{"id":191217,"date":"2024-08-22T19:21:33","date_gmt":"2024-08-22T16:21:33","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=191217"},"modified":"2024-08-22T19:21:33","modified_gmt":"2024-08-22T16:21:33","slug":"mugla-buyuksehir-belediyesi-yenilenebilir-enerji-projelerini-surduruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/mugla-buyuksehir-belediyesi-yenilenebilir-enerji-projelerini-surduruyor\/","title":{"rendered":"(Turkish) &#8217;Mu\u011fla B\u00fcy\u00fck\u015fehir Belediyesi&#8217; Yenilenebilir Enerji Projelerini S\u00fcrd\u00fcr\u00fcyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/191217\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Mu\u011fla B\u00fcy\u00fck\u015fehir Belediyesi MUSK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, Denizova GES projesinin ard\u0131ndan 4 GES ve 1 HES projesini daha hayata ge\u00e7irmeye haz\u0131rlan\u0131yor. Yenilenebilir enerji kaynaklar\u0131na yap\u0131lan yat\u0131r\u0131mlarla elektrik tasarrufu sa\u011flanacak.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-191219\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/mugla-buyuksehir-belediyesi-yenilenebilir-enerji-projelerini-surduruyor.jpg\" alt=\"\" width=\"500\" height=\"299\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/mugla-buyuksehir-belediyesi-yenilenebilir-enerji-projelerini-surduruyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/mugla-buyuksehir-belediyesi-yenilenebilir-enerji-projelerini-surduruyor-300x179.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/mugla-buyuksehir-belediyesi-yenilenebilir-enerji-projelerini-surduruyor-500x299.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/mugla-buyuksehir-belediyesi-yenilenebilir-enerji-projelerini-surduruyor-80x48.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Mu\u011fla B\u00fcy\u00fck\u015fehir Belediyesi MUSK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc yenilenebilir enerji kaynaklar\u0131na yat\u0131r\u0131m yapmaya devam ediyor. Son olarak Denizova GES projesini hizmete sunan ekipler d\u00f6rt farkl\u0131 GES ve bir mikro HES projesini daha hayata ge\u00e7irmeye haz\u0131rlan\u0131yor. Mu\u011fla B\u00fcy\u00fck\u015fehir Belediyesi Su ve Kanalizasyon \u0130daresi MUSK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc yenilenebilir enerji kaynaklar\u0131 yat\u0131r\u0131mlar\u0131yla elektrik tasarrufu sa\u011flamaya devam ediyor.<\/p>\n<p>Son olarak Denizova Mahallesinde y\u0131ll\u0131k elektrik giderinin yakla\u015f\u0131k y\u00fczde 10\u2019luk k\u0131sm\u0131n\u0131 kar\u015f\u0131layabilecek d\u00fczeyde elektrik \u00fcretim kapasitesi olan GES projesini hizmete sunan ekipler 4 GES, 1 HES projesini daha hayata ge\u00e7irmeye haz\u0131rlan\u0131yor. \u0130l genelinde <strong>5 \u00e7at\u0131 tipi G\u00fcne\u015f Enerji santrali<\/strong> bulunan MUSK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, 4 farkl\u0131 noktada daha GES kurulumu i\u00e7in proje \u00e7al\u0131\u015fmalar\u0131na devam ediyor. Bu kapsamda <strong>Fethiye At\u0131ksu Ar\u0131tma Tesisi, Turgutreis At\u0131ksu Ar\u0131tma Tesisi, Yata\u011fan su deposu ve MUSK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc Binas\u0131n\u0131n otopark \u00e7at\u0131s\u0131na<\/strong> yakla\u015f\u0131k <strong>250 KW<\/strong> g\u00fcce sahip <strong>yeni g\u00fcne\u015f enerji santralleri<\/strong> kurulmas\u0131 ama\u00e7lan\u0131yor.<\/p>\n<p>Kurulacak olan bu 4 \u00e7at\u0131 tipi g\u00fcne\u015f enerji santralleri y\u0131ll\u0131k 350 bin kWh enerji \u00fcretimi ile MUSK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fcn\u00fcn 730 bin TL tasarruf etmesini sa\u011flayacak. Bodrum Geyik Baraj\u0131ndan gelen ve \u00c7amk\u00f6y su deposunu besleyen hatt\u0131n depo giri\u015fine mikro \u00f6l\u00e7ekte Hidroelektrik santrali yapmay\u0131 planlayan MUSK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc t\u00fcm projelerini haz\u0131rlarken gerekli izinlerin verilmesi ile birlikte \u00e7al\u0131\u015fmalar\u0131n\u0131 ba\u015flatacak. Su kuvveti ile elektrik \u00fcretecek olan ekipler burada 3 Milyon kWh enerji \u00fcreterek y\u0131ll\u0131k yakla\u015f\u0131k 5 Milyon 700 Bin TL tasarruf edecek. Bu projenin yan\u0131 s\u0131ra 3 farkl\u0131 noktada daha detayl\u0131 fizibilite raporlar\u0131 haz\u0131rlan\u0131rken belirlenen b\u00f6lgelerde de izin ve proje \u00e7al\u0131\u015fmalar\u0131na ba\u015flanacak.<\/p>\n<p>\u201cKulland\u0131\u011f\u0131m\u0131z elektri\u011fin tamam\u0131n\u0131 yenilenebilir enerji kaynaklar\u0131ndan elde etmeyi hedefliyoruz\u201d konu hakk\u0131nda a\u00e7\u0131klamalarda bulunan <strong>MUSK\u0130 Genel M\u00fcd\u00fcr\u00fc Y\u0131lmaz \u015eeng\u00fcl<\/strong>, elektrik giderlerinin \u00e7ok y\u00fcksek oldu\u011funu ve bunu kar\u015f\u0131layabilmek i\u00e7in enerji yat\u0131r\u0131mlar\u0131n\u0131 s\u00fcrd\u00fcreceklerini s\u00f6yledi. \u015eeng\u00fcl, kulland\u0131klar\u0131 elektri\u011fin tamam\u0131n\u0131 yenilenebilir enerji kaynaklar\u0131ndan kar\u015f\u0131lamay\u0131 hedeflediklerini vurgularken, <em>\u201cBildi\u011finiz \u00fczere MUSK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc olarak suyun evlere ula\u015fmas\u0131, at\u0131k suyun ar\u0131t\u0131lmas\u0131 ve bertaraf edilmesi gibi konularda \u00e7ok b\u00fcy\u00fck elektrik giderlerimiz bulunuyor. Ba\u015fta pompalar ve di\u011fer mekanik ekipmanlar\u0131m\u0131z\u0131n bir\u00e7o\u011fu elektrik enerjisine ihtiya\u00e7 duyuyor. Bizlerde \u00f6zellikle say\u0131n Ba\u015fkan\u0131m\u0131z Ahmet Aras\u2019\u0131n te\u015fvikleri ve destekleriyle yenilenebilir enerji yat\u0131r\u0131mlar\u0131m\u0131za \u00f6nem vererek projelerimizi h\u0131zland\u0131rd\u0131k. \u00c7amk\u00f6y HES projemizi hayata ge\u00e7irirsek enerji giderlerimizin yakla\u015f\u0131k y\u00fczde 15\u2019lik k\u0131sm\u0131n\u0131 kar\u015f\u0131l\u0131yor olaca\u011f\u0131z. Buradaki as\u0131l hedefimiz ise tamam\u0131n\u0131 kar\u015f\u0131lamak. Bu do\u011frultuda \u00e7al\u0131\u015fmaya devam edece\u011fiz\u201d<\/em> dedi.<\/p>\n<p>Kaynak: <a href=\"https:\/\/www.sondakika.com\/yerel\/haber-mugla-buyuksehir-belediyesi-yenilenebilir-enerji-projelerine-devam-ediyor-17722463\/\" target=\"_blank\" rel=\"noopener\">\u0130HA<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Mu\u011fla B\u00fcy\u00fck\u015fehir Belediyesi MUSK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, Denizova GES projesinin ard\u0131ndan 4 GES ve 1 HES projesini daha hayata ge\u00e7irmeye haz\u0131rlan\u0131yor. Yenilenebilir enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":191219,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[114962,52089,114960,21886,7440,6979,47286,114961,842,105,1245],"views":35,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/191217"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=191217"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/191217\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/191219"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=191217"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=191217"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=191217"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}