{"id":191006,"date":"2024-08-13T18:21:26","date_gmt":"2024-08-13T15:21:26","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=191006"},"modified":"2024-08-13T18:21:26","modified_gmt":"2024-08-13T15:21:26","slug":"antalya-buyuksehir-belediyesi-nin-enerjisinin-yuzde-40-i-gunesten","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/antalya-buyuksehir-belediyesi-nin-enerjisinin-yuzde-40-i-gunesten\/","title":{"rendered":"(Turkish) Antalya B\u00fcy\u00fck\u015fehir Belediyesi&#8217;nin Enerjisinin % 40\u2019\u0131 G\u00fcne\u015ften"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/191006\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Antalya B\u00fcy\u00fck\u015fehir Belediyesi, kentin g\u00fcne\u015f enerjisi potansiyelini de\u011ferlendirerek enerji t\u00fcketiminin yakla\u015f\u0131k y\u00fczde 39.59\u2019unu G\u00fcne\u015f Enerji Santrallerinden sa\u011fl\u0131yor.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-191008\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/antalya-buyuksehir-belediyesi-nin-enerjisinin-yuzde-40-i-gunesten.jpg\" alt=\"\" width=\"500\" height=\"325\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/antalya-buyuksehir-belediyesi-nin-enerjisinin-yuzde-40-i-gunesten.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/antalya-buyuksehir-belediyesi-nin-enerjisinin-yuzde-40-i-gunesten-300x195.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/antalya-buyuksehir-belediyesi-nin-enerjisinin-yuzde-40-i-gunesten-500x325.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/antalya-buyuksehir-belediyesi-nin-enerjisinin-yuzde-40-i-gunesten-77x50.jpg 77w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Antalya B\u00fcy\u00fck\u015fehir Belediyesi, iklim de\u011fi\u015fikli\u011fi ile m\u00fccadele kapsam\u0131nda temiz ve yenilenebilir enerji kaynaklar\u0131n\u0131n kullan\u0131m\u0131n\u0131 artt\u0131r\u0131yor. GES yat\u0131r\u0131mlar\u0131na \u00f6ncelik ve \u00f6nem veren Antalya B\u00fcy\u00fck\u015fehir Belediyesi, <strong>Nisan 2019<\/strong>\u2019dan bu yana <strong>7 adet<\/strong> olan g\u00fcne\u015f enerji santrallerine <strong>10 yeni g\u00fcne\u015f enerji santrali<\/strong> daha ekleyerek GES say\u0131s\u0131n\u0131 <strong>17\u2019ye<\/strong> \u00e7\u0131kard\u0131. Yeni GES yat\u0131r\u0131mlar\u0131 ile birlikte kurulu g\u00fcc\u00fc <strong>9,49 MW<\/strong>\u2019a ula\u015fan Antalya B\u00fcy\u00fck\u015fehir Belediyesi enerji t\u00fcketiminin yakla\u015f\u0131k <strong>y\u00fczde 39,59<\/strong>\u2019unu G\u00fcne\u015f Enerji Santralleri ile kar\u015f\u0131l\u0131yor. Antalya B\u00fcy\u00fck\u015fehir Belediyesi bu sayede <strong>34 milyon 650 bin TL<\/strong> ekonomik katk\u0131 sa\u011fl\u0131yor.<\/p>\n<h3><strong>\u00c7ATI T\u0130P\u0130 GES\u2019LER\u0130N SAYISI ARTACAK<\/strong><\/h3>\n<p>Antalya B\u00fcy\u00fck\u015fehir Belediyesi b\u00fcnyesinde Da\u011fbeli\/D\u00f6\u015femealt\u0131 b\u00f6lgesinde toplam <strong>7 adet<\/strong> <strong>arazi tipi GES<\/strong>, D\u00f6\u015femealt\u0131 \u00c7\u0131plakl\u0131 Engelli Rehabilitasyon Merkezi \u00c7at\u0131s\u0131, Fatih \u0130stasyonu Tramvay At\u00f6lye Binas\u0131 \u00c7at\u0131s\u0131 ve Antalya B\u00fcy\u00fck\u015fehir Belediyesi Ana Hizmet Binas\u0131 \u00c7at\u0131s\u0131nda olmak \u00fczere toplam <strong>10 adet GES Santrali<\/strong> bulunuyor. Antalya B\u00fcy\u00fck\u015fehir Belediyesi, yeni GES yat\u0131r\u0131mlar\u0131 ile temiz enerji \u00fcretim kapasitesini art\u0131rmay\u0131 da hedefliyor. Tar\u0131msal Hizmetler Dairesi Ba\u015fkanl\u0131\u011f\u0131 Hizmet Binas\u0131 \u00e7at\u0131s\u0131na <strong>120 kWe<\/strong> ve Manavgat Toptanc\u0131 Hali \u00e7at\u0131s\u0131na<strong> 539 kWe<\/strong> kurulu g\u00fcc\u00fcnde \u00e7at\u0131 GES tesislerinin <strong>2024-2025 y\u0131llar\u0131<\/strong> i\u00e7erisinde yap\u0131lmas\u0131 planlan\u0131yor. Ayr\u0131ca <strong>Alanya, Demre, Kumluca, Finike ve Ka\u015f Toptanc\u0131 Halleri ile Hayvan Bar\u0131na\u011f\u0131 \u00e7at\u0131lar\u0131na ve Elmal\u0131<\/strong>\u2019da arazi olmak \u00fczere <strong>GES yap\u0131lmas\u0131na ili\u015fkin fizibilite \u00e7al\u0131\u015fmalar\u0131<\/strong> devam ediyor.<\/p>\n<p>Kaynak:\u00a0<a href=\"https:\/\/www.iha.com.tr\/antalya-haberleri\/antalya-buyuksehir-belediyesi-enerjisini-gunesten-aliyor-106976625\" target=\"_blank\" rel=\"noopener noreferrer\">\u0130HA<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Antalya B\u00fcy\u00fck\u015fehir Belediyesi, kentin g\u00fcne\u015f enerjisi potansiyelini de\u011ferlendirerek enerji t\u00fcketiminin yakla\u015f\u0131k y\u00fczde 39.59\u2019unu G\u00fcne\u015f Enerji Santrallerinden sa\u011fl\u0131yor. Antalya B\u00fcy\u00fck\u015fehir Belediyesi, iklim de\u011fi\u015fikli\u011fi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":191008,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[7939,56174,36606,2326,24571,2569,2206,842,105],"views":37,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/191006"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=191006"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/191006\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/191008"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=191006"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=191006"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=191006"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}