{"id":19062,"date":"2013-12-09T18:00:54","date_gmt":"2013-12-09T15:00:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=19062"},"modified":"2013-12-10T10:28:03","modified_gmt":"2013-12-10T07:28:03","slug":"kasim-ayinda-4-hes-projesi-icin-ced-karari-verildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kasim-ayinda-4-hes-projesi-icin-ced-karari-verildi\/","title":{"rendered":"(Turkish) Kas\u0131m Ay\u0131nda 4 HES Projesi \u0130\u00e7in \u00c7ED Karar\u0131 Verildi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/19062\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kas\u0131m ay\u0131 i\u00e7inde 4 Hidroelektrik Santrali\u2019ne (HES) daha \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) olumlu karar\u0131 verildi. \u00c7evresel Etki De\u011ferlendirme Denetleme ve \u0130zleme Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, 4 HES i\u00e7in daha Kas\u0131m ay\u0131nda toplant\u0131lar\u0131n\u0131 tamamlayarak, nihai a\u015famaya gelen \u00c7ED Raporlar\u0131n\u0131 onaylad\u0131.<\/strong><\/p>\n<p><strong>HES\u2019LER\u0130N TOPLAM KURULU G\u00dcC\u00dc 57 MW<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/kasim-ayinda-4-hes-projesi-icin-ced-karari-verildi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-19063\" title=\"kasim-ayinda-4-hes-projesi-icin-ced-karari-verildi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/kasim-ayinda-4-hes-projesi-icin-ced-karari-verildi-300x186.jpg\" alt=\"\" width=\"300\" height=\"186\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/kasim-ayinda-4-hes-projesi-icin-ced-karari-verildi-300x186.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/kasim-ayinda-4-hes-projesi-icin-ced-karari-verildi-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/12\/kasim-ayinda-4-hes-projesi-icin-ced-karari-verildi.jpg 328w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>S\u00f6z konusu 4 HES Projesinin toplam kurulu g\u00fcc\u00fc ise 57 MW olarak belirlendi. Bu projeler \u015f\u00f6yle;<\/p>\n<p>-Mercan Enerji Bing\u00f6l G\u00f6k\u00e7e Reg\u00fclat\u00f6r\u00fc ve HES ile Malzeme Ocaklar\u0131 Projesi (25.704 MWe\/26.712 MWm)<\/p>\n<p>-KV Elektrik Ordu Balamir HES Projesi (15,018 MWm\/14,192 MWe kurulu g\u00fcc\u00fcnde 4 Reg\u00fclat\u00f6r ve 4 HES)<\/p>\n<p>-Has Enerji Kastamonu Mutlu Reg\u00fclat\u00f6r\u00fc ve HES Projesi (6,00 MWm\/5,72 MWe)<\/p>\n<p>-Bat\u0131\u00e7im Enerji Mu\u011fla \u00c7\u00f6kek HES Projesi (\u00c7\u00f6kek I Reg\u00fclat\u00f6r\u00fc ve HES, \u00c7\u00f6kek II Reg\u00fclat\u00f6r\u00fc ve HES) (10,76 MWm\/10,44 MWe)<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/kasim-ayinda-4-hes-projesi-icin-ced-karari-verildi_5980.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kas\u0131m ay\u0131 i\u00e7inde 4 Hidroelektrik Santrali\u2019ne (HES) daha \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) olumlu karar\u0131 verildi. \u00c7evresel Etki De\u011ferlendirme Denetleme ve \u0130zleme Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":19063,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[11086,2878,11083,4275,63,67,165,35370,1090,11085,11084,11087],"views":875,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19062"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=19062"}],"version-history":[{"count":5,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19062\/revisions"}],"predecessor-version":[{"id":19068,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/19062\/revisions\/19068"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/19063"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=19062"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=19062"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=19062"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}