{"id":191020,"date":"2024-08-16T16:43:45","date_gmt":"2024-08-16T13:43:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=191020"},"modified":"2024-08-16T16:43:45","modified_gmt":"2024-08-16T13:43:45","slug":"yazici-demir-celik-uretimde-enerji-ihtiyacini-gunes-ten-karsilayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yazici-demir-celik-uretimde-enerji-ihtiyacini-gunes-ten-karsilayacak\/","title":{"rendered":"(Turkish) &#8217;Yaz\u0131c\u0131 Demir \u00c7elik&#8217; \u00dcretimde Enerji \u0130htiyac\u0131n\u0131 G\u00fcne\u015f&#8217;ten Kar\u015f\u0131layacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/191020\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Yenilenebilir enerji ve enerji teknolojileri markas\u0131 YEO Teknoloji, T\u00fcrkiye\u2019nin \u00f6nde gelen demir \u00e7elik \u00fcreticilerinden Yaz\u0131c\u0131 Demir \u00c7elik A.\u015e. ile anahtar teslimi g\u00fcne\u015f santrali kurulum hizmeti i\u00e7in 66.000.000 dolarl\u0131k dev bir s\u00f6zle\u015fme imzalad\u0131.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-191024\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/yazici-demir-celik-uretimde-enerji-ihtiyacini-gunes-ten-karsilayacak-1.jpg\" alt=\"\" width=\"500\" height=\"319\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/yazici-demir-celik-uretimde-enerji-ihtiyacini-gunes-ten-karsilayacak-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/yazici-demir-celik-uretimde-enerji-ihtiyacini-gunes-ten-karsilayacak-1-300x191.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/yazici-demir-celik-uretimde-enerji-ihtiyacini-gunes-ten-karsilayacak-1-500x319.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/yazici-demir-celik-uretimde-enerji-ihtiyacini-gunes-ten-karsilayacak-1-78x50.jpg 78w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>YEO Teknoloji, demir \u00e7elik sekt\u00f6r\u00fcn\u00fcn karbonsuzla\u015ft\u0131r\u0131lmas\u0131na y\u00f6nelik bir g\u00fcne\u015f enerjisi santrali projesine imza att\u0131. Anla\u015fmaya g\u00f6re YEO Teknoloji, T\u00fcrkiye\u2019nin \u00f6nde gelen demir \u00e7elik \u00fcreticilerinden Yaz\u0131c\u0131 Demir \u00c7elik i\u00e7in Lisanss\u0131z Elektrik \u00dcretim Y\u00f6netmeli\u011fi\u2019nin 5.1.h maddesi kapsam\u0131nda, proje geli\u015ftirme dahil anahtar teslimi g\u00fcne\u015f santrali kuracak. Tamamlanacak proje ile Yaz\u0131c\u0131 Demir \u00c7elik, \u00fcretimde kulland\u0131\u011f\u0131 elektrik ihtiyac\u0131n\u0131 tamam\u0131yla ye\u015fil enerjiden kar\u015f\u0131lam\u0131\u015f olacak.<\/p>\n<p>Avrupa Birli\u011fi\u2019nin (AB) karbon n\u00f6tr politikalar\u0131 do\u011frultusunda s\u00f6z konusu proje, demir \u00e7elik sekt\u00f6r\u00fc payda\u015flar\u0131n\u0131n temiz enerji kullanmas\u0131 stratejisine \u00f6nemli katk\u0131 sa\u011flayacak. Yaz\u0131c\u0131 Demir \u00c7elik\u2019in karbon hedeflerine ula\u015fmas\u0131nda kritik bir rol oynayacak olan proje, YEO Teknoloji\u2019nin de sekt\u00f6rdeki \u00f6nc\u00fc konumunu g\u00fc\u00e7lendirecek.<\/p>\n<h3><strong>Anahtar Teslim Santral Projesi<\/strong><\/h3>\n<p>S\u00f6zle\u015fme, g\u00fcne\u015f enerjisi santralinin in\u015fa edilece\u011fi arazilerin bulunmas\u0131 ve kullan\u0131m haklar\u0131n\u0131n al\u0131nmas\u0131, \u00e7a\u011fr\u0131 mektuplar\u0131n\u0131n temini, \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) raporlar\u0131n\u0131n haz\u0131rlanmas\u0131, imar s\u00fcre\u00e7lerinin takibi ve yap\u0131 ruhsatlar\u0131n\u0131n al\u0131nmas\u0131, gerekli izin ve ruhsatlar\u0131n temini, g\u00fcne\u015f santralinin in\u015fas\u0131, y\u00fcksek gerilim trafo merkezi ve enerji iletim hatlar\u0131n\u0131n yap\u0131m\u0131 gibi hizmetleri kaps\u0131yor.<\/p>\n<p>3 k\u0131tada ve 30\u2019dan fazla \u00fclkede 400\u2019den fazla projeyi ba\u015far\u0131yla tamamlayarak global bir oyuncu haline gelen YEO Teknoloji, geli\u015fmi\u015f enerji depolama \u00e7\u00f6z\u00fcmlerinden elektrik \u015febekelerine, y\u00fcksek voltaj trafo merkezlerinden yenilenebilir enerji santrallerine, end\u00fcstriyel ve ticari tesislerden hanelerin enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcne ve hidrojene kadar farkl\u0131 alanlarda projeler y\u00fcr\u00fct\u00fcyor. YEO Teknoloji, global bir oyuncu olma yolunda ad\u0131mlar\u0131n\u0131 h\u0131zland\u0131rarak, <strong>dekarbonizasyon, desantralizasyon ve dijitalizasyon<\/strong> odakl\u0131 \u00e7al\u0131\u015fmalar\u0131yla daha ya\u015fanabilir bir d\u00fcnya i\u00e7in \u2018Bizce m\u00fcmk\u00fcn\u2019 slogan\u0131yla b\u00fcy\u00fcmeye devam ediyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Yenilenebilir enerji ve enerji teknolojileri markas\u0131 YEO Teknoloji, T\u00fcrkiye\u2019nin \u00f6nde gelen demir \u00e7elik \u00fcreticilerinden Yaz\u0131c\u0131 Demir \u00c7elik A.\u015e. ile anahtar teslimi g\u00fcne\u015f [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":191023,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[27525,21886,23416,26059,114906,96708],"views":34,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/191020"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=191020"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/191020\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/191023"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=191020"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=191020"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=191020"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}