{"id":191441,"date":"2024-09-04T18:25:35","date_gmt":"2024-09-04T15:25:35","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=191441"},"modified":"2024-09-04T18:25:35","modified_gmt":"2024-09-04T15:25:35","slug":"turkiye-nin-2inci-buyuk-gunes-santrali-erzin-1-kismi-olarak-devrede","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-nin-2inci-buyuk-gunes-santrali-erzin-1-kismi-olarak-devrede\/","title":{"rendered":"(Turkish) T\u00fcrkiye\u2019nin 2&#8217;inci B\u00fcy\u00fck G\u00fcne\u015f Santrali Erzin-1 K\u0131smi Olarak Devrede"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/191441\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>T\u00fcrkiye\u2019nin ikinci b\u00fcy\u00fck g\u00fcne\u015f enerjisi santrali olan Erzin-1 GES, Limak Yenilenebilir Enerji taraf\u0131ndan 60 megavat kapasiteyle k\u0131smi olarak devreye al\u0131nd\u0131. Hatay\u2019\u0131n Erzin il\u00e7esinde yer alan ve tamamland\u0131\u011f\u0131nda 140 megavat kurulu g\u00fcce sahip olacak olan bu dev proje, ekim ay\u0131nda tam kapasiteyle \u00e7al\u0131\u015fmaya ba\u015flayacak.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-191443\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/09\/turkiye-nin-2inci-buyuk-gunes-santrali-erzin-1-kismi-olarak-devrede.jpg\" alt=\"\" width=\"500\" height=\"335\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/09\/turkiye-nin-2inci-buyuk-gunes-santrali-erzin-1-kismi-olarak-devrede.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/09\/turkiye-nin-2inci-buyuk-gunes-santrali-erzin-1-kismi-olarak-devrede-300x201.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/09\/turkiye-nin-2inci-buyuk-gunes-santrali-erzin-1-kismi-olarak-devrede-500x335.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/09\/turkiye-nin-2inci-buyuk-gunes-santrali-erzin-1-kismi-olarak-devrede-75x50.jpg 75w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>2 bin d\u00f6n\u00fcml\u00fck arazi \u00fczerine kurulan Erzin-1 GES, tamamland\u0131\u011f\u0131nda y\u0131lda 270 milyon kilovatsaat \u00fczerinde elektrik \u00fcretimi yapacak. Kullan\u0131lan son teknoloji \u2018bifacial\u2019 PV mod\u00fcller sayesinde \u00e7ift y\u00f6nl\u00fc \u0131\u015f\u0131n\u0131m\u0131 maksimum verimle kullanacak olan bu santral, 106 bin hanenin y\u0131ll\u0131k elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layacak.<\/p>\n<p>Projenin in\u015faat s\u00fcrecinde b\u00f6lgeye 500 ki\u015filik istihdam sa\u011fland\u0131. Ayr\u0131ca, 6 \u015eubat depremlerinin ard\u0131ndan b\u00f6lgede normale d\u00f6n\u00fc\u015f s\u00fcrecine b\u00fcy\u00fck katk\u0131 sa\u011flayan bu proje, enerji kalitesinin iyile\u015ftirilmesi ve elektrik talep y\u00fck\u00fcn\u00fcn hafifletilmesi gibi \u00f6nemli faydalar sunuyor. Y\u0131lda 175 bin ton ilave karbon emisyonu azaltacak olan Erzin-1 GES, T\u00fcrkiye\u2019nin temiz enerji hedeflerine \u00f6nemli bir katk\u0131 sa\u011fl\u0131yor.<\/p>\n<p>Erzin-1 GES, YEKA GES-4 Erzin-Viran\u015fehir yar\u0131\u015fmas\u0131nda k\u0131smi olarak devreye al\u0131nan ilk proje olma \u00f6zelli\u011fini ta\u015f\u0131yor. Limak Yenilenebilir Enerji, GE Vernova ve \u0130nojen Enerji ile yapt\u0131\u011f\u0131 anla\u015fmalar sayesinde bu projeyi ekim ay\u0131nda tam kapasiteye ula\u015ft\u0131rmay\u0131 hedefliyor.<\/p>\n<p>Kaynak:\u00a0<a href=\"https:\/\/sanayigazetesi.com.tr\/turkiyenin-en-buyuk-ikinci-gunes-enerji-santralitam-kapasiteyle-ekimde-enerji-verecek\/\" target=\"_blank\" rel=\"noopener\">Sanayi Gazetesi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin ikinci b\u00fcy\u00fck g\u00fcne\u015f enerjisi santrali olan Erzin-1 GES, Limak Yenilenebilir Enerji taraf\u0131ndan 60 megavat kapasiteyle k\u0131smi olarak devreye al\u0131nd\u0131. Hatay\u2019\u0131n Erzin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":191443,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[7748,115034,2569,2206,5630,115035],"views":33,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/191441"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=191441"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/191441\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/191443"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=191441"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=191441"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=191441"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}