{"id":192130,"date":"2024-09-30T19:23:17","date_gmt":"2024-09-30T16:23:17","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=192130"},"modified":"2024-09-30T19:23:41","modified_gmt":"2024-09-30T16:23:41","slug":"meski%cc%87-4-tesisinde-gunes-enerjisi-santrallerini-devreye-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/meski%cc%87-4-tesisinde-gunes-enerjisi-santrallerini-devreye-aldi\/","title":{"rendered":"(Turkish) &#8217;MESKI\u0307&#8217; 4 Tesisinde G\u00fcne\u015f Enerjisi Santrallerini Devreye Ald\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/192130\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Mersin B\u00fcy\u00fck\u015fehir Belediyesi Mersin Su ve Kanalizasyon \u0130daresi (MESK\u0130) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, \u00c7at\u0131 Tipi G\u00fcne\u015f Enerjisi Santralleri (GES) projelerinin 2. Etab\u0131n\u0131 bitirdi. \u00c7al\u0131\u015fma kapsam\u0131nda 4 adet tesisin daha enerji ihtiyac\u0131, yenilenebilir enerjiden kar\u015f\u0131lanacak. B\u00f6ylece, ilk etapla birlikte yakla\u015f\u0131k 2 bin 513 hanenin y\u0131ll\u0131k elektrik ihtiyac\u0131na e\u015f de\u011fer enerji kar\u015f\u0131lanm\u0131\u015f olacak.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-192134\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/09\/meski.jpg\" alt=\"\" width=\"500\" height=\"281\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/09\/meski.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/09\/meski-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/09\/meski-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/09\/meski-80x45.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<h3><strong>Toplam 3 Bin 400 Ton Karbondioksit Sal\u0131n\u0131m\u0131 Engellenmi\u015f Oluyor<\/strong><\/h3>\n<p>MESK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, Mersin B\u00fcy\u00fck\u015fehir Belediye Ba\u015fkan\u0131 Vahap Se\u00e7er\u2019in \u00f6nc\u00fcl\u00fc\u011f\u00fcnde do\u011fa dostu \u00e7al\u0131\u015fmalar\u0131 hayata ge\u00e7irmeye devam ediyor. Makine \u0130kmal, Toroslar D4, Toroslar D5 ve Karaduvar At\u0131k Su Ar\u0131tma Santrallerinde 550 W\u2019l\u0131k paneller kullan\u0131ld\u0131. Sadece 2. etapta yakla\u015f\u0131k 870 konutun y\u0131ll\u0131k elektrik ihtiyac\u0131na e\u015f de\u011fer enerjiyi kar\u015f\u0131layabilecek 2 milyon 400 kilowatt saat elektrik \u00fcretmeyi \u00f6ng\u00f6ren MESK\u0130, kendi enerjisini \u00fcretmeye devam edecek. 1. ve 2. Etapta yap\u0131lan santrallerle birlikte toplam 3 bin 400 ton karbondioksit sal\u0131n\u0131m\u0131 da engellenmi\u015f oluyor.<\/p>\n<h3><strong>MESKI\u0307\u2019nin Kurulu G\u00fcc\u00fcn\u00fcn Y\u00fczde 5\u2019i G\u00fcne\u015f Enerjisinden Kar\u015f\u0131lan\u0131yor<\/strong><\/h3>\n<p>\u0130lk etapta yap\u0131lan santraller ile MESK\u0130\u2019nin y\u0131ll\u0131k toplam kurulu g\u00fcc\u00fcn\u00fcn y\u00fczde 3\u2019\u00fc kar\u015f\u0131lan\u0131rken, 2. Etapta yap\u0131lan Makine \u0130kmal, Toroslar D4, Toroslar D5 ve Karaduvar At\u0131k Su Ar\u0131tma Santralleriyle kurulu g\u00fcc\u00fcn y\u00fczde 2\u2019si olmak \u00fczere toplam 7 santralle birlikte MESK\u0130\u2019nin kurulu g\u00fcc\u00fcn\u00fcn y\u00fczde 5\u2019i g\u00fcne\u015f enerjisinden kar\u015f\u0131lan\u0131yor.<\/p>\n<h3><strong>Apc\u0327in: \u201cKaraduvar At\u0131k Su Ar\u0131tma Tesisi Havuz \u00dcst\u00fc GES Projesi, T\u00fcrkiye\u2019de Bu Alanda Yap\u0131lan \u0130kinci Proje\u201d<\/strong><\/h3>\n<p><strong>MESK\u0130 Elektrik Merkezleri Dairesi Ba\u015fkan\u0131 Hasan Ap\u00e7in<\/strong>; <em>\u201cYenilenebilir enerji kaynaklar\u0131 yat\u0131r\u0131mlar\u0131na devam eden \u0130daremiz, \u00c7at\u0131 Tipi G\u00fcne\u015f Enerjisi Santralleri projelerinin 2. etab\u0131n\u0131 bitirmi\u015f bulunmaktad\u0131r. Karaduvar At\u0131k Su Ar\u0131tma Tesisi havuz \u00fcst\u00fc GES projesi, T\u00fcrkiye\u2019de bu alanda yap\u0131lan ikinci projedir. Toplamda 4 farkl\u0131 lokasyonda devreye ald\u0131\u011f\u0131m\u0131z 2. etap projemiz kapsam\u0131 i\u00e7inde bulunan Karaduvar At\u0131k Su Ar\u0131tma Tesisi, 0.99 mWp g\u00fcce sahiptir. B\u00f6ylece ilk etapla birlikte yakla\u015f\u0131k 2 bin 513 hanenin y\u0131ll\u0131k elektrik ihtiyac\u0131na e\u015f de\u011fer enerji, g\u00fcne\u015f enerjisi ile sa\u011flanm\u0131\u015f olacakt\u0131r\u201d<\/em> dedi.<\/p>\n<p>Kaynak:\u00a0<a href=\"https:\/\/www.mersin.bel.tr\/haber\/meski-2-etap-cati-tipi-gunes-enerji-santrallerini-devreye-aldi-1727677670\" target=\"_blank\" rel=\"noopener\">Mersin Belediyesi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Mersin B\u00fcy\u00fck\u015fehir Belediyesi Mersin Su ve Kanalizasyon \u0130daresi (MESK\u0130) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, \u00c7at\u0131 Tipi G\u00fcne\u015f Enerjisi Santralleri (GES) projelerinin 2. Etab\u0131n\u0131 bitirdi. \u00c7al\u0131\u015fma [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":192134,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[115260,115259,2206,115261,101703,101079],"views":42,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/192130"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=192130"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/192130\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/192134"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=192130"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=192130"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=192130"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}