011flamay\u0131 planl\u0131yor.<\/p>\n<p>Anahtarlama \u00dcr\u00fcnleri\u2019nin yeni fabrikaya ta\u015f\u0131nmas\u0131 ile birlikte \u00fcretim kapasitesinin 2 kat\u0131na \u00e7\u0131kar\u0131lmas\u0131 hedefleniyor. Buna ek olarak anahtarlama \u00fcr\u00fcnlerinin \u00fcr\u00fcn yelpazesine hem orta gerilim hem de y\u00fcksek gerilim seviyesinde yeni \u00fcr\u00fcnler eklenece\u011fi \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>Konuya ili\u015fkin de\u011ferlendirmelerde bulunan <strong>Astor Enerji Genel M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 Dr. Fatih I\u015f\u0131k<\/strong> \u015f\u00f6yle konu\u015ftu:<em> \u201cElektrik enerjisinin oldu\u011fu her yerde kullan\u0131lan transformat\u00f6r ve anahtarlama \u00fcr\u00fcnleri \u00fcretiminde \u00fclkemizin en b\u00fcy\u00fck yerli \u00fcreticisiyiz. Ayn\u0131 zamanda \u00fcretimlerimizin yakla\u015f\u0131k y\u00fczde 40\u2019\u0131n\u0131da ihra\u00e7 ediyoruz. Elektrik enerji sekt\u00f6r\u00fcnde talepler yurt d\u0131\u015f\u0131nda da \u00e7ok fazla. Termin s\u00fcreleri olduk\u00e7a uzun. Astor, bu talebi f\u0131rsata \u00e7evirmeyi planl\u0131yor ve bu gerek\u00e7e ile yat\u0131r\u0131mlar\u0131n\u0131 \u015fekillendiriyor. Birinci faz yat\u0131r\u0131m\u0131m\u0131z sayesinde t\u00fcm \u00fcr\u00fcn \u00e7e\u015fitlerimizde kapasitemizi yakla\u015f\u0131k 2 kat\u0131na \u00e7\u0131karmay\u0131 hedefliyoruz. Ayr\u0131ca yeni \u00fcr\u00fcn \u00e7e\u015fitleri ile de sekt\u00f6r\u00fcn ihtiya\u00e7lar\u0131na yerli \u00e7\u00f6z\u00fcmler \u00fcretmeyi hedefliyoruz. G\u00fcn\u00fcm\u00fczde kullan\u0131lan en son teknoloji makine, sistem ve ekipman yat\u0131r\u0131mlar\u0131m\u0131z ile ciromuzu, ihracat\u0131m\u0131z\u0131 ve verimli\u011fimizi artt\u0131rmay\u0131 hedefliyoruz.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin yerli lider transformat\u00f6r ve anahtarlama \u00fcr\u00fcnleri \u00fcreticisi Astor Enerji, Ankara ASO 2. OSB geni\u015fleme alan\u0131nda yer alan 228.660 m2 arsas\u0131 \u00fczerinde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":192143,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[105221,105874,115262,84616,111282],"views":42,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/192141"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=192141"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/192141\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/192143"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=192141"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=192141"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=192141"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}