{"id":191920,"date":"2024-09-24T15:48:04","date_gmt":"2024-09-24T12:48:04","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=191920"},"modified":"2024-09-24T15:48:04","modified_gmt":"2024-09-24T12:48:04","slug":"sedas-yatirim-calismalarina-yenisini-ekledi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sedas-yatirim-calismalarina-yenisini-ekledi\/","title":{"rendered":"(Turkish) &#8217;SEDA\u015e&#8217; Yat\u0131r\u0131m \u00c7al\u0131\u015fmalar\u0131na Yenisini Ekledi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/191920\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Sakarya, Kocaeli, Bolu, D\u00fczce ve Gebze b\u00f6lgelerindeki 2 milyonu a\u015fk\u0131n m\u00fc\u015fteriye kesintisiz enerji da\u011f\u0131t\u0131m\u0131 i\u00e7in yat\u0131r\u0131m faaliyetlerine aral\u0131ks\u0131z devam eden SEDA\u015e, yeni h\u00fccrelerin montaj \u00e7al\u0131\u015fmalar\u0131n\u0131 t\u00fcm h\u0131z\u0131yla s\u00fcrd\u00fcr\u00fcyor.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-191923\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/09\/sedas-yatirim-calismalarina-yenisini-ekledi-1.jpg\" alt=\"\" width=\"500\" height=\"368\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/09\/sedas-yatirim-calismalarina-yenisini-ekledi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/09\/sedas-yatirim-calismalarina-yenisini-ekledi-1-300x221.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/09\/sedas-yatirim-calismalarina-yenisini-ekledi-1-500x368.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/09\/sedas-yatirim-calismalarina-yenisini-ekledi-1-68x50.jpg 68w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Sakarya Elektrik Da\u011f\u0131t\u0131m A.\u015e. (SEDA\u015e), planlanan \u00e7al\u0131\u015fmalarla hizmet verdi\u011fi b\u00f6lgelerde enerji kesintilerinin minimize edilmesini ve enerji tedarik s\u00fcreklili\u011finin sa\u011flanmas\u0131n\u0131 hedefliyor. Saha montaj i\u015flemlerinin 3. seviye bak\u0131m kapsam\u0131nda yap\u0131ld\u0131\u011f\u0131n\u0131 a\u00e7\u0131klayan SEDA\u015e yetkilileri, h\u00fccre yenileme \u00e7al\u0131\u015fmalar\u0131 ile elektrik da\u011f\u0131t\u0131m hizmetinde s\u00fcreklili\u011fin sa\u011flanmas\u0131n\u0131n ama\u00e7land\u0131\u011f\u0131n\u0131 belirtti. Yeni h\u00fccrelerin tesis edilmesinin yan\u0131 s\u0131ra ekonomik \u00f6mr\u00fcn\u00fc tamamlam\u0131\u015f elektrik ekipmanlar\u0131n\u0131n da yenilenmesiyle, olas\u0131 ar\u0131zalar\u0131n daha az b\u00f6lgeyi etkilemesi ve hizmet kalitesinin art\u0131r\u0131lmas\u0131 hedefleniyor.<\/p>\n<p>SEDA\u015e\u2019\u0131n h\u00fccre yenileme \u00e7al\u0131\u015fmalar\u0131 kapsam\u0131nda, toplam 395 adet yeni h\u00fccrenin montaj \u00e7al\u0131\u015fmalar\u0131n\u0131n ba\u015flad\u0131\u011f\u0131n\u0131 ifade eden SEDA\u015e yetkilileri, Sakarya\u2019da 85 adet, Kocaeli\u2019de 119 adet, Gebze\u2019de 135 adet, D\u00fczce\u2019de 28 adet ve Bolu\u2019da 28 adet yenileme yap\u0131laca\u011f\u0131n\u0131 aktard\u0131. Bu yenileme \u00e7al\u0131\u015fmalar\u0131yla birlikte SEDA\u015e hem enerji g\u00fcvenli\u011fini art\u0131rmay\u0131 hem de b\u00f6lge halk\u0131n\u0131n ya\u015fam kalitesini y\u00fckseltmeyi ama\u00e7l\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Sakarya, Kocaeli, Bolu, D\u00fczce ve Gebze b\u00f6lgelerindeki 2 milyonu a\u015fk\u0131n m\u00fc\u015fteriye kesintisiz enerji da\u011f\u0131t\u0131m\u0131 i\u00e7in yat\u0131r\u0131m faaliyetlerine aral\u0131ks\u0131z devam eden SEDA\u015e, yeni [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":191922,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[115196,4546,115197,102600,2444],"views":32,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/191920"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=191920"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/191920\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/191922"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=191920"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=191920"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=191920"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}