{"id":190762,"date":"2024-08-05T18:51:43","date_gmt":"2024-08-05T15:51:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=190762"},"modified":"2024-08-05T18:51:43","modified_gmt":"2024-08-05T15:51:43","slug":"giresun-daki-59-ges-turkiye-nin-yenilenebilir-enerjisine-katki-sagliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/giresun-daki-59-ges-turkiye-nin-yenilenebilir-enerjisine-katki-sagliyor\/","title":{"rendered":"(Turkish) Giresun\u2019daki &#8217;59 GES&#8217; T\u00fcrkiye\u2019nin Yenilenebilir Enerjisine Katk\u0131 Sa\u011fl\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/190762\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>\u0130l genelinde \u00e7ok say\u0131da firma, 27,6 megavat kurulu g\u00fcce sahip santraller \u00fczerinden i\u015fletmelerinin enerji ihtiyac\u0131n\u0131 kar\u015f\u0131l\u0131yor.<\/strong><\/h2>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-190765\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/giresun-daki-59-ges-turkiye-nin-yenilenebilir-enerjisine-katki-sagliyor.jpg\" alt=\"\" width=\"500\" height=\"281\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/giresun-daki-59-ges-turkiye-nin-yenilenebilir-enerjisine-katki-sagliyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/giresun-daki-59-ges-turkiye-nin-yenilenebilir-enerjisine-katki-sagliyor-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/giresun-daki-59-ges-turkiye-nin-yenilenebilir-enerjisine-katki-sagliyor-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2024\/08\/giresun-daki-59-ges-turkiye-nin-yenilenebilir-enerjisine-katki-sagliyor-80x45.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Giresun merkez ile \u015eebinkarahisar, Alucra, Bulancak, Espiye ve Tirebolu il\u00e7elerinde 59 GES bulunuyor. Y\u0131l boyunca sahil kesime g\u00f6re daha fazla g\u00fcne\u015fli g\u00fcn\u00fcn ya\u015fand\u0131\u011f\u0131 \u015eebinkarahisar ve Alucra il\u00e7elerindeki GES\u2019lerin 21\u2019i arazide, 9\u2019u ise binalar\u0131n \u00e7at\u0131s\u0131nda faaliyete al\u0131nd\u0131. Bu iki il\u00e7ede, \u0130l \u00d6zel \u0130daresi ve \u015eebinkarahisar Belediyesine ait 7 GES\u2019in daha kurulmas\u0131 planlan\u0131yor.<\/p>\n<h3><strong>\u201cYakla\u015f\u0131k Ayl\u0131k 1 Milyon Liral\u0131k Gelir Beklentimiz Var\u201d<\/strong><\/h3>\n<p><strong>\u015eebinkarahisar Belediye Ba\u015fkan\u0131 \u00d6mer \u015eent\u00fcrk<\/strong>, AA muhabirine, \u015eebinkarahisar ve Alucra il\u00e7elerinde y\u0131l\u0131n b\u00fcy\u00fck b\u00f6l\u00fcm\u00fcnde sahil kesimine g\u00f6re daha g\u00fcne\u015fli g\u00fcnlerin ya\u015fand\u0131\u011f\u0131n\u0131 s\u00f6yledi. \u015eent\u00fcrk, GES projelerinin son y\u0131llarda iki il\u00e7ede daha fazla yo\u011funla\u015ft\u0131\u011f\u0131n\u0131 belirterek, <em>\u201cBug\u00fcne kadar y\u00f6rede 30 GES projesi faaliyete girdi. Projelerle, g\u00fcne\u015ften elde edilen enerji \u00fclke ekonomimize kazand\u0131r\u0131l\u0131yor. B\u00f6lgedeki 30 santralin toplam kurulu g\u00fc\u00e7 kapasitesi 22,6 megavat.\u201d<\/em> dedi.<\/p>\n<h3><strong>\u0130l \u00d6zel \u0130daresinden 2,5 Milyon Dolarl\u0131k Yat\u0131r\u0131m Plan\u0131<\/strong><\/h3>\n<p><strong>\u0130l Genel Meclisi Ba\u015fkan\u0131 Ahmet \u015eahin<\/strong>, \u0130l \u00d6zel \u0130daresi olarak \u015eebinkarahisar il\u00e7esinde GES projesi hayata ge\u00e7irmeyi planlad\u0131klar\u0131n\u0131 aktard\u0131. B\u00f6lgede 52,5 d\u00f6n\u00fcm \u00fczerine yat\u0131r\u0131m yap\u0131lmas\u0131 i\u00e7in proje \u00e7al\u0131\u015fmalar\u0131n\u0131n devam etti\u011fini vurgulayan \u015eahin, \u015f\u00f6yle devam etti: <em>\u201cKurum olarak 3 bin 400 kilovat enerji giderimiz var. Projemiz tamamland\u0131\u011f\u0131nda kurumumuzun t\u00fcm enerji giderlerini bu \u015fekilde kar\u015f\u0131lam\u0131\u015f olaca\u011f\u0131z. Proje maliyetimiz \u015fu anda 2 milyon 500 bin dolar civar\u0131nda. Giderlerimizin yan\u0131 s\u0131ra buradan kuruma gelir kayna\u011f\u0131 da olu\u015fturaca\u011f\u0131z.\u201d<\/em><\/p>\n<p>Kaynak:\u00a0<a href=\"https:\/\/www.aa.com.tr\/tr\/ekonomi\/giresundaki-59-ges-turkiyenin-yenilenebilir-enerjisine-katki-sagliyor\/3294652#\" target=\"_blank\" rel=\"noopener\">AA<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130l genelinde \u00e7ok say\u0131da firma, 27,6 megavat kurulu g\u00fcce sahip santraller \u00fczerinden i\u015fletmelerinin enerji ihtiyac\u0131n\u0131 kar\u015f\u0131l\u0131yor. Giresun merkez ile \u015eebinkarahisar, Alucra, Bulancak, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":190765,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[2326,4640,2569,842,105],"views":29,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/190762"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=190762"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/190762\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/190765"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=190762"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=190762"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=190762"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}