{"id":190774,"date":"2024-08-05T19:36:33","date_gmt":"2024-08-05T16:36:33","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=190774"},"modified":"2024-08-05T19:37:28","modified_gmt":"2024-08-05T16:37:28","slug":"asunim-turkiye-osb-proje-portfoyune-bir-yenisini-daha-ekledi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/asunim-turkiye-osb-proje-portfoyune-bir-yenisini-daha-ekledi\/","title":{"rendered":"(Turkish) &#8217;Asunim T\u00fcrkiye&#8217; OSB Proje Portf\u00f6y\u00fcne Bir Yenisini Daha Ekledi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/190774\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>ASUNIM, Renkler Makina ve Yedek Par\u00e7a San. ve Ticaret A.\u015e.\u2019nin \u0130zmir Kemalpa\u015fa OSB\u2019de bulunan fabrikas\u0131n\u0131n \u00e7at\u0131s\u0131na 3.32MW g\u00fcc\u00fcnde g\u00fcne\u015f enerji santrali (GES) kuracak.<\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-190776\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/asunim-turkiye-organize-sanayi-bolgeleri-osb-proje-portfoyune-bir-yenisini-daha-ekledi.jpg\" alt=\"\" width=\"500\" height=\"351\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/asunim-turkiye-organize-sanayi-bolgeleri-osb-proje-portfoyune-bir-yenisini-daha-ekledi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/asunim-turkiye-organize-sanayi-bolgeleri-osb-proje-portfoyune-bir-yenisini-daha-ekledi-300x211.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/asunim-turkiye-organize-sanayi-bolgeleri-osb-proje-portfoyune-bir-yenisini-daha-ekledi-500x351.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/asunim-turkiye-organize-sanayi-bolgeleri-osb-proje-portfoyune-bir-yenisini-daha-ekledi-71x50.jpg 71w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>\u0130zmir ve Manisa\u2019da toplam \u00fc\u00e7 \u00fcretim fabrikas\u0131 bulunan ve elektromekanik, beyaz e\u015fya, otomotiv ve benzeri end\u00fcstriler i\u00e7in komponent \u00fcretimi ve montaj i\u015flemleri ger\u00e7ekle\u015ftiren Renkler Makine, ASUNIM taraf\u0131ndan kurulacak olan bu proje ile fabrikan\u0131n enerji ihtiyac\u0131n\u0131n b\u00fcy\u00fck bir k\u0131sm\u0131n\u0131 kar\u015f\u0131layarak, i\u015fletmenin enerji ba\u011f\u0131ms\u0131zl\u0131\u011f\u0131n\u0131 art\u0131racak. Ayn\u0131 zamanda bu yat\u0131r\u0131m, Renkler Makina\u2019n\u0131n karbon ayak izini \u00f6nemli \u00f6l\u00e7\u00fcde azaltacak ve \u00e7evre dostu \u00fcretim s\u00fcre\u00e7lerine katk\u0131da bulunacak.<\/p>\n<p>Daha \u00f6ncede \u0130zmir\u2019de toplam 9,2MWp g\u00fcc\u00fcnde 3 farkl\u0131 GES projesini ba\u015far\u0131yla tamamlayan ASUNIM, bu \u00f6nemli proje ile OSB\u2019lerdeki enerji d\u00f6n\u00fc\u015f\u00fcm\u00fcne katk\u0131da bulunarak, sanayi b\u00f6lgelerinde daha ye\u015fil ve s\u00fcrd\u00fcr\u00fclebilir bir enerji yap\u0131s\u0131n\u0131n olu\u015fturulmas\u0131na destek sa\u011flayacak.<\/p>\n<p>Projenin bak\u0131m ve onar\u0131m hizmetleri, T\u00fcrkiye\u2019de 1GW referansa sahip olan <strong>ASUNIM<\/strong>\u2019in i\u015ftiraki olan <strong>MAXIMA Enerji<\/strong> taraf\u0131ndan y\u00fcr\u00fct\u00fclecek. Bu sayede, proje sadece kurulum a\u015famas\u0131nda de\u011fil, ayn\u0131 zamanda <strong>uzun vadeli performans<\/strong> ve <strong>verimlilik<\/strong> i\u00e7in g\u00fcvenilir bir hizmet sunulmas\u0131 hedefleniyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. ASUNIM, Renkler Makina ve Yedek Par\u00e7a San. ve Ticaret A.\u015e.\u2019nin \u0130zmir Kemalpa\u015fa OSB\u2019de bulunan fabrikas\u0131n\u0131n \u00e7at\u0131s\u0131na 3.32MW g\u00fcc\u00fcnde g\u00fcne\u015f enerji santrali (GES) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":190776,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[6742,6743,36606,26659,2206,114816,114817],"views":39,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/190774"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=190774"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/190774\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/190776"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=190774"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=190774"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=190774"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}