{"id":190942,"date":"2024-08-12T16:03:58","date_gmt":"2024-08-12T13:03:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=190942"},"modified":"2024-08-12T16:04:16","modified_gmt":"2024-08-12T13:04:16","slug":"sedas-tan-bolu-ya-255-milyon-tl-yatirim","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sedas-tan-bolu-ya-255-milyon-tl-yatirim\/","title":{"rendered":"(Turkish) &#8217;SEDA\u015e&#8217;tan Bolu\u2019ya 255 Milyon TL Yat\u0131r\u0131m"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/190942\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>SEDA\u015e, Bolu\u2019nun kesintisiz enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lamak ve b\u00f6lgesel geli\u015fimine katk\u0131da bulunmak \u00fczere aral\u0131ks\u0131z \u00e7al\u0131\u015fmalar\u0131na devam ediyor. 2023 y\u0131l\u0131nda Bolu\u2019nun da\u011f\u0131t\u0131m \u015febekesindeki <\/strong><strong>ihtiya\u00e7lar\u0131 i\u00e7in toplamda 180 milyon TL yat\u0131r\u0131m yapan SEDA\u015e, 2024 y\u0131l\u0131 i\u00e7in 67 proje kar\u015f\u0131l\u0131\u011f\u0131nda yakla\u015f\u0131k 255 milyon TL yat\u0131r\u0131m planl\u0131yor.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-190945\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/sedas-tan-bolu-ya-255-milyon-tl-yatirim-1.jpg\" alt=\"\" width=\"500\" height=\"334\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/sedas-tan-bolu-ya-255-milyon-tl-yatirim-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/sedas-tan-bolu-ya-255-milyon-tl-yatirim-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/sedas-tan-bolu-ya-255-milyon-tl-yatirim-1-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/sedas-tan-bolu-ya-255-milyon-tl-yatirim-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/sedas-tan-bolu-ya-255-milyon-tl-yatirim-1-450x300.jpg 450w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>20 bin kilometrekarelik alandaki 3,9 milyon n\u00fcfusa hizmet veren <strong>Sakarya Elektrik Da\u011f\u0131t\u0131m A\u015e. (SEDA\u015e)<\/strong>, Bolu\u2019daki yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131na kararl\u0131l\u0131kla devam ediyor. Hizmet verdi\u011fi t\u00fcm b\u00f6lgelerde oldu\u011fu gibi Bolu\u2019da da <strong>enerji altyap\u0131s\u0131n\u0131 g\u00fc\u00e7lendirmek ve kesintisiz enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lamak<\/strong> i\u00e7in <strong>2023 y\u0131l\u0131nda<\/strong> da\u011f\u0131t\u0131m \u015febekesine yakla\u015f\u0131k <strong>180 milyon TL<\/strong> yat\u0131r\u0131m yapan SEDA\u015e, bu kapsamda b\u00f6lgeye <strong>25 adet yeni trafo<\/strong> tesis etti.<\/p>\n<p>Yat\u0131r\u0131mlar\u0131n aral\u0131ks\u0131z devam etti\u011fini belirten <strong>SEDA\u015e \u0130cra Ba\u015fkan\u0131 Dr. Necmi Odyakmaz,<\/strong> <em>&#8220;2024 y\u0131l\u0131nda, Bolu\u2019da 67 farkl\u0131 proje i\u00e7in yakla\u015f\u0131k 255 milyon TL\u2019lik yat\u0131r\u0131m planlad\u0131k. Bu yat\u0131r\u0131mlar\u0131n b\u00fcy\u00fck k\u0131sm\u0131 hayata ge\u00e7irildi. Kalan etaplar\u0131 ise h\u0131zla s\u00fcrd\u00fcr\u00fcl\u00fcyor. Kapsaml\u0131 yat\u0131r\u0131mlarla birlikte 18 adet yeni trafo tesisi devreye al\u0131nacak ve b\u00f6lgenin elektrik altyap\u0131s\u0131 daha da g\u00fc\u00e7lendirilecektir. Bolu merkezin yan\u0131 s\u0131ra Mudurnu, Mengen, G\u00f6yn\u00fck ve Gerede b\u00f6lgelerindeki yat\u0131r\u0131m ve bak\u0131m \u00e7al\u0131\u015fmalar\u0131m\u0131z, elektrik da\u011f\u0131t\u0131m hatlar\u0131nda ya\u015fan\u0131lacak olas\u0131 kesintilerin \u00f6n\u00fcne ge\u00e7mek ad\u0131na \u00f6nemli bir ad\u0131m olacakt\u0131r&#8221;<\/em> \u015feklinde bilgi verdi.<\/p>\n<p>SEDA\u015e&#8217;\u0131n kaliteli hizmet ve kesintisiz enerji hedefiyle Bolu\u2019da m\u00fc\u015fteri beklentilerini titizlikle ara\u015ft\u0131rarak, bunlar\u0131 kar\u015f\u0131layacak yat\u0131r\u0131m planlamas\u0131na ara vermeden devam etti\u011finin alt\u0131n\u0131 \u00e7izen SEDA\u015e CEO\u2019su Odyakmaz, <em>\u201cTEDA\u015e taraf\u0131ndan ger\u00e7ekle\u015ftirilen 21 da\u011f\u0131t\u0131m b\u00f6lgesine ait m\u00fc\u015fteri memnuniyeti \u00f6l\u00e7\u00fcmlemelerinde Bolu \u0130limiz, Haziran ay\u0131nda 81 il aras\u0131nda 5. s\u0131rada yer alma ba\u015far\u0131s\u0131 g\u00f6stermi\u015ftir. Bir \u00f6nceki y\u0131la g\u00f6re \u015fik\u00e2yet say\u0131lar\u0131nda da %27 azalma ya\u015fanm\u0131\u015ft\u0131r. Bu ba\u015far\u0131da eme\u011fi ge\u00e7en t\u00fcm \u00e7al\u0131\u015fma arkada\u015flar\u0131ma te\u015fekk\u00fcr ederim\u201d<\/em> dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. SEDA\u015e, Bolu\u2019nun kesintisiz enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lamak ve b\u00f6lgesel geli\u015fimine katk\u0131da bulunmak \u00fczere aral\u0131ks\u0131z \u00e7al\u0131\u015fmalar\u0131na devam ediyor. 2023 y\u0131l\u0131nda Bolu\u2019nun da\u011f\u0131t\u0131m \u015febekesindeki ihtiya\u00e7lar\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":190944,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[70051,114875,4546,102600,2444],"views":30,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/190942"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=190942"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/190942\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/190944"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=190942"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=190942"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=190942"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}